Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | -5.86% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.1 L+₹8,359.51 (4.10%)Admitted-Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | -2.00% | ₹2.1 L+₹8,359.51 (4.10%) | L2 | Admitted-Finance |
Tender Value
₹2.2 L
EMD Value
₹4,320
Closing Date
5 Sept 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Constt. of 01 no. Community Compost pit at gujjran basti near masjid w.no 6 pyt jinder, 01 no.Community Compost pit at w.no 6 at raipur gujjran in pyt jinder,01 no. Community Compost pit near H/O Rajinder lal w.no 6 at pyt Phinder, 01 no. Community
2026_RDPR_322699_1
e_NIT No. 500 -REWJ of 2026-27 dated 29-08-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹4,320
10 Sept 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
5 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil : | 8.64 | cum | 479.3 | ₹4,141.15 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.84 | cum | 4,826.5 | ₹8,880.76 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3.24 | cum | 5,733.6 | ₹18,576.86 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in
foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 9.72 | cum | 7,571.55 | ₹73,595.47 |
| 5 | Honey-comb brick work 10/11.4 cm thick with common burnt clay (non-modular) bricks
of class designation 75 in superstructure above plinth level upto floor five level in
cement mortar 1:4 (1 cement : 4 coarse sand) including curing complete | 6.48 | sqm | 713.1 | ₹4,620.89 |
| 6 | Plastering 12mm thick | 118.8 | sqm | 266.2 | ₹31,624.56 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 27 | sqm | 286.35 | ₹7,731.45 |
| 8 | Structural steel work in single section, fixed with or without connecting
plate, including cutting, hoisting, fixing in position and applying a priming
coat of approved steel primer all complete. | 252 | kg | 120.8 | ₹30,441.6 |
| 9 | Add provision of Transparent Fiber sheet | 6 | no | 3,000 | ₹18,000 |
| 10 | Carriages of material by MT Sand 20 km | 11.76 | cum | 409.94 | ₹4,820.89 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1083773.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .