Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.0 LAccepted-AOC | ₹54.0 L Quoted ₹45.8 L | L1 | Accepted-AOC L1 bidder is responsive as per TEC |
| 2 | L2₹46.2 LRejected-Finance | ₹46.2 L | L2 | Rejected-Finance TEC unanimously rejected |
| 3 | L3₹46.6 LRejected-Finance | ₹46.6 L | L3 | Rejected-Finance TEC unanimously rejected |
| 4 | L4₹48.8 LRejected-Finance | ₹48.8 L | L4 | Rejected-Finance TEC unanimously rejected |
| 5 | L5₹53.1 LRejected-Finance | ₹53.1 L | L5 | Rejected-Finance TEC unanimously rejected |
| Sl No | Description | Qty | Unit | Sushil Kumar Gupta and Co L5 | DEVESH CONSTRUCTIONS L3 | M/S VIKAS DUGGAL L4 | Kashmir Singh L2 | ASHOK KUMAR GARG CONTRACTOR L7 | ALHADIN CONSTRUCTION L1 | Cee Kay EPC Projects Pvt Ltd L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Material Required | ||||||||||
| 1.01 | Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF | 240 | Nos | 10,500 ₹25.2 L | 9,500 ₹22.8 L | 5,100 ₹12.2 L | 9,000 ₹21.6 L | 10,000 ₹24 L | 8,130 ₹19.5 L | 10,100 ₹24.2 L |
| 1.02 | Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF | 60 | Nos | 12,000 ₹7.2 L | 10,800 ₹6.5 L | 7,900 ₹4.7 L | 10,390 ₹6.2 L | 12,000 ₹7.2 L | 9,100 ₹5.5 L | 12,500 ₹7.5 L |
| 1.03 | Stay arrangement for 7M/8M steel poles of Galvanised Steel | 30 | Nos | 3,500 ₹1.1 L | 3,220 ₹96,600 | 5,000 ₹1.5 L | 3,800 ₹1.1 L | 4,000 ₹1.2 L | 2,500 ₹75,000 | 2,000 ₹60,000 |
| 1.04 | Formed OFC Dead End and Termination Fittings including all supporting items. | 60 | Nos | 1,400 ₹84,000 | 1,447 ₹86,820 | 3,000 ₹1.8 L | 1,200 ₹72,000 | 1,500 ₹90,000 | 1,500 ₹90,000 | 1,200 ₹72,000 |
| 1.05 | OFC suspension fittings including all supporting items. | 240 | Nos | 1,000 ₹2.4 L | 925 ₹2.2 L | 600 ₹1.4 L | 824 ₹2.0 L | 1,500 ₹3.6 L | 1,150 ₹2.8 L | 830 ₹2.0 L |
| 1.06 | Adjustable Cable Storage Bracket. | 60 | Nos | 750 ₹45,000 | 610 ₹36,600 | 5,000 ₹3 L | 550 ₹33,000 | 800 ₹48,000 | 750 ₹45,000 | 530 ₹31,800 |
| 2.00SERVICES REQUIRED | ||||||||||
| 2.01 | Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. and sign writing on poles with paint | 300 | Nos | 3,475 ₹10.4 L | 2,950 ₹8.8 L | 1,700 ₹5.1 L | 2,500 ₹7.5 L | 3,500 ₹10.5 L | 3,450 ₹10.3 L | 4,000 ₹12 L |
| 2.02 | Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. splicing & jointing of OF cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot. | 12 | Km | 42,000 ₹5.0 L | 30,000 ₹3.6 L | 1,56,000 ₹18.7 L | 50,000 ₹6 L | 65,000 ₹7.8 L | 41,900 ₹5.0 L | 52,000 ₹6.2 L |
Tender Value
₹58.9 L
EMD Value
₹1.2 L
Closing Date
18 Aug 2025, 2:00 pmClosed
AGM (MM)
O/o CGMT BSNL HP Circle, Block no.11, SDA Complex, Kasumpti, Shimla, HP-171009
Tender for comprehensive construction of ADSS OFC, including Supply and installation of related ADSS OFC accessories, supply and erection of 7m/8m tubular poles along with associated accessories, slinging of ADSS Cable, testing and commissioning
2025_BSNL_242882_1
HPCO-23/11/18/2025-CFA-HPCO
Open Tender
OFC Laying Works
1095 days
Dharamshala Business area
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,160
Yes
AO(Claim), O/o CGMT, BSNL HP
₹1.2 L
Yes
23 Feb 2026
28 Jul 2025
19 Aug 2025
28 Jul 2025
18 Aug 2025
28 Jul 2025
28 Jul 2025 - 8 Aug 2025
Amount
Material Required
Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF
Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF
Stay arrangement for 7M/8M steel poles of Galvanised Steel
Formed OFC Dead End and Termination Fittings including all supporting items.
OFC suspension fittings including all supporting items.
Adjustable Cable Storage Bracket.
SERVICES REQUIRED
Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. and sign writing on poles with paint
Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. splicing & jointing of OF cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot.
Construction of Joint Chamber as per EI supply & fixing of G.I. Pipe & PLB pipe for bringing down the of cable, supply of stone slab for covering the chamber and sand for filling the chamber
Installation of FDF and WSC/FTB, leading-in arrangement, jointing of pigtails and other related activity for construction of ADSS/Aerial OFC routes
Kashmir Singh (BID ID -886970)
DEVESH CONSTRUCTIONS (BID ID -887623)
M/S VIKAS DUGGAL (BID ID -888029)
Sushil Kumar Gupta and Co (BID ID -887324)
Cee Kay EPC Projects Pvt Ltd (BID ID -888030)
ASHOK KUMAR GARG CONTRACTOR (BID ID -887959)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid