| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC | ₹5.4 Cr | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹6.9 Cr+₹1.4 Cr (26.1%)Rejected-Finance | ₹6.9 Cr+₹1.4 Cr (26.1%) | L2 | Rejected-Finance NOT L1 |
| 3 | L3₹7.1 Cr+₹1.6 Cr (30.3%)Rejected-Finance | ₹7.1 Cr+₹1.6 Cr (30.3%) | L3 | Rejected-Finance NOT L1 |
| 4 | Rejected-Technical F 31 INDUSTRIAL AREA PHASE VIII SAS NAGAR MOHALI 160071 | S A S NAGAR | PUNJAB | 160071 | - | - | Rejected-Technical REASON IN UPLOADED SUMMARY |
Tender Value
₹7.6 Cr
EMD Value
₹9.5 L
Closing Date
12 Aug 2022, 5:00 pmClosed
GENERAL MANAGER CIVIL
CIVIL DEPARTMENT NCL HQ SINGRAULI 486889
AS PER TENDER DOCUMENT
2022_NCL_249688_1
GM(C)/SGR/22-23/ETN-12 Dated 15.07.2022
Turnkey
Civil Works - Others
Item Rate
2125 days
BINA PROJECT NCL
AS PER NIT
8 documents required · 8 mandatory
₹9.5 L
SINGRAULI
26 Oct 2022
15 Jul 2022
13 Aug 2022
15 Jul 2022
12 Aug 2022
23 Jul 2022
15 Jul 2022 - 31 Jul 2022
22 Jul 2022
Amount
SURVEY, SOIL TESTING & DESIGN ENGINEERING COST
Detailed survey of the area within battery limit and submission of work
Sub-soil exploration, field & laboratory testing of samples and submission of report
Design Engineering cost for GA and detailed engineering design and drawing of all civil and structural works in the system
PRICE BREAKUP FOR CIVIL AND STRUCTURAL WORK
CIVIL WORK INCLUDING SITE DEVELOPMENT, ALL MATERIALS, LABOUR ETC.
Civil and Structural work including developmental work and infra-structure etc
Other misc. items (civil, structural, developmental & infrastructural) required to complete the project.
PRICE BREAKUP OF PLANT AND MACHINERY
SUPPLY: MECHANICAL SYSTEM
Pumps, motors, pipes, fitings etc. (as per NIT)
Process Equipment (as per NIT)
SUPPLY: ELECTRICAL SYSTEM
Electrical system (as per NIT)
ERECTION, INSTALLATION AND COMMISSIONING OF PLANT AND MACHINERY
Design Engineering cost for mechanical and electrical systems
Erection, installation and commissioning of all plant and machineries of mechanical and electrical systems
OPERATION AND MAINTENANCE COST OF EXISTING STP AND PROPOSED NEW UNITS FOR A PERIOD OF 5 YEARS (DLP) DEFECT LIABILITY PERIOD
Cost of P&M maintenance during DLP excluding first year i.e. the warranty period
Store cost for maintenance of P&M (Mech.+Elect.) for 2nd, 3rd, 4th & 5th year
Operation and maintenance of STP and related pumping stations with all required repairs of all installed pumps and motors for regular and uninterrupted round the clock pumping for effective sewage treatment including deployment of minimum 5 1/4 nos.man power per day with all risk and cost of the contractor as per instruction of EIC for 5 years period inclusive of @ 15% of contractor's margin(Suitable deduction shall be made for idle pumping hours in STP due to delay in repairing of pumps and Motors. etc.)
Sewer pipe line maintenance including cleaning of sewer pipes, trenching all depths, refilling all complete as per instruction of the EIC (Conctractor has to deploy 9 Nos. of sweepers daily with bamboo, rope etc.)
Procurement of testing apparatus, reagents and daily testing of raw and treated sewage for parameters like TSS, BOD, PH and O&G as per norms at the house lab. and weekly testing from laboratory approved/recognised by MOEF/CPCB/NABL/Govt. of India as per the instruction of EIC and obtaining consent letters and daily recording of quantity of flow of sewage/treated sewage by flowmeter etc all complete during 5 years period.
Repairing and maintenance of sewage pumps (submersible) including replacement of damaged oil seal, motor cooling oil, rewinding of motors up to 30 HP (Old copper wire of winding to be returned to the department) including lowering, lifting and over hauling as per Instruction of EIC etc. all complete during 5 years period.
Repairing and maintenance of sewage pumps & motors including replacement of damaged oil seals, motor cooling oil, rewinding of motors upto 30 HP(old copper wire of winding to be returned to department) including lowering, lifting and over hauling as per Instruction of EIC etc. all complete during 5 years period.
Supplying of lubricants, grease, gland packing ,gear oil etc. for equipment and greasing of equipment during 5 years period.
Carriage of Sludge by mechanical transport including loading, unloading and stacking, lead-1 km.
FREIGHT, PACKING & FORWARDING COST
Freight, Packing & forwarding cost of all mechanical and electrical systems etc (as per NIT)
Total impact of GST for the purpose of CTC
MECO TECHNOLOGIES PVRIVATE LIMITED
Brij Engineering Works
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .