Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.3 L
EMD Value
₹3,400
Closing Date
25 Mar 2020, 2:00 pmClosed
SE/CEDC/M/CBE
O/o.SE/CEDC/M/CBE
Providing vitrified tiles and strengthening of portico columns at Urban division Tatabad Coimbatore
2020_EB_161393_1
35/2019-20
Open Tender
Civil Works
Works
60 days
Tatabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,400
Yes
2 Apr 2020
19 Mar 2020
26 Mar 2020
19 Mar 2020
25 Mar 2020
19 Mar 2020
Amount
Supplying and laying of double charged vetrified tiles, of 600x600x8mm of approved quality and colour with ISI make, laid in C.M.1:3, 20mm thick and pointing with white cement including finishing the joint , all labour, lead, lift, etc complete
Colour washing two coats with oil bound distember over existing colour washing after scrapping including cost of all materials, labour, lead, lift etc complete
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per standard specification etc complete.
Plain cement concrete in CC 1:4:8 using 40mm metal for foundation and basement including cost of all materials, labourconsolidation,curing, all lead, lift etc complete as per standard specification.
Reinforced cement concrete in C.C 1:1-1/2:3 mix using 12 to 20mm HBG machine crushed metal for plinth beams including cost of cement, all materials, labour, curing, vibration charges, with shuttering all lead, lift as per standard specification etc complete (but excluding cost of steel reinforcement)
Providing steel reinmforcement MS/RTS rods upto 16mm dia for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting , straightening bending, as per type design drawing placing aligning, and tying properly with all leads and lift as per standard specification etc complete.
Plastering with CM 1:5, 12mm thick including cost of cement, labour, curing all leads and lifts etc complete as per standard specification.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
SH INFRA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .