Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
4 May 2026, 12:00 pmClosed
DIRECTOR SWACH PROJECT
BADI ROAD HAWALA KHURD UDAIPUR
Major works at Boys Ashram Hostel Lasadiya Salumber
2026_SWACH_552511_40
03/2026-27
Open Tender
Civil Works
Percentage
180 days
UDAIPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
DIRECTOR SWACH PROJECT
₹2.5 L
Yes
20 Apr 2026
20 Apr 2026
4 May 2026
20 Apr 2026
4 May 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | - | Sqm | - | - |
| 1.2 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | - | Cum | - | - |
| 1.3 | Random rubble dry stone Kharanja under floor. | - | Cum | - | - |
| 1.4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | Cum | - | - |
| 1.5 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | - | Cum | - | - |
| 1.6 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). | - | Cum | - | - |
| 1.7 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M15 grade Nominal Mix
1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). | - | Cum | - | - |
| 1.8 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meter lead. | - | Cum | - | - |
| 1.9 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix
1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | - | Sqm | - | - |
| 2Providing & laying broken glazed titles on roof ( broken glazed tiles not less than 9 Kg/Sqm) on top of hot bitumen @ 1.7 Kg/Sqm. (1.40 Kg of VG-40 (30/40 )grade and 0.30 Kg/Sqm. Of VG-10 (80/100) grade) and joints filled with cement mortar 1 :2 (1 cement:2 marble dust mixed with water proofing compund all complete as per direction of Engineer-in-charge. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
54TDLasadiyaSalumber.pdf
Tender Documents • 11.12 MB
BOQ_985387.xls
BOQ • 0.83 MB
DATECORR.pdf
PDF • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .