| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 CrAccepted-AOC | ₹21.4 Cr Quoted ₹21.5 Cr | L1 | Accepted-AOC Accepted being Lowest Rate |
| 2 | L2₹21.9 CrRejected-Finance | ₹21.9 Cr | L2 | Rejected-Finance Rejected being Higher Rate |
| 3 | L3₹22.9 CrRejected-Finance | ₹22.9 Cr | L3 | Rejected-Finance Rejected being Higher Rate |
| 4 | L4₹23.4 CrRejected-Finance GULALI VATIKA GEETA VATIKA SHAHPUR DISTRICT GORAKHPUR | ₹23.4 Cr | L4 | Rejected-Finance Rejected being Higher Rate |
| 5 | L5₹24.6 CrRejected-Finance | ₹24.6 Cr | L5 | Rejected-Finance Rejected being Higher Rate |
Tender Value
₹28 Cr
EMD Value
₹42 L
Closing Date
6 Dec 2023, 12:00 pmClosed
S. E., Sultanpur-Amethi Circle, PWD, Sultanpur
S. E., Sultanpur-Amethi Circle, PWD, Sultanpur
Strengthening work from km 32.200 to 50.200 of Jais Mohanganj Inhauna Rudauli Road (major district road)
2023_CEUFZ_863690_1
3417/1Com.Sul.Amethi Circle/23 Date 16-11-2023
Open Tender
Civil Works - Roads
120 days
AMETHI
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,714
₹42 L
Yes
S. E., Sultanpur-Amethi Circle, PWD, Sultanpur
2 Mar 2024
21 Nov 2023
6 Dec 2023
21 Nov 2023
6 Dec 2023
21 Nov 2023
1 Dec 2023
Amount
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Ch. 32.200 to 35.200)
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement, over a prepared sub base, with approve grade cement @ 400 kg. per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with fixed form or slipform paver, spread, compacted and finished in a contiuous operation including provision of contraction expension, construction and longitudinal joint, joint filler separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compund, finishing to lines and grades as per drawing.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density with bitumenus Emulssion SS 3.5% and OPC cement@ 1% by wet of mix
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.2 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Earth Work in ordinary soil in makin patries on either side of the road earthwork in patries to be done in 20 cm layer including ramming and dressing the surface to required lavel and true to patri template with side slope of 1:2. (Mechanically Compacted)
Construction of H.P. culverts 900mm dia NP3 H.P. Excavation in foundation in ordinary soil including lift 1.5mt and lead up to 30M and including filling, filling, watering, ramming of excavation earth and also complete with all respect.
Cement concrete with 2 cm gauge stone gritt. Approved coarse sand and cement in the proportion of 6:3:1 insluding supply of all materials labour and T&P etc. required for poper completion of the work. S.I. 280
150 Class B/W in (1:4) cement and fine sand 1.25 finess modelus in error in foundation and plinth including supply of all materials, labour T&P etc. complete as per S.L.No. 305
Supply of 900 mm NP3 Hume Pipe and its coller including cartage etc. complete.
Layaing of 900mm dia NP3 Hume Pipe in proper posistion and joining them with coller and filling of jute and cement mortar in 1:2 cement and sand complete.
Rulled Pointing with cement mortal (1:2) consisting one part of cement and two part of fine sand including supply of all materials, labour T&P etc complete as per S.L.No. 574
Providing & Laying of Brick bats upto Half depth arround pipes as per Sl. No.-2 Material & S.L.- 255
Construction of U- Type Drain Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.50 in & lead upto 30 m Including filling watering & ramming of excavated earth into the trenches or upto the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30 m from the foundation trenches. (Including Royalty) S.I. 251
Cement concrete with 2 cm gauge stone gritt. Approved coarse sand and cement in the proportion of 6:3:1 insluding supply of all materials labour and T&P etc. required for poper completion of the work. S.I. 280
Providing plain/ Reinforced Cement Concrete in U-Tpye Drain as per Drawing and Technical Specifications S.I. 283
Mild steel or iron in plain work such as reinforeed concretc or reinforeed brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of ass steel and wastage and over lapping & hooks. S.I. 504.
SAMRAT INFRA ESTATE PVT.LTD
CIRRUS INFRA
M/s Vishal Construction
M/s Mahakaleshwar Infratech Private Limited
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf