Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC GODARA ESTATE KAIMRI ROAD 125001 | HISAR | HARYANA | 125001 | ₹1.5 Cr | L1 | Accepted-AOC Lowest Rates |
| 2 | L2₹1.6 Cr+₹7.5 L (5.07%)Rejected-Finance PANCHKULA | ₹1.6 Cr+₹7.5 L (5.07%) | L2 | Rejected-Finance Financially Evaluated by Committee |
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
21 Nov 2023, 2:00 pmClosed
ADARSH KUMAR SINGLA
EE PHE Division Tohana
Jallopur- Augmentation of water supply scheme laying of DI water supply pipeline in village Jallopur Tehsil Ratia Distt Fatehabad
2023_HRY_325216_1
2023817D244B 783C 4082 BE57 5B60D89C1410585PUH
Open Tender
Civil Works
Works
365 days
JALLOPUR
2 documents required · 2 mandatory
₹15,000
₹2.7 L
Yes
1 Jan 2024
31 Oct 2023
21 Nov 2023
31 Oct 2023
21 Nov 2023
31 Oct 2023
31 Oct 2023 - 21 Nov 2023
Amount
Works Details
Supply and Errection of 18 W LED Tube Light
Supply and Errection of 100 W LED Street Light
Less Credit of Old Bricks
Less Credit of Brick Bats
Provision for providing , FIXING, COOMISIONING $and TESTING GASEOUS TYPE FULL VACCUM CHHLORINATION SYSTEM CERTIFIED AND APPROVED BY BIS AND EXPOSIVE DEPT. GOVT. OF INDIA WITH ALL ACCESORIES complete in all respect...
Supply and Errection of 12 W LED Based Solar Light Street Light and pole of 5 mtr with RMS above ground level complete in all respect.
Credit of RCC NP2 Pipe 300 mm Dia
Supply ,Errection, Testing and Commisioning of Horizontal Split Casing RAW WATER Pumping Set CI Body SS Impeller Gland Pack duly coupled to Suitable rating of Motor 1440 RPM on a common Base Plate HAVING DISCHARE 1900 LPM HEAD 25 M
Supply of Chlorine Gas for Gaseous Chlorination
Operation and Maintenance for existing water works and complete scope of work covered under this contract as per OandM schedule for a period of 4 year after successful completion of 12 month`s defect liability period and 3 Months trial run complete in all respect as per approved NIT. The amount will be charged to the A/Mtc. estimate. The existing water works, its structures and distribution will be maintained and operated by agency/contractor from the date of complete scope of work covered under this contract complete in all respect as per as per OandM schedule and approved DNIT (operation only during defect liability period)
Operation and Maintnence for 1st year
Operation and Maintnence for 2nd year
Operation and Maintnence for 3rd year
Operation and Maintnence for 4th year
Bidder Name
Amount
M/S YASHPAL & CO.(GSTN-06AAAFY3550F1ZD)
Balbir Singh Contractor(GSTN-NA)
Balbir Singh Contractor
M/S YASHPAL & CO.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .