Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Finance | -0.10% | ₹4.0 L | L1 | Admitted-Finance |
| 2 | L2₹4.1 LAdmitted-Finance | +2.00% | ₹4.1 L | L2 | Admitted-Finance |
Updated dates
Tender Value
₹4.0 L
EMD Value
₹8,080
Closing Date
12 May 2026, 4:00 pmClosed
Executive Engineer PWD (RnB) Division Doda
Executive Engineer PWD (RnB) Division Doda
As per NIT/SBD
2026_PWDJK_308451_2
e-NIT 03 of 2026-27
Open Tender
Civil Works
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059
₹8,080
Yes
20 May 2026
23 Apr 2026
13 May 2026
23 Apr 2026
12 May 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:1:3:6 or richer mix (i/c equivalent design mix). | - | cum | - | - | |
Providing and laying 5mm thick epoxy screeding consisting of araldite G.Y.257,100 parts by weight hardener HY 830,40 parts by weight Hardener HY 850,20parts weight plus quartz sand 900 parts over a primed surface with primer araldite GY 257,100 parts by weight and hardener HY 840,50 parts by weight including application of two top coats based on araldite GY 257,100 parts hardener HY 830,40 parts hardener Hy850,20parts and flow control agent 1 to 3% with acrosil DTO 75,3 parts complete as per ciba geigy specification. | - | sqm | - | - | |
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. Complete .50 mm thick with 20mm nominal size stone aggregate. | - | sqm | - | - | |
| 0.0 | Carriage of Meterial by Mechanical Transport including loading and unloading and stacking complete job at site. | - | - | - | - |
| 0.9 | Carriage of Sand at an average lead of 22.00kms by MT | - | cum | - | - |
| 0.0 | Carriage of Bajree at an average lead of 10.00kms by MT. | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_999580.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid