Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.1 LAccepted-AOC 87 MARIUM MAHAL SADAR BAZAR BARRACK PORE 24 NORTH PGS | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | ₹27.1 L Quoted ₹27.4 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹29.7 L+₹2.3 L (8.48%)Rejected-Finance 71 GOLA MAHAL SADAR BAZAR BARRACKPORE KOLKATA 700120 | 24 PARAGANAS NORTH | WEST BENGAL | 700120 | ₹29.7 L+₹2.3 L (8.48%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹30.6 L+₹3.2 L (11.6%)Rejected-Finance GC ROAD ABDUL LATIF ROAD PO TITAGARH KOLKATA 700119 | 24 PARAGANAS NORTH | WEST BENGAL | 700119 | ₹30.6 L+₹3.2 L (11.6%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹30.6 L+₹3.2 L (11.8%)Rejected-Finance 10 1 GROUND FLOOR WEST GHOSH PARA JAGATDAL JAGATDAL JAGATDAL NORTH 24 PARGANAS WEST BENGAL 743125 | 24 PARAGANAS NORTH | WEST BENGAL | 743125 | ₹30.6 L+₹3.2 L (11.8%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹30.7 L+₹3.3 L (12.2%)Rejected-Finance 117 LENIN SARANI KOLKATA 700 013 WEST BENGAL | KOLKATA | KOLKATA | WEST BENGAL | 700013 | ₹30.7 L+₹3.3 L (12.2%) | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | Shree Mahabir Builders L2 | RADHA ENTERPRISE L4 | KWALITY CONSTRUCTION L3 | RBS Builders L7 | JHAWAR SUPPLIERS L1 | BHARUKA ENTERPRISES L5 | NIRMAL DAS AND CO. L6 | UNIVERSAL TRADING CENTRE L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Cement Concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 31.75 | Cum | 790 ₹25,082.5 Lowest | 800 ₹25,400 | 825 ₹26,193.75 | 805 ₹25,558.75 | 800 ₹25,400 | 810 ₹25,717.5 | 805 ₹25,558.75 | 850 ₹26,987.5 |
| 2.00 | Demolition of Brick Work built in Cement Mortar including all Quoins, Arches, Pillars, etc. of any descriptions, complete all as specified and as directed. | 25.75 | Cum | 410 ₹10,557.5 | 400 ₹10,300 Lowest | 450 ₹11,587.5 | 449 ₹11,561.75 | 400 ₹10,300 Lowest | 410 ₹10,557.5 | 450 ₹11,587.5 | 420 ₹10,815 |
| 3.00 | Dismantling Wrought Iron or Mild Steel Work, viz. MS Flat Iron (Wind Tie) and Similar Work including MS Bolts, Nuts, etc., complete all as specified and as directed. | 3 | Qntl | 505 ₹1,515 | 521 ₹1,563 | 700 ₹2,100 | 600 ₹1,800 | 500 ₹1,500 Lowest | 600 ₹1,800 | 560 ₹1,680 | 650 ₹1,950 |
| 4.00 | Dismantling Floor, Hearth or Wall Tiling including Cement Mortar Bedding (but not backing), and removing rubbish off the Premises, complete all as specified and as directed. | 135 | Sqm | 40 ₹5,400 Lowest | 42 ₹5,670 | 40 ₹5,400 Lowest | 52 ₹7,020 | 50 ₹6,750 | 45 ₹6,075 | 45 ₹6,075 | 50 ₹6,750 |
| 5.00 | Taking down Cement Plaster of any description on Brick Walls, Concrete Surfaces including racking out joints, hacking for key, scrubbing down with Water, remove dust, debries/ rubbish, etc., complete all as specified and as directed. | 500 | Sqm | 45 ₹22,500 Lowest | 46 ₹23,000 | 45 ₹22,500 Lowest | 57 ₹28,500 | 50 ₹25,000 | 50 ₹25,000 | 52 ₹26,000 | 50 ₹25,000 |
| 6.00 | Demolition and breaking of drain pipe (salt glazed wire, AC or reinforced concrete) set in cement mortar for 150mm dia pipe complete all as specified and as direceted. | 150 | RM | 70 ₹10,500 | 72 ₹10,800 | 70 ₹10,500 | 72 ₹10,800 | 60 ₹9,000 Lowest | 75 ₹11,250 | 78 ₹11,700 | 75 ₹11,250 |
| 7.00 | Dismantling 100mm bore Cast iron pipe, jointed in cement mortar in foul places including necessary scaffolding upto four story height of building complete all as specified and as directed. | 22 | RM | 28 ₹616 Lowest | 30 ₹660 | 30 ₹660 | 35 ₹770 | 30 ₹660 | 32 ₹704 | 35 ₹770 | 40 ₹880 |
| 8.00 | Taking down PVC (SWR) soil/RWP pipe including all fittings such as bend shoe etc complete including necessary scaffolding complete all as directed by Engr-in-charge | 160 | RM | 20 ₹3,200 | 22 ₹3,520 | 22 ₹3,520 | 26 ₹4,160 | 15 ₹2,400 Lowest | 25 ₹4,000 | 30 ₹4,800 | 30 ₹4,800 |
| 9.00 | Excavation in trenches not exc. 1.5 Metre wide and not exc. 1.50 Metre in depth for foundation etc. or for shafts, wells, cess pits, manholes, pier holes etc. not exc. 10 Sqm on plan and not exc. 1.50 Metre in depth and getting out as in Soft/Loose Soil, complete all as specified and as directed. | 75 | Cum | 500 ₹37,500 | 510 ₹38,250 | 500 ₹37,500 | 603 ₹45,225 | 450 ₹33,750 Lowest | 505 ₹37,875 | 520 ₹39,000 | 680 ₹51,000 |
| 10.00 | Returning, Filling in, including Spreading, Levelling, Watering and Well Ramming in Layers not exc. 25 Cm as in Soft/Loose Soil, complete all as specified and as directed. | 60 | Cum | 210 ₹12,600 | 218 ₹13,080 | 220 ₹13,200 | 250 ₹15,000 | 150 ₹9,000 Lowest | 225 ₹13,500 | 220 ₹13,200 | 260 ₹15,600 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
22 Jul 2026, 4:00 pmClosed
SHRI RAKESH KUMAR
GARRISON ENGINEER (CENTRAL) KOLKATA NAPIER ROAD HASTINGS 700022
REPAIR / REPLACEMENT OF SEWGE LINE IN THE AREA OF 225 ASC COY (SUP), KP QTRS, GE (C) CENTRAL OF NAPIER ROAD UNDER GE (C) KOLKATA
2026_MES_771787_1
8942/E8
Open Tender
Miscellaneous Works
Item Rate
270 days
Kolkata
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE(CENTRAL) KOLKATA
₹50,000
Yes
5 Sept 2026
20 Jun 2026
23 Jul 2026
20 Jun 2026
22 Jul 2026
16 Jul 2026
20 Jun 2026 - 15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Cement Concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 31.75 | Cum | - | - |
| 2 | Demolition of Brick Work built in Cement Mortar including all Quoins, Arches, Pillars, etc. of any descriptions, complete all as specified and as directed. | 25.75 | Cum | - | - |
| 3 | Dismantling Wrought Iron or Mild Steel Work, viz. MS Flat Iron (Wind Tie) and Similar Work including MS Bolts, Nuts, etc., complete all as specified and as directed. | 3 | Qntl | - | - |
| 4 | Dismantling Floor, Hearth or Wall Tiling including Cement Mortar Bedding (but not backing), and removing rubbish off the Premises, complete all as specified and as directed. | 135 | Sqm | - | - |
| 5 | Taking down Cement Plaster of any description on Brick Walls, Concrete Surfaces including racking out joints, hacking for key, scrubbing down with Water, remove dust, debries/ rubbish, etc., complete all as specified and as directed. | 500 | Sqm | - | - |
| 6 | Demolition and breaking of drain pipe (salt glazed wire, AC or reinforced concrete) set in cement mortar for 150mm dia pipe complete all as specified and as direceted. | 150 | RM | - | - |
| 7 | Dismantling 100mm bore Cast iron pipe, jointed in cement mortar in foul places including necessary scaffolding upto four story height of building complete all as specified and as directed. | 22 | RM | - | - |
| 8 | Taking down PVC (SWR) soil/RWP pipe including all fittings such as bend shoe etc complete including necessary scaffolding complete all as directed by Engr-in-charge | 60 | RM | - | - |
| 9 | Excavation in trenches not exc. 1.5 Metre wide and not exc. 1.50 Metre in depth for foundation etc. or for shafts, wells, cess pits, manholes, pier holes etc. not exc. 10 Sqm on plan and not exc. 1.50 Metre in depth and getting out as in Soft/Loose Soil, complete all as specified and as directed. | 75 | Cum | - | - |
| 10 | Returning, Filling in, including Spreading, Levelling, Watering and Well Ramming in Layers not exc. 25 Cm as in Soft/Loose Soil, complete all as specified and as directed. | 60 | Cum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
TENDER8942.pdf
Tender Documents • 1.41 MB
BOQ_864242.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .