Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.0 L+₹5,400.58 (1.83%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.1 L+₹11,001.19 (3.73%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹3.1 L+₹18,502 (6.28%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹3.3 L+₹30,403.29 (10.3%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
7 May 2026, 6:00 pmClosed
Executive Engineer PWD (RandB) Division Ramnagar.
Executive Engineer PWD (RandB) Division Ramnagar.
PLEASE REFER TO BOQ
2026_PWDJK_308930_4
e-NIT No. 06 of 2026-27 Dated- 28-04-2026
Open Tender
Civil Works
Percentage
30 days
RAMNAGAR
PLEASE REFER TO NIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD (RandB) Division Ramnagar.
₹10,000
14 May 2026
28 Apr 2026
8 May 2026
28 Apr 2026
7 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil | 53.15 | cum | 479.3 | ₹25,474.8 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level ( 1 : 5 : 10)1 cement 5 coasre sand 10 stone aggregate grade , with 40mm nominal size . crushed | 6.08 | cum | 4,826.5 | ₹29,345.12 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level ( 1 : 3 : 6 ) with 20% boulders 1 cement 3 coasre sand 6 stone aggregate grade , with 20mm nominal size .crushed | 70.4 | cum | 4,774.46 | ₹3,36,121.98 |
| 4 | Centering and shittering including strutting propping etc and removal of form work Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs andsteps etc. | 106 | sqm | 628.95 | ₹66,668.7 |
| 5 | Carriage 0f material by mechanical transport including loading ,unloading and stacking completed sand lead up to 70 KM | 29 | cum | 961.94 | ₹27,896.26 |
| 6 | Carriage 0f material by mechanical transport including loading ,unloading and stacking completed stone aggregates below 40 mm size lead up to 5 km. | 50 | cum | 200.74 | ₹10,037 |
| 7 | Carriage 0f material by mechanical transport including loading ,unloading and stacking completed stone aggregates above 40 mm size lead up to 5 km. | 5.41 | cum | 218.19 | ₹1,180.41 |
| 8 | Carriage 0f material by mechanical transport including loading ,unloading and stacking completed Stone lead up to 5 km. | 14.1 | cum | 236.16 | ₹3,329.86 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_1000588.xls
BOQ • 0.36 MB
6.pdf
PDF • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .