Tender Value
₹4.0 Cr
EMD Value
₹7.9 L
Closing Date
20 Jul 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
ACE PWD ZONE AJMER
ACE PWD ZONE AJMER
STRENGTHENING AND WIDENING WORK OF ROAD HARIPURA CHAURAHA TO INDUSTRIAL AREA RAILA
2026_CEPWD_566734_2
NIT-07/2026-27 PWD ZONE AJMER
Open Tender
Civil Works
180 days
BHILWARA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Egras Challan Deposit
₹7.9 L
Yes
12 Jun 2026
12 Jun 2026
23 Jul 2026
12 Jun 2026
20 Jul 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART 'A' ROAD WORK
Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means.In area of thorny jungle. | 3 | Hect | 12,746 | ₹38,238 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202. By Mechanical Means. Bituminous Courses & Granular Courses | 461.25 | Cum | 69 | ₹31,826.25 |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 2,460 | Cum | 25 | ₹61,500 |
| 4 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 23,730 | Cum | 44 | ₹10,44,120 |
| 5 | Granular Sub-base with Well Graded Material (Table 400-1) By Mix in Place Method.Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401.For Grading III Material | 6,485.25 | Cum | 407 | ₹26,39,496.75 |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406 By Mechanical Means with a lead of 1 Km. | 6,212.25 | Cum | 1,044 | ₹64,85,589 |
| 7 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 29,400 | Sqm | 28 | ₹8,23,200 |
| 8 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 29,400 | Sqm | 8.75 | ₹2,57,250 |
| 9 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 4.0 & 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 505 complete in all respects. Bitumen (VG-30). Grading - II (26.50 mm (Nominal Size)) | 1,470 | Cum | 6,260 | ₹92,02,200 |
| 10 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 5.2 & 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 507 complete in all respects . for Grading-II(13 mm nominal size) Bitumen (VG-30) | 882 | Cum | 7,241 | ₹63,86,562 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tendernotice_2.pdf
PDF • 23.42 MB
BOQ_1008263.xls
BOQ • 0.35 MB
02-Bid-Raila.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid