Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.3 LAdmitted-Finance | -0.90% | ₹36.3 L | L1 | Admitted-Finance |
| 2 | L2₹36.4 L+₹12,810.56 (0.35%)Admitted-Finance | -0.55% | ₹36.4 L+₹12,810.56 (0.35%) | L2 | Admitted-Finance |
| 3 | L3₹36.6 L+₹31,111.36 (0.86%)Admitted-Finance | -0.05% | ₹36.6 L+₹31,111.36 (0.86%) | L3 | Admitted-Finance |
Tender Value
₹36.6 L
EMD Value
₹3.7 L
Closing Date
18 Mar 2026, 4:00 pmClosed
EO Charkhari
NPP Charkhari
Ward Rayanpur me Prathvipal ki aara machine se Deendayal ke makan tk RCC Nala Nirmad
2026_DOLBU_1119895_2
912/nppc/2025-26Dt-21.02.2026
Open Tender
Civil Works
Percentage
90 days
NPP Charkhari
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,700
Yes
EO
₹3.7 L
Yes
24 Mar 2026
25 Feb 2026
19 Mar 2026
25 Feb 2026
18 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dewatering with pump including fuel etc complete in duration of working time. | - | job | 5,000 | - |
| 2 | Earth work in excavation for structures as per drawing and technical specification clause 305.1 i/c setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50m dressing of sides and bottom and back filling in trenches with excavated suitable material. | 0.6 | cum | 404.6 | ₹242.36 |
| 3 | Providing& Laying, spreading and compacting of well graded materials moorum in blanket coat (granular surface coat) compacted thickness on a prepared base & compacting with power roller including all materials, machinary, labour &T&P etc. (Analysis as per specification 402 Mord) | - | cum | 1,725.1 | - |
| 4 | Providing concrete 1:3:6 M10 grade plain concrete in open foundations complete. including supply of all material, labour and T&P etc | 1 | cum | 5,387.3 | ₹5,381.91 |
| 5 | RCC work with cement approved coarse sand and 2cm.(3/4'') gauge approved stone ballast in the proporation 1:2:4 including all material labour and T&P etc. | 1 | cum | 6,395.2 | ₹6,388.8 |
| 6 | Supplying, fittind and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawing and technical specification clause 1002,1005,1010 & 1202. | 0.4 | Qtl | 7,231.3 | ₹2,892.52 |
| 7 | Add 18 % GST | - | NO | 5,58,329 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_2082976.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .