Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹2.1 L+₹14,369 (7.24%)Accepted-Finance DHALIWAL | L2 | Accepted-Finance ok | |
| 3 | L3₹2.1 L+₹14,550.80 (7.33%)Accepted-Finance | L3 | Accepted-Finance ok | |
| 4 | L4₹2.6 L+₹61,817.10 (31.2%)Accepted-Finance | L4 | Accepted-Finance ok |
Tender Value
₹1.7 L
EMD Value
₹4,150
Closing Date
20 Aug 2020, 5:00 pmClosed
Executive Officer MC Solan
Executive Officer MC Solan
Construction of Nallah/path from Mangat Ram house to Lakkar Bazzar Solan.
2020_UDDHP_39812_1
TEN(5)20/2020-3357,06/08/2020
Open Tender
Civil Works
Item Rate
90 days
MC Solan
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Executive Officer MC Solan
₹4,150
5 Sept 2020
14 Aug 2020
21 Aug 2020
14 Aug 2020
20 Aug 2020
14 Aug 2020
Amount
Earth work in excavation for structures in all depths as per drawings and technical specification as per Clause 305.1(Three hundred Five point One) of MORD specifications 300 (three hundred) including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated Suitable materials.as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Carriage of materials by manual labour loading ,unloading up to 100mt
Disposal of all Excavated Earth by mechanical transport up to 5km.
Providing and laying cement concrete 1:6:12 (1 cement:6 sand :12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in: Foundation and plinth. as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Providing form work with steel plates 3.15 (Three point One Five ) millimetres thick welded with angle iron in frame 30*30*5 (Thirty into Thirty into Five ) millimetres, so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies in all heights of propping and cantering below supporting floor to ceiling and removal of the same in-situ-reinforced concrete and plain concrete work as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges in: (a) Flat surfaces such as soffits of suspended floors, roofs,landings and the like.Floors etc.upto 200mm. In thickness
(b) Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like.
Providing and laying cement concrete work1:2:4(1 cement:2sand: 4graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation and plinths.as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Providing mild steel/Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level :Tor Steel as per H.P. PWD. Specification, including carriage of all labour, equipment and materials to various locations through all modes of transportation in all leads and lifts, including all incidental charges.
Brick work using 2nd class common burnt clay building bricks in foundation and plinth in Cement mortar 1:6 (1 cement : 6 sand)
Providing and fixing precast checkered tiles 20mm thick in Red Colour laid in floors, treads of steps and landing on a bed of 25mm average thickness of cement mortar 1:6 ( 1cement,6sand) jointed with neat cement slurry mixed with pigment to match the colour of tile.as per H.P. PWD. Specification, including carriage of all labour, equipment and materials to various locations through all modes of transportation in all leads and lifts, including all incidental charges.
Nitin Sharma
Bhupender Jaswal Contractor
Vinay SHarma
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .