| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | L2₹20.8 L+₹26,940 (1.32%)Rejected-Finance R O BRAGTA BHAWAN CHOTTA SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹21.1 L+₹56,844 (2.78%)Rejected-Finance NOT AVAILABLE | FARIDABAD | HARYANA | 121004 | L3 | Rejected-Finance 3rd Lowest | |
| 4 | L4₹23.1 L+₹2.6 L (12.6%)Rejected-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | L4 | Rejected-Finance 4th Lowest |
Tender Value
Refer Docs
EMD Value
₹53,500
Closing Date
6 Apr 2022, 4:00 pmClosed
Executive Engineer Division No-IHPPWD Shimla-3
Executive Engineer Division No-IHPPWD Shimla-3
Shifting of existing boundary wall and Reconstruction of bouudary wall on road from Chotta Shimla to Kasumpti (near Tibetan Schoo ) in Shimla (Under Smart city
2022_PWD_58930_2
SD-I-CTR-Tender-31150-80 dt 25-03-2022
Open Tender
Civil Works
Item Rate
90 days
Shimla
AS per SBD
14 documents required · 14 mandatory
₹1,500
₹53,500
8 May 2024
31 Mar 2022
7 Apr 2022
31 Mar 2022
6 Apr 2022
31 Mar 2022
Amount
Demolition of stone masonry above G.L. upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials within all leads including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(a)Rubble masonry in cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m (One point five metre) in width or 10 sqm (ten Square Metre)on plan) in all kinds of soil. including dressing of sides and ramming of bottoms including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited) all earth work in cutting/ excavation including rock excavation shall be carried out true to lines grades, side slopes, width , camber super elevation and level as shown on the drawings or as directed by the Engineer-in-charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified dimension or as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost).Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be dully compensated by him at his on cost in all cases. including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge.
Disposal of excavated surplus earth by mechanical transport on approved dumping site surrounding Shimla through all mode of transportation including head load animal load or mechanical means alongwith its leveling and top complete the work including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. ( a) Cement Mortar 1:6:12(one cement:six sand:twelve graded stone agg.40mm (forty milimetre) nominal size).
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702,704,1202 and 1204 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) Randam rubble masonry in cement mortar 1:6(One cement: Six sand).
Dismentling steel work in all types of sections upto a height of 5m above plinth level excluding cutting of rivet as technical specification clause 202 excluding distempering including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Steel work welded in built up sections, trusses and framed work, including cutting hoisting fixing in position and applying a priming coat of red lead paint including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a)In gratings, framed guard bars, ladders, railing, brackets and similar works.
15mm Cement plaster in single coat on the rough side of brick/ concrete/stone walls for interior plastering upto floor two level including arrises,internal rounded angles,chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. ( i)Cement Mortar 1:4 (One Cement:Four Sand).
Kapil Chand
Vinay Kumar
vikas sharma
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .