Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC | L1 | Accepted-AOC Lowest Tenderer | |
| 2 | L2₹21.1 L+₹4.9 L (29.9%)Rejected-Finance | L2 | Rejected-Finance Other than Lowest Tenderer | |
| 3 | L3₹21.5 L+₹5.2 L (32.0%)Rejected-Finance | L3 | Rejected-Finance Other than Lowest Tenderer | |
| 4 | L4₹22.1 L+₹5.9 L (36.0%)Rejected-Finance | L4 | Rejected-Finance Other than Lowest Tenderer | |
| 5 | L5₹22.8 L+₹6.5 L (39.7%)Rejected-Finance | L5 | Rejected-Finance Other than Lowest Tenderer |
Tender Value
Refer Docs
EMD Value
₹73,280
Closing Date
27 May 2021, 6:00 pmClosed
GE NAGROTA
GE NAGROTA
MANNING AND OPERATION OF PUMP HOUSE AT SECTOR F, G, H AND K UNDER GE NAGROTA.
2021_MES_438748_1
GEN-04/2021-22
Open Tender
Miscellaneous Works
Item Rate
334 days
NAGROTA
Class D and above and category d (v)
8 documents required · 8 mandatory
₹500
GE NAGROTA
₹73,280
Yes
25 Jun 2021
27 Apr 2021
29 May 2021
27 Apr 2021
27 May 2021
12 May 2021
Amount
Manning and Operation for 01 FGM per shift of water supply installation at Dug Well No. 06 for operating entire water supply installations under DUG Well NO. 6 including pump sets with starters, bleaching dozer, LT panels & sluice valve etc, each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 0600 hrs to 1400 Hrs (ii) IInd shift 1400 hrs to 2200 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at Dug Well No. 2 for operating entire water supply installations under DUG Well NO. 2 including pump sets with starters, bleaching dozer, LT panels & sluice valve etc each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 0600 hrs to 1400 Hrs (ii) IInd shift 1400 hrs to 2200 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at Dug Well No. 4 for operating entire water supply installations under DUG Well NO. 4 including pump sets with starters, bleaching dozer, LT panels & sluice valve etc, each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. (i) Ist shift: 0600 hrs to 1400 Hrs (ii) 2nd shift: 1400 hrs to 2200 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at Long Term Filtration Plant for operating entire system including alum dozing system, cleaning of algae/vegetation grown from the upper surface of sedimentation tank and clarifloculators , back washing of filter beds regularly each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift: 0600 hrs to 1400 Hrs (ii) 2nd shift: 1400 hrs to 2200 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at 4 ASD for operating entire water supply installations under 4 ASD including pump sets with starters, bleaching dozer, LT panels & sluice valve etc each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift: 0600 hrs to 1400 Hrs (ii) 2nd shift: 1400 hrs to 2200 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at Long Tern Main Intake Pump House for operating entire water supply installations under Long Term including pump sets with starters, bleaching dozer, LT panels & sluice valve etc each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift: 0600 hrs to 1400 Hrs (ii) 2nd shift: 1400 hrs to 2200 Hrs (iii) IIIrd shift: 2200 hrs to 0600 Hrs
Note:- Applicable for items No 01 to 6 (a) The quoted rate shall be demed to inclusive the followings operation. (i). Preventive and breakdown maintenance of all the equipments by regular oiling, changing of gland packing, replacement of nuts and bolts etc during the period of work order. (ii). To take care of house keeping and environment cleanliness, area upto 5 m all around the installation shall be kept absoultely neat and clean. (iii). Provisioning stationary, safety equipments, tools testing equipments, maintaining all records, log sheets deemend to be included in the rate quoted. (iv). The contractor has to supply uniform to their employee for wearing during the working hours. The unit rate is deemed to be included Uniform shall be blue colour pant and shirt with " GE Nagrota" written on back of shirt and on pocket. The pattern of the uniform shall be as decided by Engr-In Charge.
(v). The rate qouted is deemed to be inclusive of providing moblie communication system to the operator detailed so that feed back can be obtained. (vi). The satety precuations for the operator will be the responsibility of the contractor & unit rate is deemed to included for the safety equipments. (vii). The rate quoted is deemed to be inclusive of the cost of T&P for maint work. (viii). To Maintain all the isntallation provided under this contract as per IE rule/Standard engineering practice. (ix). Minor repairs to gaskets, rewireable fuses and operation maint of any other parts required for proper functioning of installation. (X). Testing of effluent quality parameters shall be carried out by the contactor and cost of these testing chagres shall borne by the contractor. (b). The quoted rate shall not be deemed to inclusive the following operation (i). Mixing/ dosing /adding of chemicals and oil grease required for operation of the plant. However Sodium ypo chloride/bleaching powder required for chlorination will be provided by department.
M/S J N TRADERS
J S ENGINEERS
Skyline Encon
Nitika electricals and engineers works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .