| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹2.7 L+₹41,333.76 (18.0%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹2.9 L+₹58,770.64 (25.6%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | THANIGAIVEL L2 | V MANI L3 | VICTORY CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 20.7 | cum | 100 ₹2,070 Lowest | 100 ₹2,070 Lowest | 100 ₹2,070 Lowest |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 2.46 | cum | 2,000 ₹4,920 Lowest | 2,800 ₹6,888 | 2,000 ₹4,920 Lowest |
| 3.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete (Below GL) | 24.55 | Sqm | 120 ₹2,946 Lowest | 300 ₹7,365 | 200 ₹4,910 |
| 4.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete (Above GL) | 15.18 | Sqm | 150 ₹2,277 Lowest | 1,095 ₹16,622.1 | 750 ₹11,385 |
| 5.00 | Brick Work CM 1:5 mix using Country Bricks 83/4"41/4"23/4" including cost and conveyanceof all materials to work site and all labour charges etc. | 6.81 | cum | 6,000 ₹40,860 | 3,500 ₹23,835 Lowest | 5,000 ₹34,050 |
| 6.00 | Supplying and fabrication of steel in cluding cost and conveyance etc | 0.5 | MT | 77,000 ₹38,654 Lowest | 80,000 ₹40,160 | 80,000 ₹40,160 |
| 7.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 6.82 | cum | 9,100 ₹62,062 | 8,971.2 ₹61,183.58 | 5,000 ₹34,100 Lowest |
| 8.00 | Plastering with C 1:5 mix using 12mm TK including cost and conveyance all labour charges etc | 107.95 | Sqm | 287.47 ₹31,032.39 | 285.06 ₹30,772.23 | 200 ₹21,590 Lowest |
| 9.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsio paint including cost and conveyance etc | 107.95 | Sqm | 262.48 ₹28,334.72 | 262.48 ₹28,334.72 | 150 ₹16,192.5 Lowest |
| 10.00 | Supply and fixing of steel gate including cost conveyance etc | 250 | Each | 65 ₹16,250 Lowest | 107.81 ₹26,952.5 | 100 ₹25,000 |
Tender Value
Refer Docs
EMD Value
₹3,440
Closing Date
24 Sept 2026, 3:00 pmClosed
The Block develoment officer (BP),Arcot block
The Block develoment(BP),Arcot block
Construction of Compound Wall in PUE School at Sembedu Ozhalai H/O Sembedu Panchayat in Arcot Block
2026_RDTN_703592_1
A2/1711/2026
Open Tender
Civil Works
Works
90 days
The Block develoment(BP), Arcot block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,440
24 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 20.7 | cum | - | - |
| 2 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 2.46 | cum | - | - |
| 3 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete (Below GL) | 24.55 | Sqm | - | - |
| 4 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete (Above GL) | 15.18 | Sqm | - | - |
| 5 | Brick Work CM 1:5 mix using Country Bricks 83/4"41/4"23/4" including cost and conveyanceof all materials to work site and all labour charges etc. | 6.81 | cum | - | - |
| 6 | Supplying and fabrication of steel in cluding cost and conveyance etc | 0.5 | MT | - | - |
| 7 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 6.82 | cum | - | - |
| 8 | Plastering with C 1:5 mix using 12mm TK including cost and conveyance all labour charges etc | 107.95 | Sqm | - | - |
| 9 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsio paint including cost and conveyance etc | 107.95 | Sqm | - | - |
| 10 | Supply and fixing of steel gate including cost conveyance etc | 250 | Each | - | - |
stage.html
html • 0.02 MB
finance_845706.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_845706.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .