| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 CrAccepted-Finance SHOP NO 102 PHASE 3 NEAR GATE NO 3 NEW AUTO MARKET HISAR 125001 HARYANA | HISAR | HISAR | HARYANA | 125001 | L1 | Accepted-Finance L1 |
Tender Value
₹26.1 Cr
EMD Value
₹52.2 L
Closing Date
5 Mar 2026, 5:00 pmClosed
General Manager (P)
General Manager (P), National Highways and Infrastructure Development Corporation Limited. Regional Office, 2nd Floor, AgnishantiBusiness Park, Opp. AGP Office GNB Road, Ambari, Guwahati- 781001
STMC works between Km 238.78 to Km 253.88 (Bhuja to existing Patharkandi Bypass),Km 263.28 to Km 264.78 (Kachubari to Chandkhira Grant Pt II) on NH 8 (New) at the Risk and Cost of the Concessionaire in Assam in FY-25-26
2026_NHIDC_899669_1
AS/KJ/STMC/NH37SilChu5/25-26/1
Open Tender
Civil Works
Percentage
365 days
Assam
Please refer Tender Documents
5 documents required · 5 mandatory
₹11,800
NHIDCL
₹52.2 L
NHIDCL, RO Guwahati
14 Mar 2026
20 Feb 2026
6 Mar 2026
20 Feb 2026
5 Mar 2026
20 Feb 2026
20 Feb 2026 - 23 Feb 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Mechanical Means (Bituminous course) | 3,677 | cum | 559.3 | ₹20,56,546.1 |
| 1.02 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Manual Means
Granular Course | 15,128.64 | cum | 797.3 | ₹1,20,62,064.67 |
| 1.03 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.) | 6,858.32 | cum | 3,947.23 | ₹2,70,71,366.45 |
| 1.04 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) | 8,218.32 | cum | 4,715.97 | ₹3,87,57,350.57 |
| 1.05 | Prime Coat
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(II) With bitumen emulsion-CSS-1 ( IS-8887-2004 ) | 1,69,320 | sqm | 66.64 | ₹1,12,83,484.8 |
| 1.06 | Tack Coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(II) With Bitumen Emulsion CSS-1 (IS:8887-2004)
'(c) Granular surfaces treated with primer | 1,69,320 | sqm | 19.04 | ₹32,23,852.8 |
| 1.07 | Dense Graded Bituminous Macadam (50mm) (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects) ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.)
(III) with 30/40 or VG-40 grade Bitumen (msa>30)
NOTE: DLP of 36 months shall be applicable for this item | 8,715 | cum | 11,106.27 | ₹9,67,91,143.05 |
| 1.08 | Tack Coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(II) With Bitumen Emulsion CSS-1 (IS:8887-2004)
' (a) Normal bituminous surface | 1,69,320 | sqm | 15.47 | ₹26,19,380.4 |
| 1.09 | Bituminous Concrete (30mm)(Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 509 complete in all respects) (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.)
'(III) with 30/40 or VG-40 grade Bitumen (msa>30)
NOTE: DLP of 36 months shall be applicable for this item | 5,079.6 | Cum | 12,036.85 | ₹6,11,42,383.26 |
| 1.1 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes and conforming to the MoRT&H specifications
NOTE: DLP of 36 months shall be applicable for this item | 6,349.5 | sqm | 892.5 | ₹56,66,928.75 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
RFP.pdf
Tender Documents • 0.90 MB
BOQ_945654.xls
BOQ • 0.30 MB
Corrigendum-VI.pdf
PDF • 0.05 MB
STMCPackage5COR-5.pdf
PDF • 1.31 MB
20824_Corr-IV-PKG-05.pdf
PDF • 0.68 MB
20819.pdf
PDF • 0.78 MB
20806.pdf
PDF • 1.05 MB
20801.pdf
PDF • 4.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .