| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance | -15.10% | ₹3.7 L | L1 | Admitted-Finance |
| 2 | L2₹4.1 L+₹43,039.75 (11.8%)Admitted-Finance | -5.10% | ₹4.1 L+₹43,039.75 (11.8%) | L2 | Admitted-Finance |
| 3 | L3₹4.2 L+₹55,521.28 (15.2%)Admitted-Finance | -2.20% | ₹4.2 L+₹55,521.28 (15.2%) | L3 | Admitted-Finance |
| 4 | L4₹4.3 L+₹61,762.04 (16.9%)Admitted-Finance | -0.75% | ₹4.3 L+₹61,762.04 (16.9%) | L4 | Admitted-Finance |
| 5 | L5₹4.3 L+₹64,344.43 (17.6%)Admitted-Finance | -0.15% | ₹4.3 L+₹64,344.43 (17.6%) | L5 | Admitted-Finance |
Tender Value
₹5.1 L
EMD Value
₹43,028
Closing Date
8 Jun 2026, 3:00 pmClosed
Executive Engineer
Nagar Nigam Firozabad
Putting slab on the statue located in the park of Shaheed Shri Mangal Pandey behind Ward No. 31 Mata Mandir, laying granite and painting and painting and other repair work in Shri Parshuram Park.
2026_DOLBU_1148317_254
05/PWD_15vitt_Rajvitt/2026-27
Open Tender
Civil Works
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹508
Municipal Corporation
₹43,028
7 Jul 2026
18 May 2026
8 Jun 2026
18 May 2026
8 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift up to 1.50m and lead upto 30m and including filling watering and ramming of excavated earth in to the trenches or into the space between thebuildingand the sides of foundation trenches or into the plinth and removal anddisposal of surplus earthas directedby the Engineer In-charge upto a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) | 5.81 | Cum | 150 | ₹871.5 |
| 2 | providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26, Chepter-5, Item No.03 Spec- 4.1 ) | 0.49 | Cum | 5,650 | ₹2,768.5 |
| 3 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). | 0.4 | Cum | 8,100 | ₹3,240 |
| 4 | RCC Work Providing and laying inposition specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work upto plinth level :1:1.5:3 (1cement :1.5 coarse sand: 3graded stone aggregate 20mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No.8 Spec. No. 5.1). | 1.03 | Cum | 8,900 | ₹9,167 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). (PWDSOR 2025-26 Chapter No-05 Item No. 5.2 Si. No.11) | 0.63 | Cum | 9,000 | ₹5,670 |
| 6 | RCC work Providing and laying in position specified grade of reinforced cement concrete, Slab including the cost of centering, shuttering, finishing and excluding reinforcement - Above plinth level upto fifth floor level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No.10 Spec. No. 5.1). | 1.82 | Cum | 8,600 | ₹15,652 |
| 7 | Red sand stone work (machine cut edge) for wall lining etc. upto 10 metre height. Backing filled with a grout of average 12 mm thick cement ……………………… all complete | 52.76 | sqm | 2,335.45 | ₹1,23,218.34 |
| 8 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (D.S.R 2023-24 S.No. 10.01). | 3.81 | Qtl | 7,800 | ₹29,718 |
| 9 | 12 mm thick cement plaster with cement mortar in proportion of 1:4 cement & fine sand (Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. | 23 | sqm | 200 | ₹4,600 |
| 10 | Finishing Wall with Putty approved brand and manufacture and of required shade on undacoreted …......................... All complete. (PWD SOR 2025-26 Chapter No-08 Item No. 31 Spec. New). | 31.19 | sqm | 140 | ₹4,366.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.04 MB
BOQ_2152343.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .