Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.8 LAccepted-Finance 147 UDHYOG VIHAR PH I GURGOAN HARYANA 122016 | GURUGRAM | HARYANA | 122016 | L1 | Accepted-Finance Accepted | |
| 2 | Not Admitted-Fee/PreQual/Technical 11 SANJIV BAUG SOCIETY NEW SHARDA MANDIR ROAD PALDI AHMEDABAD GUJARAT 380007 | AHMADABAD | GUJARAT | 380007 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹47.3 L
EMD Value
₹94,520
Closing Date
9 Mar 2020, 3:00 pmClosed
Executive Engineer (Elect), IIT Madras
Executive Engineer (Electrical), Engineering Unit, IIT Madras, CHENNAI-600036
Construction of Annex building G plus 3 to existing Computer Science building at IIT Madras SH- Provision of 2 x 20 Passengers lifts
2020_IITM_43459_1
42-2019-20-ELDB
Open Tender
Electrical Works
Item Rate
365 days
IIT MADRAS
As per tender document specified
2 documents required · 2 mandatory
₹0
₹94,520
23 Sept 2020
17 Feb 2020
10 Mar 2020
17 Feb 2020
9 Mar 2020
18 Feb 2020
17 Feb 2020 - 17 Feb 2020
Amount
Design, manufactures, supply, installation, testing, commissioning, approvals / laisoning (All local / state/ central statutory bodies) and handing over in satisfactory working conditions of elevators including the cost of providing 2 weeks satisfactory trial operation and testing at full design load and safely checks for sudden breaks, speed, etc. as directed including cost of providing free comprehensive maintenance service during Defect Liability Period of 12 months after final completion and satisfactory handing over to Development Manager, complete as per specifications as required and as below:
Elevators
Cost of comperehensive maintenance of each lift include routine , preventive & break down maintenance for period of five years including repair / replacement of worn out iteams with minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will be taken into account for deciding the lowest tenter, but will be executed as a separate supplementary contract after the comletion of the warrantee period)
1 st Year AMC (Rate Only)
2 nd Year AMC (Rate Only)
3 rd YEAR AMC (Rate Only)
4 th Year AMC (Rate Only)
5 th Year AMC (Rate Only)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .