Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹21.9 L+₹67,718.60 (3.19%)Admitted-Finance 53 HOUSING BOARD COLONY PHASE II UDHAMPUR 182101 J K | UDHAMPUR | UDHAMPUR | J K | 182101 | L2 | Admitted-Finance | |
| 3 | L3₹22.0 L+₹77,937.85 (3.67%)Admitted-Finance OLD NO 338 NEW NO 17 19TH NEDUMANEHLIAN STREET G K M COLONY CHENNAI 600 082 | CHENNAI | CHENNAI | TAMIL NADU | 600082 | L3 | Admitted-Finance | |
| 4 | L4₹22.8 L+₹1.6 L (7.67%)Admitted-Finance NO 3 JAMI JAM KHAN ROAD 1ST LANE ROYAPETTAH CHENNAI 600 014 | CHENNAI | CHENNAI | TAMIL NADU | 600014 | L4 | Admitted-Finance | |
| 5 | L5₹24.5 L+₹3.3 L (15.4%)Admitted-Finance 63 2ND MAIN ROAD NGO COLONY ADAMBAKKAM CHENNAI 600 088 | CHENNAI | CHENNAI | TAMIL NADU | 600088 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s.Sai Agency L8 | EVEREST ENGINEERING WORKS L5 | SAI ENGINEERING WORKS L1 | ARK Enterprises L6 | G.L.THIRUMALAI NAIDU AND COMPANY L4 | PSK Enterprises L7 | vijay kumar gupta and co L2 | GK ENTERPRISES L3 | NAVEEN ENTERPRIESES L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exc 1.5m in width and 1.5 M in depth and getting out excavated soil soft/loose soil.complete all as specified and directed | 142.56 | Cum | 170 ₹24,235.2 | 300 ₹42,768 | 180 ₹25,660.8 | 200 ₹28,512 | 180 ₹25,660.8 | 170 ₹24,235.2 | 100 ₹14,256 Lowest | 150 ₹21,384 | 270 ₹38,491.2 |
| 2.00 | Returning filling including spreading, levelling, watering and well ramming in layers not exc 25cm complete all as specified and directed | 74.69 | Cum | 110 ₹8,215.9 | 45 ₹3,361.05 | 160 ₹11,950.4 | 100 ₹7,469 | 63 ₹4,705.47 | 71 ₹5,302.99 | 20 ₹1,493.8 Lowest | 55 ₹4,107.95 | 60 ₹4,481.4 |
| 3.00 | Removing excavated material / soil to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed. | 25.1 | Cum | 120 ₹3,012 | 70 ₹1,757 | 60 ₹1,506 | 100 ₹2,510 | 72 ₹1,807.2 | 71 ₹1,782.1 | 20 ₹502 Lowest | 40 ₹1,004 | 60 ₹1,506 |
| 4.00 | Supply and lay fine sieved excavated dry soil cushioning spreading levelling for cable trenches all as specified and directed (Punned thickness only shall be measured and paid) complete all as specified and directed | 42.77 | Cum | 350 ₹14,969.5 | 20 ₹855.4 Lowest | 800 ₹34,216 | 500 ₹21,385 | 180 ₹7,698.6 | 98 ₹4,191.46 | 400 ₹17,108 | 130 ₹5,560.1 | 200 ₹8,554 |
| 5.00 | Supply and laying well burnt bricks sub class 'B' in trenches for cable protection of U/G cable all as specified and directed. | 4,224 | Each | 9 ₹38,016 | 11 ₹46,464 | 7 ₹29,568 | 15 ₹63,360 | 6.3 ₹26,611.2 | 5.3 ₹22,387.2 | 5 ₹21,120 Lowest | 7 ₹29,568 | 7 ₹29,568 |
| 6.00 | Taking down the existing damage / unservicable LT under grund cable any description of the followings size from trenchs /walls/poles/floors etc and depositing where directed at site and size 16 sqmm 4 core core complete all as specified and directed
Note :- Excavation and earth work will be measured under replacement items | 580 | RM | 35 ₹20,300 | 10 ₹5,800 | 100 ₹58,000 | 75 ₹43,500 | 36 ₹20,880 | 26 ₹15,080 | 5 ₹2,900 Lowest | 8 ₹4,640 | 10 ₹5,800 |
| 7.00 | All as per item No 6 above but size 25 sqmm 4 core | 80 | RM | 35 ₹2,800 | 12 ₹960 | 270 ₹21,600 | 75 ₹6,000 | 72 ₹5,760 | 26 ₹2,080 | 10 ₹800 Lowest | 10 ₹800 Lowest | 20 ₹1,600 |
| 8.00 | Laying only the under ground cable any type obtained from Item No 06 above in trench/wall/floor etc are connecting with suitable cable lugs/sleevs etc and size 16 sqmm 4 core complete all as specified and directed. | 80 | RM | 50 ₹4,000 | 20 ₹1,600 | 290 ₹23,200 | 100 ₹8,000 | 63 ₹5,040 | 26 ₹2,080 | 15 ₹1,200 Lowest | 20 ₹1,600 | 30 ₹2,400 |
| 9.00 | All as per item No 8 above obtained from Item No 09 but size 25 sqmm 4 core complete all as specified and directed | 40 | RM | 50 ₹2,000 | 30 ₹1,200 | 280 ₹11,200 | 100 ₹4,000 | 90 ₹3,600 | 26 ₹1,040 | 15 ₹600 Lowest | 20 ₹800 | 30 ₹1,200 |
| 10.00 | Supply & Lay underground XLPE insulated armoured LT UG electric cable heavy duty with aluminium conductor 1100V grade in trenches fixed on wall (or) passing through pipes/in floors connecting up testing and commissioning of of size 16 sqmm 4 core complete all as specified and directed. | 500 | RM | 300 ₹1,50,000 | 170 ₹85,000 | 260 ₹1,30,000 | 275 ₹1,37,500 | 135 ₹67,500 | 215 ₹1,07,500 | 110 ₹55,000 Lowest | 180 ₹90,000 | 220 ₹1,10,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
8 Aug 2026, 6:55 pmClosed
GE Chennai
GARRISON ENGINEER FORT SAINT GEORGE CHENNAI - 600009
REPAIRS/MAINT REPLACEMENT OF STREET LIGHTS/FLOOD LIGHTS, LT POLES AND CONNECTED WORKS UNDER GE CHENNAI
2026_MES_777976_1
8968/E8
Open Tender
Civil Works
Item Rate
90 days
GE Chennai
As per tender documents
7 documents required · 7 mandatory
₹500
GE Chennai
₹60,000
Yes
11 Aug 2026
11 Jul 2026
10 Aug 2026
11 Jul 2026
8 Aug 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exc 1.5m in width and 1.5 M in depth and getting out excavated soil soft/loose soil.complete all as specified and directed | 142.56 | Cum | - | - |
| 2 | Returning filling including spreading, levelling, watering and well ramming in layers not exc 25cm complete all as specified and directed | 74.69 | Cum | - | - |
| 3 | Removing excavated material / soil to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed. | 25.1 | Cum | - | - |
| 4 | Supply and lay fine sieved excavated dry soil cushioning spreading levelling for cable trenches all as specified and directed (Punned thickness only shall be measured and paid) complete all as specified and directed | 42.77 | Cum | - | - |
| 5 | Supply and laying well burnt bricks sub class 'B' in trenches for cable protection of U/G cable all as specified and directed. | 4,224 | Each | - | - |
| 6 | Taking down the existing damage / unservicable LT under grund cable any description of the followings size from trenchs /walls/poles/floors etc and depositing where directed at site and size 16 sqmm 4 core core complete all as specified and directed
Note :- Excavation and earth work will be measured under replacement items | 580 | RM | - | - |
| 7 | All as per item No 6 above but size 25 sqmm 4 core | 80 | RM | - | - |
| 8 | Laying only the under ground cable any type obtained from Item No 06 above in trench/wall/floor etc are connecting with suitable cable lugs/sleevs etc and size 16 sqmm 4 core complete all as specified and directed. | 80 | RM | - | - |
| 9 | All as per item No 8 above obtained from Item No 09 but size 25 sqmm 4 core complete all as specified and directed | 40 | RM | - | - |
| 10 | Supply & Lay underground XLPE insulated armoured LT UG electric cable heavy duty with aluminium conductor 1100V grade in trenches fixed on wall (or) passing through pipes/in floors connecting up testing and commissioning of of size 16 sqmm 4 core complete all as specified and directed. | 500 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_871317.xls
BOQ • 0.34 MB
Tender8968.pdf
Tender Documents • 0.68 MB
8968_OTHER_Corrigendum.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .