| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.8 LAccepted-AOC | ₹25.8 L | L1 | Accepted-AOC AGG WITH L1 |
| 2 | L2₹26.8 LRejected-AOC | ₹26.8 L | L2 | Rejected-AOC AGG WITH L1 |
| 3 | L3₹28.8 LRejected-AOC | ₹28.8 L | L3 | Rejected-AOC AGG WITH L1 |
| Sl No | Description | Qty | Unit | M/S PUSHPENDER KUMAR SHARMA L1 | Mukut Bihari Lal Contractor L2 | M/S MOHD. IDRIS CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches labour ,T&P etc.complete | 618.08 | Cum | 50 ₹30,904 | 80 ₹49,446.40 | 99 ₹61,189.92 |
| 2.00 | Laying C.C. in (1:4:8) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete. | 162.65 | Cum | 4,000 ₹6.5 L | 4,300 ₹7.0 L | 4,300 ₹7.0 L |
| 3.00 | Brickwork(M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete. | 150.97 | Cum | 5,300 ₹8.0 L | 5,000 ₹7.5 L | 5,400 ₹8.2 L |
| 4.00 | Supplying & Laying ordinary sand including cost of all material, labour & T&P etc. required for proper complition. | 211.85 | Cum | 70 ₹14,829.50 | 150 ₹31,777.50 | 200 ₹42,370 |
| 5.00 | Providing 12.5 MM thick cement plaster in 1:4 cement mortar with coarse sand including proper curing all material ,labour T&P etc. Complete in all respect | 2,118.47 | Sqm | 50 ₹1.1 L | 60 ₹1.3 L | 100 ₹2.1 L |
| 6.00 | Supplying & Laying 200 Micron Thick LDPE Film i/c cost of all Labour , material ,T&P etc . Required for proper completion of work. | 1,966.25 | Sqm | 25 ₹49,156.25 | 60 ₹1.2 L | 50 ₹98,312.50 |
| 7.00 | Providing , supplying, fixing & Removing of Centering & shutering work for C.C. Work i/c cost of all labour material , T&P etc complete of work | 97.5 | Sqm | 400 ₹39,000 | 500 ₹48,750 | 500 ₹48,750 |
| 8.00 | Laying 75 mm thick lining in M-15(1:2:4) including cost of all material labour & T&P etc.required for proper complition of work . | 147.47 | Cum | 5,700 ₹8.4 L | 5,400 ₹8.0 L | 5,500 ₹8.1 L |
| 9.00 | Supplying/Fixing 10 mm thick thermocol sheet in expention joints i/c cost of all Labour , material T&P etc. required for proper completion of work. | 50.37 | Sqm | 40 ₹2,014.80 | 50 ₹2,518.50 | 90 ₹4,533.30 |
| 10.00 | Supplying/Fixing 10mm wide expention joints with bituminious fillar after removel of thermocol sheet i/c cost of all Labour , material T&P etc.required for proper completion of work. | 50.37 | Sqm | 44 ₹2,216.28 | 40 ₹2,014.80 | 300 ₹15,111 |
Tender Value
₹33.9 L
EMD Value
₹67,760
Closing Date
27 Jan 2025, 12:00 pmClosed
EX ENGG MDGC MUZAFFARNAGAR
EX ENGG MDGC MUZAFFARNAGAR
Providing CC lining on slopes and bed of RightMain Dy Between km 16.600 to Km 16.925
2025_UPIDC_996243_2
TENDER NOTCE NO 16/EE/2024-25
Open Tender
Civil Works
30 days
AS PER TENDER NOTICE
as per tender notice
2 documents required · 2 mandatory
₹854
₹67,760
20 Jan 2026
22 Jan 2025
27 Jan 2025
22 Jan 2025
27 Jan 2025
22 Jan 2025
Amount
Earthwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches labour ,T&P etc.complete
Laying C.C. in (1:4:8) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete.
Brickwork(M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete.
Supplying & Laying ordinary sand including cost of all material, labour & T&P etc. required for proper complition.
Providing 12.5 MM thick cement plaster in 1:4 cement mortar with coarse sand including proper curing all material ,labour T&P etc. Complete in all respect
Supplying & Laying 200 Micron Thick LDPE Film i/c cost of all Labour , material ,T&P etc . Required for proper completion of work.
Providing , supplying, fixing & Removing of Centering & shutering work for C.C. Work i/c cost of all labour material , T&P etc complete of work
Laying 75 mm thick lining in M-15(1:2:4) including cost of all material labour & T&P etc.required for proper complition of work .
Supplying/Fixing 10 mm thick thermocol sheet in expention joints i/c cost of all Labour , material T&P etc. required for proper completion of work.
Supplying/Fixing 10mm wide expention joints with bituminious fillar after removel of thermocol sheet i/c cost of all Labour , material T&P etc.required for proper completion of work.
Earthwork in back filling including lead upto 200 m and lift upto 1.50m also i/c lavelling, ramming,dressing labour ,T&P etc.complete
Mukut Bihari Lal Contractor (BID ID -4884326)
M/S MOHD. IDRIS CONTRACTOR (BID ID -4885449)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid