| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAccepted-AOC | L1 | Accepted-AOC Being L1 and reasonable | |
| 2 | L2₹36.1 L+₹2.1 L (6.11%)Rejected-Finance | L2 | Rejected-Finance Othethan L1 | |
| 3 | L3₹39.5 L+₹5.5 L (16.1%)Rejected-Finance D 91 BLOCK D AMITY GREEN HASEMAU LUCKNOW PIN 226028 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226028 | L3 | Rejected-Finance Othethan L1 | |
| 4 | L4₹39.6 L+₹5.6 L (16.5%)Rejected-Finance | L4 | Rejected-Finance Othethan L1 | |
| 5 | L5₹39.7 L+₹5.7 L (16.8%)Rejected-Finance MOHANPUR PT LL HOUSE NO 00 CITY TOWN SILCHAR P O KATIRAIL P S KATIGORAH DISTRICT CACHAR PIN 788804 | CACHAR | ASSAM | 788804 | L5 | Rejected-Finance Othethan L1 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
26 Jun 2021, 6:00 pmClosed
GE(AF) GORAKHPUR
GE(AF) GORAKHPUR Pin-273008
GRASS CUTTING TO SIDE OF RUNWAY REPAIR TO SOUTHLOOP DISPERSAL, JOINT FILLING AND LINE MARKING IN TECH AREA AT AF STN GORAKHPUR
2021_MES_449149_1
8808/E8
Open Tender
Civil Works
Item Rate
330 days
GE(AF) GORAKHPUR
As per Tender Documents
8 documents required · 8 mandatory
₹500
Yes
GE(AF) GORAKHPUR
₹80,000
Yes
26 Jul 2021
7 Jun 2021
28 Jun 2021
7 Jun 2021
26 Jun 2021
21 Jun 2021
Amount
M&L for preparation and cleaning of old bituminous / concrete painted surface etc 10cm width or girth and applying one finishing coat of white/Black, golden, yellow, runway / road marking paint 1st quality complete all as specified and directed. Make: Shalimar paint/Berger paint/Asian paint
M&L for painting border lines, dashes, arrow, letters etc on road pavement and likes not exceeding 10 cm wide with road marking paint, white, golden yellow, black, orange complete all as specified and directed. Make: Shalimar paint/Berger paint/Asian paint
M&L for preparing of existing concrete surfaces / plastered / unplastered surface of wall and applying one coat of synthetic enamel paint in red and white with alternate square panel in runway / link / dispersal / side wall area complete all as specified and directed. Make: Shalimar paint/Berger paint/Asian paint
M&L for preparing of concrete surfaces and applying one coat of cement base paint on runway / taxi track / link / dispersal area complete all as specified and directed.
Demolition of cement Concrete surfaces of any description and in any position not otherwise specifically provided for pavement of taxi track/ runway/ Dispersal area complete all as specified and directed.
M&L for PCC work in pavement/hard-standing of flexural strength 40 kg/per square centimeter in field using 400 kg of cement per cubic metre, thickness of concrete 25 cm or less complete all as specified and directed.
Demolition of brick work built in cement mortar including all quoins, pillars etc but excluding ashlars facings, dressed stone work and pre-cast articles complete all as specified and directed.
Removing hard demolished material exc 250 m but n.exc 500m and depositing where directed.
M&L for brick work with sub class B bricks of old size, straight or curved on plan exc 6 m mean radius, built in cement mortar 1:4 complete all as specified and directed.
All as per item No. 10 above but except bricks using old bricks as obtained.
M&L for 15 mm thick rendering on fair faces of brick work or on concrete surface in CM 1:4 finished surface even and smooth without using extra cement complete all as specified and directed.
Dismantling bricks (laid flat or on edge) or brick tiles in floors, channels, kerbs, aprons, etc. (each layer) laid bedded pointed in any in any mortar complete all as specified and directed.
M&L for bricks, sub class B, laid flat, bedded and jointed in CM 1:6 and pointed in CM 1:3 in drain, old size bricks complete all as specified and directed.
All as per item No. 13 above but except bricks using old bricks as obtained.
M&L for repair to concrete slab or pavement of existing damage pot holes surface area not exc 10 SqCm and depth not exc 15.00 MM to triangular/rectangular/ circular/ oval shape & removing all broken and loose particle to a distance exc 100 mtr and cleaning the surfaces with compressed air to remove dust, dirt loose particles/sand/ foreign material and washing the surfaces with hydrochloric acid solution and filling with epoxy mortar, using epoxy hardener, base and quartz sand in ratio 1:2:21 mix as per manufacture instruction over one coat of epoxy primer including providing necessary from work as required complete all as specified and directed. Make:- Fosroc Chemicals/ STP Ltd/ Chokesy chemical/ Sika India Pvt Ltd/ Bostik India Pvt Ltd
M&L for repair to concrete slab or pavement of area not exc 1.0 Sqm each by cutting existing damage pot holes surface to triangular/rectangular/circular/ oval shape & removing all broken and loose particle to a distance exc 100 mtr and cleaning the surfaces with compressed air to remove dust, dirt loose particles/sand/ foreign material and washing the surfaces with hydrochloric acid solution and filling with epoxy mortar, using epoxy hardener, base and quartz sand in ratio 1:2:21 mix as per manufacture instruction over one coat of epoxy primer including providing necessary from work as required complete all as specified and directed. Make:-Fosroc Chemicals/ STP Ltd/ Chokesy chemical/ Sika India Pvt Ltd/ Bostik India Pvt Ltd
M&L for repair to concrete slab or pavement area exc 1.0 Sqm by cutting existing damage, chipped off concrete surface & removing all broken and loose particle to a distance exc 100 mtr and cleaning the surfaces with compressed air to remove dust, dirt loose particles/sand/ foreign material and washing the surfaces with hydrochloric acid solution and filling with epoxy mortar, using epoxy hardener, base and quartz sand in ratio 1:2:21 mix as per manufacture instruction over one coat of epoxy primer including providing necessary from work as required complete all as specified and directed. Make:- Fosroc Chemicals/ STP Ltd/ Chokesy chemical/ Sika India Pvt Ltd/Bostik India Pvt Ltd
M&L for raking out construction/dummy/expansion joint 25-30 mm wide and 40mm deep average previously filled with sealing compound from the existing joint of runway/taxi track to required depth, cleaning by means of compressed air, application of primer on concrete controlling the depth of joint by using backup rod/debonding rod of required dia & side of joint to be make regular shape and before pouring the PU material masking tape should be used and top 12mm primed and sealed with the using two component polyurethane based sealing compound with suitable primer as per manufacturers instruction all as specified and directed. Make-: Cipy polyurethanes Chemicals Pvt. Ltd./ Sika India Pvt Ltd/Fosroc Chemicals/STP Pvt Ltd/Maruti Bitumen Pvt Ltd/Bostk India Pvt. Ltd./Choksey Chemicals Pvt Ltd/Supreme Bitumen India Pvt Ltd/ SN Infratech Pvt Ltd
All as per item No. 18 above but for joint 20-25mm wide and 30mm deep.
All as per item No. 18 above but for joint 18-20mm wide and 25mm deep.
Cutting grass manual and removing material obtain from cutting/cleaning both side runway PTT near DTGM board complete all as specified and directed. Note:- Contractor will arrange his own 02 Nos mazdoor from 09.00 AM to 05.00 PM (including lunch break of 0.5 Hour at mid day) every day in week excluding Sunday (Holiday). however department will have the right to stop the work any time even in working day due to security point of view.
S&F 20 mm thick toughened glass (i.e. 5mm thick clear toughened glass and 5mm thick black toughened glass with 10 mm spacing between both the glass) as directed to be fixed with aluminium beading and rubber gasket in aluminium frame work as in ATC tower complete all as specified and directed.
Cutting grass mechanically operated 50 mm to 100 mm or above slasher where ever required including removing material obtain from cutting/cleaning (both side) up to 100m from the concrete edges complete all as specified and directed. Note:- (i) Contractor will arrange his own mechanical slasher (set of one tractor & Jungle Jeem) with POL & MT driver. The mechanical slasher will be in operation from 09.00 AM to 05.00 PM (including lunch break of 0.5 Hour at mid day) every day in week excluding Sunday (Holiday), however department will have the right to stop the work any time even in working day due to security point of view, 01 day shall be counted as 08 hours. (ii) The log sheet cum duty register will maintained by the contractor for record of work done and running of the tractor, this register will be signed by the contractor, JE (Civil), and Engineer-in-Charge and submitted to GE during payment. (iii) The rate quoted rate by contractor is including of all T&P, POL and operator mentioned above. (iv). On requirement contractor shall arrange more than one mechanical slasher per day as per order.
Arranging JCB with POL and driver in Technical area whenever required at Airfield. JCB will be in operation from 9.00 A.M to 5.00 P.M.
S&F in repair visible sign board of area/size exceeding 0.70 sqm and not exc 1.80 sqm each made from 4.00 mm thick engineering grade plastic (acrylic sheet) having monolithic structure to withstand, temperature variations from cold environment to sweltering hot conditions and to withstand high velocity winds, framed and braced with 40 mm dia PVC pipe best quality to with stand high velocity wind pressure, with ht of bottom of board should be 45 -60 cm above the ground level with best quality structure including excavating in post holes of size 30cmX30cmX 45cm and embedded in PCC 1:2:4 type B-1 using 20mm graded stone aggregate and making plinth around frame of width 600 mm and length as required, including providing and applying and weather resistance coating, providing and pasting of new numerals/alphabets with retro reflective tape cutting it as computer plotter etc complete all as specified and directed.
All as per item No. 25 above but area not exc. 0.70 Sqm each.
S&F in repair 4mm thick acrylic sheet of any size as in visible sign board complete all as specified and directed.
M&L for providing and pasting weather resistance retro reflective tape cutting, of new numerals/ alphabets with it as computer plotter 64 mm or as directed stroke width etc complete all as specified and directed. Note: Area shall be calculated from stroke length and width of numerals/alphabets.
Cleaning of drain of any shape and size of runway by removing sludge, soil, mud, grass and vegetation roots removing from site to distance exc 50 m etc complete all as specified and directed.
M&L for cutting of grass, shrubs, vegetation, bush weed by brush cutter operated slasher where ever required including removing waste of material obtained from cutting and cleaning (both side) from the edge of runway & PTT and removal of spoil beyond 250 mtr but not exceeding 500 mtr and deposited where as directed complete all as specified and as directed. Notes:- (i) Contractor will arrange his own 02 brush cutter machines and minimum 02 operator & 02 helper with POL per day comprises of 08 hours working including lunch break of 0.50 hours. (ii) The minimum output of brush cutter for one day is 1000 sqm, hence area of 1000 sqm will be after removal of spoil up to the entire satisfaction. (iii) Site for brush/grass cutting will be given by Air Force authority as per their requirement through out the contract period.
Material and labour for preparing of existing construction/ contraction/ dummy expansion joints including removing filled material in joints of runway by removing the cracking out joints 25 to 30mm wide and 40 mm deep including removing all loose material and cleaning the joints with brush and removing all loose fine particles with compressed air and applying the bituminous primer and sealing the joints by filling sealing compound grade 'B' (Jet fuel resistant) as per IS 1834-984 complete all as specified and directed. Note:- Material obtained from removing of existing filled up materials shall be removed out side of MOD land.
Material and labour for preparing of existing construction/contraction/dummy expansion joints including removing filled material in joints of runway by removing the cracking out joints 20 to 25mm wide and 40 mm deep including removing all loose material and cleaning the joints with brush and removing all loose fine particles with compressed air and applying the bituminous primer and sealing the joints by filling sealing compound grade 'B' (Jet fuel resistant) as per IS 1834-984 complete all as specified and directed. Note:- Material obtained from removing of existing filled up materials shall be removed out side of MOD land
Rolling and consolidating formation surfaces, sub grade/ runway shoulder with power roller of capacity exceeding 8 tonnes and not exceeding 12 tonnes complete all as specified and directed.
M&L 100mm thick PCC 1:2:4 type B-12 using 40mm graded mechanically crushed stone aggregate as in floor laid in alternate bays complete all as specified and directed.
M&L for PCC 1:4:8 type D-2 using 40mm graded stone aggregate as in foundation filling or mass concrete complete all as specified and directed.
M/S ARORA CONSTRUCTION
Matrubhoomi Construction
M/S B.P. CONSTRUCTION
M/S BHARAT CONSTRUCTION
M/s Comfort Air Conditioning and Refrigeration Engineers
PANKAJ AND BROTHERS
DEEP ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .