Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC ABU SAMAN SK VILL DADPUR PS REJINAGAR DIST MURSHIDABAD | MURSHIDABAD | WEST BENGAL | ₹2.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.5 LRejected-Finance | ₹2.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹2.5 LRejected-Finance 1 1E KHODAGONGE ROAD KOLKATA 700 010 | KOLKATA | KOLKATA | WEST BENGAL | 700010 | ₹2.5 L | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹4,950
Closing Date
12 Dec 2025, 2:00 pmClosed
Executive Engineer, MD-III, EM, KMDA
OFFICE OF THE EXECUTIVE ENGINEER, MECHANICAL DIVISION-III. E-M SECTOR. KMDA, 1, R.N. TAGORE ROAD , KOLKATA-700076
Repairing, servicing, overhauling and de-hydration of 2 nos. 630 kVA Transformer repairing and servicing of 450 mm. electrically actuator operated butterfly valve and allied works at Clear Water Booster Pumping Station under 48 MLD WTP Bally, Howrah
2025_KMDA_948637_1
KMDA/EM/EE/ MD-III/NIT-27 of 2025-26 Dated- 12.11.2025
Open Tender
Miscellaneous Works
21 days
Bally
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,950
OFFICE OF THE EXECUTIVE ENGINEER, MD-III
8 Jan 2026
26 Nov 2025
16 Dec 2025
26 Nov 2025
12 Dec 2025
26 Nov 2025
3 Dec 2025
Amount
Drain out transformer oil from the transformer as per requirement to the existing clean barrels. Opening of top cover, conservator tank, vent pipe, bucholz relay, etc. from the top of the transformer as per direction of the EIC.
Opening of cable box cover and total cables from the transformer and total connection from bushing & stud of the transformer as per direction of the EIC.
Changing of different gaskets for LT, HT side & oil seals of the transformer and finally charge the transformer as per direction of the EIC.
Supply of transformer oil for top up in the transformer as per direction of the EIC.
Dehydration & filteration of transformer oil of Transformer to raise the dielectric strength. The cost includes man, machinery, and tools & hire charges to complete at the site, testing of both LT & HT side cable of the transformer as per direction of the EIC.
Taking out sample of oil from Power/voltage transformer, OCB & testing their dielectric strength according to specification and submission of test result.
Opening the transformer breather and refitting the same after changing the silica gel including the supply of necessary gasket and silica gel.
Painting of transformer as per direction of the EIC.
Dismantling of electrically actuator operated butterfly valve of 450 mm. with gear box from the delivery line for pump no.4 as per direction of the EIC.
Repairing and servicing of electrically actuator operated butterfly valve and gear box of 450 mm. for pump no.4 as per direction of the EIC.
Transportation charges of valve from pump house to workshop and workshop to the pump house as per direction of the EIC.
Supply and delivery of nut, bolts, rubber gaskets, etc. at the site as per direction of the EIC.
Installation of the butterfly valve of 450 mm. with gear box for pump no.4 as per direction of the EIC.
Percentage Calibration and setting of electrical actuator for 450 mm. butterfly valve for pump no.4 as per direction of the EIC.
Supply of G. I. pipes of TATA make including necessary sockets. (a) 15 mm dia. (ii) Medium quality
Supply of G. I. pipes of TATA make including necessary sockets. (b) 20 mm dia. (ii) Medium quality
Supply of G. I. pipes of TATA make including necessary sockets. (f) 50 mm dia. (ii) Medium quality
Supply of G.I. reducing elbow. (i) 20 mm X 15 mm
Supply of G.I. plain equal elbow of approved brand and make. (ii) 20 mm
Supply of G.I. plain equal elbow of approved brand and make. (vi) 50 mm
Supply of G.I. plain tee of approved brand and make. (i) 15 mm
Supply of G.I. plain tee of approved brand and make. (ii) 20 mm
Supply of G.I. reducing tee of approved brand and make. (xii) 50 mm X 20 mm
Supplying, fitting and fixing gunmetal wheel valve of approved brand and make tested to 21 kg per sq. cm. (for water lines only). (vii) 25 mm dia
Repairing and servicing of total cooling pipe line of V.T pump as per direction of the EIC.
Supply, delivery & fixing of Pressure Gauge (0-10) kg/cm² for pump delivery line as per direction of the EIC.
Salvage @ 10% of sl. no.(15 to 24 & 26)
UTTAM AUTO ENTERPRISE (BID ID -7604750)
COSMOS CONSTRUCTION (BID ID -7590967)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf