Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
23 Sept 2024, 5:00 pmClosed
Superintending Engineer Electricity Distribution C
Superintending Engineer Electricity Distribution Circle-Unnao
Quantum of works involved in construction of new 11 KV/LT line and LT S/S for G/S to different consumers (For load upto 50 KW) and different works under the full deposit scheme under the area of EDSD-Ist and IIIrd under EDD-Ist, Unnao.
2024_MVVNL_955619_1
70/E.D.C./Unnao/2024-25
Open Tender
Electrical Works
Fixed-rate
180 days
UNNAO
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,180
A/C-No.3355002101008374,IFSCCode-PUNB0335500
₹5,000
4 Oct 2024
13 Sept 2024
24 Sept 2024
13 Sept 2024
23 Sept 2024
13 Sept 2024
Amount
Carriage of following materials from Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking distance as per indent.
ST/PCC Pole of diff. size
Other loose line materials with including conductor, Single and double Pole accessories, complete stay & earthing, insulator, x-arm, etc.
ACSR Weasel Conductor
Three Phase/Single Phase A.B. Cable of diff. size for LT Line
Carriage of following T/F from Elec. Store Center Unnao to diff. work dump site along with loading unloading and propoer stocking distance as per indent.
T/F 25 KVA / 63 KVA / 100 KVA
Fabrication/Modification of MS Items/Nuts & Bolts as requirement of site condition
Erection of PCC/ST Pole including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site.
Supply & Fixing of following materials for above job-
11 KV F-Clamp with N&B
Cross Arm Holding Clamps
Erection of PCC/ST double pole including digging of pits, fitting of all accessories along with cartage & dragging from dump site to pit site.
Supply & Fixing of following materials for above job-
Clamp for Top and Dropper channel with N&B
Making T-off arrangement including fabrication & fitting of accessories.
Supply & Fixing of following materials for above job-
Holding clamp for T-off Channel with N&B
Supply & Fixing of 3-Phase Fuse Unit system for T/F Protection at Double Pole
Grouting of PCC/ST Pole as per RESPO Norms with grouting materials.
Earthing as per RESPO Norms.
Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials.
Supply & Fixing of following materials for above job-
Stay Clamp with N&B
Laying stringing and sagging of O/H 11 KV Line Three Phase by Conductor including all associated work with joint/jumpers and binding of insulator as required.
Laying stringing and sagging of O/H Three Phase L.T. Line by ABC of diff. size including all associated work with joint/jumpers and binding of insulator as required.
Supply & Fixing of following materials for above job-
L.T. Clamp with Nuts & Bolts
L.T. Shackle Insulator
Bolts & Nuts for Shackle
Fixing of 3-Ph. Distribution Box with clamp, N&B with complete all work as required. (All the required materials as DB Box Clamps, Piercing Connectors, Nut & bolts etc for this job shall be provided by the contractor except Distribution Box)
Supply & Fixing of following materials for above job-
Clamp for Distribution Box with nut & bolt
Piercing Connector
Mounting of following Transformer on double pole including its cartage and dragging from dump site to pit site & installation and commissioning of T/Fs and All the jumpering & connection with the system are included in the scope of work. (All the required materials as 04 nos.-Al. Lugs for each T/F, Nut & bolts for S/S Angle etc for this job shall be provided by contractor except T/Fs)
T/F 25 KVA / 63 KVA / 100 KVA
Cutting of Tree Branches lying in the route of making new 11 KV/ LT Line
Safe Carriage of 25 KVA / 63 KVA / 100 KVA T/F from work dump site to Electricity store center Unnao with loading, unloading and proper stocking.
NOTE:- (1.) All the material provided by contractor shall be as per norms of UPPCL/RESPO. (2.) One carriage including loading/unloading from dump site to pit site is included in scope of work. (3.) During execution of work all risk will be of the contractor. (4.) Contractor will provide all T & P, vehicle and man power. (5.) All the old and used material should be taken on book. (6.) The quantity may be vary ±20%.
M/S NEW MAA KALYANI TRADERS
M/s PRAMENDRA SINGH
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .