Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.6 CrAccepted-Finance | ₹1.6 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹1.7 Cr+₹2.8 L (1.68%)Rejected-Finance VILU TULSIPUR POST MOTIGANJ GONDA | GONDA | UTTAR PRADESH | 271001 | ₹1.7 Cr+₹2.8 L (1.68%) | L-2 | Rejected-Finance L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S ANIL KUMAR SINGH CONSTRUCTION AND GENERAL ORDER SUPPLIERS L2 | VINAY PRAKASH SHUKLA L1 |
|---|---|---|---|---|---|
| 1.00Bed Lining work | |||||
| 1.01 | Earth work excavation for pressure well and laying pipes in all types of soils including all lead and lift, labour, T&P etc. excluding mechanical compaction but inclusive of manual compaction and its proper disposal & back filling with dressing to profile complete. | 26,097.36 | Cum. | 140.01 ₹36,53,891.37 | 110 ₹28,70,709.6 Lowest |
| 1.02 | E/W in filling including lead upto 30m and lift 1.5 m excluding mechanical compaction but inclusive of manual compaction and dressing to profiles including all cost of labour,t&p etc | 5,020.28 | Cum. | 99.45 ₹4,99,266.85 | 95 ₹4,76,926.6 Lowest |
| 1.03 | Laying C.C- A 40 M10 in foundation of all structures with Cement O.P.C.,43 grade. course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. labour etc. | 66.49 | Cum. | 11,524.75 ₹7,66,280.63 Lowest | 11,820.26 ₹7,85,929.09 |
| 1.04 | Laying R.C.C, A-20, M-20 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 318.89 | Cum. | 12,192.84 ₹38,88,174.75 Lowest | 12,505.48 ₹39,87,872.52 |
| 1.05 | Providing and binding Steel Reinforcement in R.C.C. works including cutting fixing in position bending etc. required for proper completion of work including all lead lift labour material T&P etc. | 39.52 | MT | 72,255.59 ₹28,55,540.92 Lowest | 75,108 ₹29,68,268.16 |
| 1.06 | Centering & shuttering for P.C.C. Work including all labour material T&P with all lead and lift required for proper completion of work. | 261.82 | Sqm | 204.75 ₹53,607.65 Lowest | 220 ₹57,600.4 |
| 1.07 | Centering & shuttering for R.C.C. Work including all labour material T&P with all lead and lift required for proper completion of work. | 2,790.34 | Sqm | 487.5 ₹13,60,290.75 Lowest | 550 ₹15,34,687 |
| 1.08 | Supplying & Fixing 200mm dia HDPE pipe PE-100: 6Kg/sq.cm required for proper completion of work. including all cost of material.labour and T.&.P. etc. | 650 | RM | 1,277.25 ₹8,30,212.5 Lowest | 1,325 ₹8,61,250 |
| 1.09 | Dewatering with all cost of power POL machine pump, well point system & operator with assembling & dismantling of equipment etc/kwh | 23,275.2 | KWH | 44.69 ₹10,40,168.69 Lowest | 45.84 ₹10,66,935.17 |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
20 Aug 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
Rapti Nahar Nirman Mandal 1 Balrampur
As per Tender Notice
2026_UPIDC_1174864_3
01/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
90 days
Tulsipur Balrampur
As per Tender Notice
2 documents required · 2 mandatory
₹2,350
₹3.4 L
Yes
10 Sept 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Bed Lining work | |||||
| 1.01 | Earth work excavation for pressure well and laying pipes in all types of soils including all lead and lift, labour, T&P etc. excluding mechanical compaction but inclusive of manual compaction and its proper disposal & back filling with dressing to profile complete. | 26,097.36 | Cum. | - | - |
| 1.02 | E/W in filling including lead upto 30m and lift 1.5 m excluding mechanical compaction but inclusive of manual compaction and dressing to profiles including all cost of labour,t&p etc | 5,020.28 | Cum. | - | - |
| 1.03 | Laying C.C- A 40 M10 in foundation of all structures with Cement O.P.C.,43 grade. course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. labour etc. | 66.49 | Cum. | - | - |
| 1.04 | Laying R.C.C, A-20, M-20 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc. | 318.89 | Cum. | - | - |
| 1.05 | Providing and binding Steel Reinforcement in R.C.C. works including cutting fixing in position bending etc. required for proper completion of work including all lead lift labour material T&P etc. | 39.52 | MT | - | - |
| 1.06 | Centering & shuttering for P.C.C. Work including all labour material T&P with all lead and lift required for proper completion of work. | 261.82 | Sqm | - | - |
| 1.07 | Centering & shuttering for R.C.C. Work including all labour material T&P with all lead and lift required for proper completion of work. | 2,790.34 | Sqm | - | - |
| 1.08 | Supplying & Fixing 200mm dia HDPE pipe PE-100: 6Kg/sq.cm required for proper completion of work. including all cost of material.labour and T.&.P. etc. | 650 | RM | - | - |
| 1.09 | Dewatering with all cost of power POL machine pump, well point system & operator with assembling & dismantling of equipment etc/kwh | 23,275.2 | KWH | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
lot3.pdf
Tender Documents • 8.35 MB
BOQ_2207859.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .