Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | -0.03% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 L+₹90 (0.03%)Admitted-Finance | +0.00% | ₹3.0 L+₹90 (0.03%) | L2 | Admitted-Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
4 Sept 2026, 5:00 pmClosed
Er. fayaz Ahmed
Executive engineer REW Ramban
as per nit
2026_RDPR_322655_3
e-Nit 15.4 of REW Ramban(Banihal , RAMSOO )
Open Tender
Civil Works
Percentage
ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Rambanayati Raj
₹6,000
Yes
17 Sept 2026
29 Aug 2026
5 Sept 2026
29 Aug 2026
4 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trench (not exceeding, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil 80% OR 20% | - | cum | 612.95 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 1 | cum | 5,733.6 | ₹5,727.87 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | - | cum | 5,402.9 | - |
| 4 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming ncoat of approved steel primer all complete. | 1 | kg | 120.8 | ₹120.68 |
| 5 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. 16.25.1 Made of G.I. wire of dia 3 mm | - | sqm | 635 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:foundation | - | sqm | 286.35 | - |
| 7 | Carriage of cement from source to site by mechanical transport or animal transport or by head load (STA) | 1 | ton | 1,219.8 | ₹1,218.58 |
| 8 | Carriage of Sand from source to site by mechanical transport or animal transport or by head load (STA) | - | cum | 2,643.12 | - |
| 9 | Carriage of Stone Aggregates below 20mm from source to site by mechanical transport or animal transport or by head load (STA) | 1 | cum | 2,643.12 | ₹2,640.48 |
| 10 | Carriage of Stone from source to site by mechanical transport or animal transport or by head load (STA) | - | cum | 1,586.61 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
BOQ_1083287.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .