Loading…
Loading…
Tender Value
₹2.1 Cr
EMD Value
₹2.5 L
Closing Date
13 Feb 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
SRDENS
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V = Advertised value of the tender in crores of Rupees N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or(ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or(iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender.(b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or(ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or(iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components.(b) (2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity.(b)(3)To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contract or through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing
However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Defination of Similar Nature of Work : "Any track work" (Note :- 1. Fabrication of glued joints should be done by RDSO approved manufacturer as per extent guidelines on the subject. 2. Ballast supply/formation work will not be considered under this item)
13 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as STARTUPS shall be exempted from payment of Bid Security deposit detailed above on submission of Registration Certificate issued by appropriate authority.
It shall not be obligatory on the said authority to accept the lowest tender and no tenderer/tenderers shall demand any explanation for the cause of rejection of his/their tender.
If the tenderers deliberately gives/give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
If the tenderer/s expires after the submission of his/their tender or after the acceptance of his tender, the Rly. shall deem such tender as cancelled. If a partner of a firm expires after the submission of their tender or after the acceptance of their tender, the Railway shall deem such tender as cancelled unless the firm retains its character.
The Bid Security should be paid through online payment. In case the tenderer withdraw his offer within the validity period of his offer or fails to undertake the contract after acceptance of his tender the full Bid Security shall be forfeited. If the tender is accepted the amount of Bid Security will be retained and adjusted as security deposit for the due and faithful fulfillment of the contract. The Bid Security of the unsuccessful tenderers shall save as here-in-before provided be returned to the unsuccessful tenderers within a reasonable time but the Railway shall not be responsible for any loss or depreciation that my happen to the security for the due performance of the stipulation to keep the offer open for the period specified in the tender documents or to the Bid Security while in their possession nor be liable to pay interest thereon.
The tenderers shall keep the offer open for a minimum period as mentioned in NIT from the date of opening of the tender, within which period the tenderers can not withdraw their offer, subject to the period being extended further if required, by mutual agreement from time to time. Any intervention of the above condition will make the tenderer liable for forfeiture of his security deposit for due performance of the foregoing stipulation.
If it is not mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender. The tenderer whether sole proprietor / a company or a partnership firm / registered society / registered trust / HUF / LLP etc. if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/Contract up to the stage of signing the agreement except in the case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association / Board resolution, failing which tender shall be summarily rejected. A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he / they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him / them to deal with all other contractual activities subsequent to signing of agreement, if required. NOTE : A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed and Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if nt carries a conforming Apostille certificate.
Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected.
The quantities shown in above Schedule are approximate and are as a guide to give the tenderer(s) an idea of quantum of work involved. The Railway reserves the right to increase/decrease and/or delete or include any of the quantities given above and no extra rate will be allowed on this account.
ADEN Ranapratap nagar subdivision - Important Track works in Nathdwara-Mavli- Bari sadari section.
157-2025~NWR
157-2025
Open
Works - General
24 Months
Ajmer, Rajasthan
₹0
₹2.5 L
13 Feb 2026
19 Jan 2026
30 Jan 2026
55 items across 1 schedule · ₹2,08,61,664.7 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Using Soil Class SQ3 | cum | 10000.00 | 227.72 | 22,77,200 |
| 2 | Dewatering of natural or accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours. | HP Hour | 1000.00 | 44.73 | 44,730 |
| 3 | For Casual/Scattered Rail Renewal work | RM | 5000.00 | 38 | 1,90,000 |
| 4 | Lubrication of ERCs and its liner contact area by removal of ERCs and Metal / GFN liners in rail panel, cleaning of rust / scale of ERC, Metal / GFN liners & SGCI insert by using wire brush, scrapper / sand emery paper etc supply and application of graphite grease, as prescribed by Railway for under side of liners & corresponding area of rail foot & SGCI insert with ERCs and re-fixing the same as per procedure prescribed in latest edition of IRPWM with contractors grease and all other tools & plants complete and as directed. Note: Each ERC in this item shall constitute 1 ERC and its Liner Contact area. | ERC | 597600.00 | 5.16 | 30,83,616 |
| 5 | By using Railway's Grease graphite | Each | 9000.00 | 32.83 | 2,95,470 |
| 6 | By using Contractor's Grease Graphite | Each | 9000.00 | 38.35 | 3,45,150 |
| 7 | Renewal of seized Plate/Rail screws on PSC Sleepers by using gas or any approved methods, duly drilling holes in broken screw and removing existing screw pieces from the holes along with existing dowels and fixing new contractor's dowels (procured from RDSO approved sources) and grouting around dowel with Epoxy materials of approved specification and refixing new Railway's rail/Plate screws duly greasing the screw with specified grease with all contractor's materials, consumables, tools & plants, labour with all lead, lift. Note: 1.Seized screws shall be identified and marked by JE/P.Way and verified at minimum SSE/P.Way In charge) level. 2. Due care shall be taken to avoid any damage to the sleeper 3.A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each, if sleeper gets damaged in the process. | Each | 500.00 | 294.73 | 1,47,365 |
| 8 | Renewal of existing SEJ with improved SEJ with PSC sleepers under traffic block conditions as per approved drawing including fixing of special size bearing plate, rubber pad and other sleeper / rail fittings, greasing to the fittings, leading rails, sleepers & fittings to site, leading and stacking of released materials within a lead of 250m, cutting of Rails, drilling of holes, fixing of related fittings, providing temporary connection with fishplates till welding of SEJ is done and sleepers shall be given initial packing to make track fit for 20KMPH speed. Note: (1) Rail cutting and hole drilling shall be paid separately. (2) One set comprise complete SEJ on both rails at SEJ. | Set | 10.00 | 9,135.77 | 91,357.7 |
| 9 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM | 60000.00 | 28.14 | 16,88,400 |
| 10 | Under Traffic Block Conditions: | cum | 1000.00 | 56.2 | 56,200 |
| 11 | Under Conditions not requiring Traffic Block: | cum | 1000.00 | 42.64 | 42,640 |
| 12 | For 60Kg 90 UTS Rails | Each | 100.00 | 4,605.95 | 4,60,595 |
| 13 | For 52Kg 90 UTS Rails | Each | 100.00 | 4,711.92 | 4,71,192 |
| 14 | For 60Kg/60EI- R260 rails | Each | 100.00 | 4,844.39 | 4,84,439 |
| 15 | For 60 Kg - 90 UTS Rail | Each | 200.00 | 7,179.68 | 14,35,936 |
| 16 | For 60 Kg/60EI - R260 grade Rail | Each | 200.00 | 7,444.59 | 14,88,918 |
| 17 | For 52 Kg - 90/72 UTS Rail | Each | 200.00 | 7,297.42 | 14,59,484 |
| 18 | For PSC Sleeper | TRM | 5000.00 | 95.71 | 4,78,550 |
| 19 | Without Rail tensor | TRM | 51000.00 | 42.59 | 21,72,090 |
| 20 | Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. | Each | 20.00 | 1,929.81 | 38,596.2 |
| 21 | Removing weeds & bushes in ballast section and cess up to 3.95m from centre line of track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. | TRM | 5000.00 | 15.94 | 79,700 |
| 22 | Trimming of tree branches coming within 6m of centre line of track & those obstructing views of Curves/LCs / Signal / Indicator at locations in section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. Note: Girth of more than 20 cm will only be considered as tree branch. | Each | 200.00 | 182.95 | 36,590 |
| 23 | Kilometre & Gradient post | Each | 200.00 | 95.6 | 19,120 |
| 24 | Hectometre Post | Each | 250.00 | 109.04 | 27,260 |
| 25 | LWR / SEJ Board | Each | 25.00 | 168.98 | 4,224.5 |
| 26 | Level Crossing Boards including Road Sign Boards | Each | 100.00 | 191.61 | 19,161 |
| 27 | Level Crossing Post | Each | 30.00 | 189.57 | 5,687.1 |
| 28 | Curve Post | Each | 50.00 | 101.1 | 5,055 |
| 29 | Curve Board | Each | 100.00 | 168.98 | 16,898 |
| 30 | Curve details, SE, Versine, Station Nos. etc. per station. | Each | 200.00 | 57.02 | 11,404 |
| 31 | Level crossing with CC block surface | Sqm | 100.00 | 350.76 | 35,076 |
| 32 | Removing and refixing of guard Rails over slab bridges during machine packing with all contractor's men and materials duly removing fittings, leading guard rails to bridge approaches, lifting, dragging, positioning and crossing of track etc, and as directed by Engineer In charge. | TRM | 500.00 | 112.28 | 56,140 |
| 33 | 60 Kg - 110/90 UTS - Outside Track | Each | 200.00 | 219.76 | 43,952 |
| 34 | 52 Kg - 90 UTS - Outside Track | Each | 200.00 | 197.11 | 39,422 |
| 35 | 60 Kg - 110/90 UTS - On Running Line | Each | 200.00 | 280.99 | 56,198 |
| 36 | 52 Kg - 90 UTS- On Running Line | Each | 200.00 | 228.94 | 45,788 |
| 37 | Outside Track | Each | 400.00 | 50.01 | 20,004 |
| 38 | On Running Line | Each | 400.00 | 67.23 | 26,892 |
| 39 | Lead up to 5 Km | MT | 200.00 | 59.47 | 11,894 |
| 40 | Lead beyond 5 Km and up to 10 km | MT | 200.00 | 103.5 | 20,700 |
| 41 | Lead beyond 10 Km and up to 20 km | MT | 200.00 | 162.89 | 32,578 |
| 42 | Lead beyond 20 Km and up to 30 km | MT | 200.00 | 234.56 | 46,912 |
| 43 | Lead beyond 30 Km and up to 50 km | MT | 200.00 | 333.24 | 66,648 |
| 44 | Lead beyond 50 Km and up to 100 Km | MT | 100.00 | 546.3 | 54,630 |
| 45 | Fabrication including cutting, bending/machining and fixing of check rails of all rail sections over PSC Sleepers as per Railway's approved drawings & specifications for level crossings / trolley paths/inspection lines in yards duly cutting rail flanges, wherever required to correct alignment and level, drilling of holes with machine in check rails and fixing to Running rail and sleepers with all Railway's fittings, e.g. rail screws / grip expansion bolts, brackets, packing pieces, bolts, washers etc including grinding of brackets if required, fixing of Railway's wooden blocks at flare ends duly cutting and plaining, crossing of tracks and as directed by the engineer in-charge Note: 1. Drilling of holes in PSC Sleeper and fixing of dowels shall be paid under relevant item. 2. Required P.Way materials will be supplied at SSE/P.Way stores. | TRM | 100.00 | 1,044.74 | 1,04,474 |
| 46 | Clearing waterway of major & minor bridges by removing weeds / shrubs / bushes, removing silt deposit, filling scours, if any up to 10 metre from centre of bridge on either side including disposing waste and silt away from waterway. Note: Rate is for a single line and per metre of bridge span. | Metre | 1500.00 | 228.69 | 3,43,035 |
| 47 | Caution Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 20.00 | 6,988.14 | 1,39,762.8 |
| 48 | Speed Indicator Board of equilateral triangular shape having each side of 1000mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 20.00 | 6,008.27 | 1,20,165.4 |
| 49 | Termination Indicator Board of Circular shape having diameter of 1000mm with back support frame welded to vertical post of MS angle of size 50mmx50mmx6mm of 3950 mm long | Each | 20.00 | 8,543.06 | 1,70,861.2 |
| 50 | Manufacturing, supplying and fixing Curve Indicator / Point Indicator / SEJ Boards to be provided at various locations on formation, made out of MS sheet 2mm thick of size 450mm x 300mm duly fixed with MS frame of 25mm x 25mm x 3mm angle welded to 50mm x 50mm x 3mm MS angle, 1000mm long post split and bent 100mm at bottom end with all lead & lift as per specification and including painting of details with enamel paint, as directed by Engineer in-charge (Earthwork & concreting will be paid separately) | Each | 50.00 | 1,137.1 | 56,855 |
| 51 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 2000.00 | 864.02 | 17,28,040 |
| 52 | Tractor with Trolley for local transportation or other misc. works. | Hour | 1500.00 | 167.24 | 2,50,860 |
| 53 | Arranging labour as and when required by the Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge. | Day | 500.00 | 753.26 | 3,76,630 |
| 54 | Manufacture and supply of Precast Kilometer Posts of size 1.15 x 0.50 x 0.075 m in RCC 1:2:4 mix, engraving letters and leading to work spot, fixing in position with CC 1:3:6 concrete duly making pits of size as required, painting the post, writing the letters on both sides of the post with 2 coats of enamel paint of approved quality to the Railways drawings/IRPWM with contractor's materials, cement, steel, labour, tools, plant, with all lead and lifts etc., complete as per specifications and as directed by the Engineer-in-charge. Note: Excavation, Concrete and steel work will be paid under relevant items. | Each | 20.00 | 417.44 | 8,348.8 |
| 55 | Manufacture and supply of Precast gradient Posts of size 1.65 x 0.60 x 0.075 m in RCC 1:2:4 mix, engraving letters and leading to work spot, fixing in position with CC 1:3:6 concrete duly making pits of size as required, painting the post, writing the letters on both sides of posts in 2 coats with enamel paint of approved quality to the Railways drawings/IRPWM with contractor's materials, cement, steel, labour, tools, plant, with all lead and lifts etc., complete as per specifications and as directed by the Engineer-in-charge. Note: Excavation, Concrete and steel work will be paid under relevant items. | Each | 50.00 | 575.4 | 28,770 |
| Schedule total | ₹2,08,61,664.7 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderForm.pdf
ATTACHMENT
Spl.cond..pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .