Loading…
Loading…
Tender Value
₹49.3 L
EMD Value
₹1 L
Closing Date
8 Jun 2026, 5:00 pm3d left
EE RMC ENG
RMC
Construction of RCC Drain on both side of road at jayprakash nagar from jha ji hotel to khadgara under Ward No-29
2026_UDD_114685_1
276/eng 2026
Open Tender
Civil Works
120 days
As per NIT and RFP
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹1 L
1 Jun 2026
1 Jun 2026
9 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Dismantling pucca brick work including stacking serviceable materialsin countable stacks within 15m lead and disposal of unserviceable materials with all lead, all complete as per direction of E/I. | 155.59 | m3 | 541.67 | ₹84,278.44 |
| 2 | Providing,supplying & spreding of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials, labour,royality and taxes all complete as per specification and direction of E/I ( Mode of measurment compacted volume.) | 36.91 | m3 | 347.85 | ₹12,839.14 |
| 3 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of Boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | 62 | m3 | 1,756.4 | ₹1,08,896.8 |
| 4 | Reinforced cement concrete work in walls (any Thickness), including attached pilasters, buttresses, abutments, posts and structs etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) | 166.73 | m3 | 6,082.45 | ₹10,14,126.89 |
| 5 | Reinforced cement concrete work in beams, suspended floors, foors having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size). | 76 | m3 | 6,308.87 | ₹4,79,474.12 |
| 6 | Providing Tor steel reinforcement of 8mm & 10mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending, and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
8mm Dia. | 8.57 | M.T. | 83,314.02 | ₹7,14,001.15 |
| 7 | 10mm Dia. | 12.86 | M.T. | 82,096.54 | ₹10,55,761.5 |
| 8 | Centering and Shuttering including strutting, propping etc and removal of from for Foundation , footing , bases of columns etc for mass concrete. | 2,268.82 | m2 | 194.5 | ₹4,41,285.49 |
| 9 | (i) Sand (Lead Upto 42 km) | 104.37 | m3 | 819.06 | ₹85,485.29 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
Tendernotice_2.pdf
PDF • 1.80 MB
Tendernotice_3.pdf
PDF • 0.38 MB
Tendernotice_4.pdf
PDF • 0.41 MB
BOQ_155072.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid