Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC KAMARPATTY HOUSE NO 80 GUWAHATI 01 P O PANBAZAR DIST KAMRUP M ASSAM | MARIGAON | ASSAM | 782103 | ₹4.3 Cr Quoted ₹4.2 Cr | L1 | Accepted-AOC Awarded |
| 2 | L1₹4.2 CrRejected-Finance MIRZA MD RAIHAN 4TH BYE LANE SAHAB TILA M T ROAD BAMUNIMAIDAM GEETANAGAR GUWAHATI KAMRUP M ASSAM 781021 | KAMRUP | KAMRUP M | ASSAM | 781021 | ₹4.2 Cr | L1 | Rejected-Finance Not Admitted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not admitted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not admitted |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
29 Nov 2019, 2:00 pmClosed
Chief Irrigation, (MI),Assam
O/o Chief Engineer (I),Irrigation,Assam, Ghy-03
Installation of Electrical/Solar powered Tube Well Schemes under PMKSY-HKKP Access to ground water for the year 2019-20.
2019_ID_14848_1
NIT No 12 (PMKSY-HKKP) 2019-20 Dt. 20.11.2019
Open Tender
Civil Works
Item Rate
90 days
Goalpara, Dhubri, Mankachar
Please refer Tender documents.
7 documents required · 7 mandatory
₹10,000
EE,Dudnoi division Irrigation,Assam
₹9.4 L
Yes
3 Aug 2020
20 Nov 2019
29 Nov 2019
20 Nov 2019
29 Nov 2019
21 Nov 2019
Amount
INSTALLATION OF TUBE WELL :
Preparation of site for placement of the drilling rig including excavation of mud pit, circulation drain, collection chamber etc. all complete as directed.
Movement of Rig from the Divisional Head Quarter to the drilling site including cost of P.O.L. all complete as directed.
Transportation of all ancillary equipments, camp materials, welding set, rig accessories etc. from Divisional Head Quarter to worksite to and fro including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from Divisional H.Q.
Transportation of all store materials like pipes, strainer, cone, socket, clamp, bentonite etc. from Divisional Head Quarter to worksite to and fro including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from Divisional H.Q.
Transportation of air compressor from the Divisional Head Quarter to the drilling site with all accessories including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from Divisional H.Q.
Transportation of P.O.L. all complete as directed.
Construction of temporary accommodation and low cost sanitary facility for drilling staff including cost of camp materials viz. cots, tables, chairs, utensils, dresses, safety helmets etc. and dismantling the accommodation after completion of the work all complete as directed.
Providing water supply facilities at drilling site all complete as directed. (a) By installing 1 Nos. of Singur hand pump
Boring in soft soil / normal clay / sandy soil by bit of size either 5 5/8" or 6 7/8" or 7 7/8" and collecting sample of soil at every 3.0 m depth or wherever there is a change of strata in sample boxes with the distinguishing marks including arranging and carriage of necessary boring materials / tools / bentonite etc. and withdrawing the drill pipe for lowering well assembly etc all complete as directed.
Boring in hard soil / pebble / gravel by bit of size either 5 5/8"or 6 7/8" or 7 7/8" and collecting sample of soil at every 3.0 m depth or wherever there is a change of strata in sample boxes with the distinguishing marks including arranging and carriage of necessary boring materials / tools / bentonite etc. and withdrawing the drill pipe for lowering well assembly etc all complete as directed.
Reboring in soft soil / normal clay / sandy soil by bit of size either 8 1/2" or 9 5/8" or 12" from either 5 5/8" or 6 7/8" or 7 7/8" all complete as directed.
Reboring in hard soil / pebble / gravel by bit of size either 8 1/2" or 9 5/8" or 12" from either 5 5/8" or 6 7/8" or 7 7/8" all complete as directed.
Developing of the D.T.W. with air compressor, Make- Kirloskar / Cumins all complete as directed.
Supplying and packing pea gravel around the periphery of casing including screening, washing etc. all complete as directed.
Supply of Materials
i) 150mm dia UPVC Casing Pipes (IS : 12818/1992)
ii) 100mm dia UPVC Casing Pipes (IS : 12818/1992)
iii) 100 mm dia UPVC Ribbed Screen Pipe
iv) 65mm Sluice Valve
v) 100mm PVC Cone
vi) 150mm PVC End Cap
vii) 150 x 100 PVC Reducer
viii) PVC Solvent Cement (500ml container)
ix) PVC Solvent Cement (1000ml container)
Labour charge for sinking, lowering, fitting, fixing in position of 100 mm dia U.P.V.C. pipe assembly comprising of strainer, pipes and cone in potable water bearing strata, washing the bore well etc. and supplying necessary jointing materials including carriage of materials and cleaning and priming the tube well all complete as directed. (a) For 0 to 50 m depth
Labour charge for sinking, lowering, fitting, fixing in position of 150 mm dia U.P.V.C. pipe assembly comprising of strainer, pipes and cone in potable water bearing strata, washing the bore well etc. and supplying necessary jointing materials including carriage of materials and cleaning and priming the tube well all complete as directed. (a) For 0 to 50 m depth
Labour charge for providing bentonite clay packing (including the cost of bentonite clay) arround 150/200 mm dia tube well upto a depth of 6 m from top with 250 mm dia boring including supplying the bentonite clay and carriage of materials all complete as directed and specified.
Labour charge for installation of Submersible pump set including supplying, carrying, fitting and fixing suction pipes of required length with G.I. Specials such as socket, bend, G.I. flange, M.S. Clamps and necessary jointing materials including commissioning and testing the pump but excluding only the cost of column pipe all complete as required as directed (upto 30.00m depth) (b) (i) 65 mm dia column pipe upto 30 m depth
Supplying, fitting, fixing MS clamp of size 15 mm thick and 150 mm width having projection of 300 mm and three holes of 20 mm dia for clamping the plates by 16 mm dia hexagonal bolts of length 75 mm and nuts on both sides encircling the column pipe including two coat of enamel paint over one priming coat of different dia all complete as directed and specified. (b) 150 mm dia
Supply & Installattion of 3 HP Submersible Electrical Pumpset working with Single phase Power Supply with 230 V ± 10% variation and Dynamic Head range 10 Metres to 20 Metres with minimum discharge capacity 400 LPM (0.0085 Cumec), efficiency 70% (Minimum) of repute make conforming to IS:8034-2002 suitable for 150mm dia Tubewell including all accessories like Motor Cable (2 ´ 4mm2) upto 50 Metre length, Column pipe of dia 100mm upto 18 Metres alongwith Cable Clamps/ Clip 10 Nos, Delivery Bend 1 No of 100 mm dia, Tubewell assembly support MS Clamp 100 mm dia-2 pairs etc. in complete as directed (Rates are as per Market price)
LT Electrical Power Connection:- LT Electrical Power connection to the Control Panel from the nearest point of LT overhead line owned by APDCL including supply and erection of service cable alongwith necessary supports like Poles, Insulators, Cross-arms etc. as required by the department under supervision of APDCl. The payment to APDCL for connection of 2.5 kW power shall be in the scope of the work (i) Supply and erection of 7.5 metre long PSC pole of standard dimension for 230 Volt overhead line including digging of Earth pit (0.75 m ´ 0.5 m) having a depth of 1/5th of the pole length with PCC Base Plate of size 60 cm ´ 60 cm ´ 12 cm at the bottom, refilling with boulder packing (size 150mm to 200 mm), refilling the voids with soil and hard ramming as directed.
(ii) Supply and erection GI Angle Cross Arm of size 50mm ´ 50mm ´ 6 mm ´ 600mm
(iii) Supply and erection of LT Pin Insulator 5 kN on existing GI Cross Arm with GI Pin, Nuts & Bolts with washer including drilling of holes as directed.
(iv) Supply, laying and erection of AAA Squirrel conductor for overhead line, binding to insulators and tensioning with uniform standard sag including jumpering, connection as directed.
(v) Supply, fitting & fixing of 2 Core ´ 6 mm2 for service connection from PSC Pole to Energy Meter and upto Control Panel
(vi) Cost of Energy Meter payable to APDCL
(vii) Load Security payable to APDCL
Supplying, erection, testing and commissioning Havells or equivalent make custom-built Control Panel, stand mounted, dust and vermin proof starter cum switching panel for operation of 3 HP, 230V, 1-Ph, 50 Hz Submersible Pump made up of CRCA steel sheet 1mm thick, having Iron Angle Stand made of 4 nos of 32mm ´ 32mm ´ 5 mm ´ 1 metre long iron angle, having provision for fitting the cubicle with proper size nuts & bolts and having a welded rain protecting canopy at the top and to be erected firmly with necessary CC grouting as directed. The cubicle size shall be 288mm ´ 242mm ´ 144mm and shall contain the following electrical accessories neatly wires with proper size single core HRFR unsheathed copper wire.[Rate as per departmentally approved] 1. 2 pole, 25 Amp, AC 3, Air break contactor 2. Thermal overload relay 3. Double pole MCB, C curve, 10 kA4. Capacitor 50 mfd 5. Capacitor 36 mfd 6. Ampere + Volt analog meter 7. Terminal block, 5 way 8. Heavy duty 25 Amp, ON push button switch 9. OFF push button switch 10. pilot indicating lamp
CONTROL PANEL SHED
Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lifts as directed and specified in the following classification of soils including bailing out water where necessary as directed and specified. (A) Up to a depth of 2.00m below the existing ground level. a) In ordinary soil
Earth/ sand filling in plinth in layers not more than 150mm thick including necessary carriage, watering, ramming etc. complete as directed and specified including payment of land compensation, forest royalty, sales tax and other duties and taxes as may be necessary.
Providing and laying plain/reinforced cement croncrete works cement, coarse sand & 20mm down graded stone aggregate including dewatering if necessary, and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (form work and reinforcement will be measured and paid separately) (I) Using Mixer Machine (a) In substructure up to plinth level Foundation, footing, columns with base tie and plinth beam, pile cap, base slab, retaining walls, walls of septic tank, inspection pit and the like and other works not less than 100mm thick up to plinth level. N) Without using admixture, plasticiser a) M15 grade concrete or Prop. 1:2:4
b) In Super structure from plinth level upto Ist floor level ii) Columns, pillars, posts, struts, suspended floor, roof, landing, shelf and support, balcony, lintel, sill band, beam, girder, bressumer, cantilever, staircase (except spiral staircase and landing ) including preparing the top surface and finishing of nosing. N) Without using admixture, plasticiser a) M15 grade concrete or Prop. 1:2:4
Providing soling in foundation and under floor at all levels with stone/best quality picked jhama bricks, sand packed and laid to level and in panel after rected including all labour and materials and if necessary dewatering , complete preparing the subgrade as directed a) Brick Flat soling
Brick work in cement morter with 1st class brick including racking out joints and curing complete as directed in substructure upto Plinth level. a) In prop. 1:5
(II) In superstructure above plinth level up to 1st floor level. (c) In proportion 1:5.(1 cement:5 sand)
Providing form work of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and propping etc., height of propping and centering below supporting floor to ceiling not exceeding 4.0M and removal of the same for in-situ reinforced concrete and plain concrete work in: Foundation, footings, bases of columns, pile cap, raft and mass concrete works etc. (b) Using 25mm thick plank
Sides of tie beams, grade beams etc. at or below ground level. (b) Using 25mm thick plank
Columns, Pillars, Posts & Strut (ii) Using 25mm thick plank
Sides and Soffits of Beams, beam haunchings, cantilever girders, bressumers, lintels and horizontal ties. ii) Using 25mm thick plank
Flat Surfaces such as soffits of suspended floors, roofs, landings, cantelever slabs, chajjas, balconies and the like. (a) Floors etc. upto 200mm in thickness. (ii) Using 25mm thick plank
Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. (No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) (Upto 1st floor level) b) Other ISI approved TMT reinforcement bar (SAI/BISCON/THERMAX) For Assam Type Bldg., drain works,,retaining wall&boundary wall etc. .
c) ISI approved Mild steel reinforcement bar(M.S.Bar)
25 mm thick cement concrete topping 1:2:4 (1cement : 2 coarse sand : 4 coarse aggregate of 12 mm nominal size) finished with a floating coat of neat cement finish to be laid in panels including curing complete as directed.
15 mm thick Cement plaster in single coat on single or half brick wall for interior plastering up to 1st floor level including arises, internal rounded angles, not exceeding 80mm girth and finished even and smooth including curing complete as directed. A) On rough side b) In cement mortar 1:4
B) On fair side b) In cement mortar 1:4
Providing, fitting and fixing steel windows/ ventilators (fixed) of standard rolled steel sections as per relevant I.S. Code, joints mitred and welded with 15mmx3mmx100mm lugs embedded in cement concrete block of M-10 grade including applying a coat of red-lead primer.
a) Colour washing with lime on wall surface (two coats) over and including a priming coat of white washing to give an even shade after throughly brooming the surface to remove all dirt, dust, mortar drops and other foreign matter.
b) Extra over item no. (a) above for every subsequent coat of colour wash with lime on wall surfaces.
Painting (two coats) over and including a priming coat of approved quality to give an even shade after throughly cleaning the surface to remove all dirt, dust, mortar drops and other foreign matter.
M/S Nirman
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .