Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | ₹4.5 L | L1 | Accepted-AOC AS PER NIT. |
| 2 | L2₹4.5 LRejected-Finance | ₹4.5 L | L2 | Rejected-Finance Being L2 |
| 3 | L3₹4.8 LRejected-Finance SHANTI NAGAR BISHRAMPUR DISTT SURAJPUR C G | ₹4.8 L | L3 | Rejected-Finance Being L3 |
| 4 | L4₹5.3 LRejected-Finance | ₹5.3 L | L4 | Rejected-Finance Being L4 |
| 5 | L5₹8.1 LRejected-Finance C O SHRI SUKHDEV SINGH VILL PIRAULI PO PIRAULI KISHANPUR DISTT MUZAFFARNAGAR | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | ₹8.1 L | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | Gurucharan Singh L5 | Rakesh Bahadur Singh L3 | Ram Awadh Singh L1 | RAM MANOHAR JAISWAL L2 | abnish kumar rai L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | White washing(excluding materials) of Belt roadway, Haulage roadway & Travelling roadway single coat in U/G galleries. | 76,798 | Sq. mtr. | 7.89 ₹6.1 L | 4.45 ₹3.4 L | 4.5 ₹3.5 L | 4.4 ₹3.4 L | 4.5 ₹3.5 L |
| 2.00 | Loading the material in to tubs. | 23 | cum | 219.27 ₹5,043.21 | 185 ₹4,255 | 122 ₹2,806 | 122 ₹2,806 | 300 ₹6,900 |
| 3.00 | Unloading of material at distination in UG. | 23 | cum | 146.18 ₹3,362.14 | 99 ₹2,277 | 81 ₹1,863 | 81 ₹1,863 | 200 ₹4,600 |
| 4.00 | Lime | 23,039.4 | Kg | 3.01 ₹69,348.59 | 2.46 ₹56,676.92 | 1.3 ₹29,951.22 | 1.68 ₹38,706.19 | 4 ₹92,157.60 |
| 1000000.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - | - |
Tender Value
₹11.7 L
EMD Value
₹14,700
Closing Date
22 Dec 2025, 5:00 pmClosed
GENERAL MANAGER Oprn.
GM OFFICE BISHRAMPUR AREA.
White washing single coat along Main Line district belt , Haulage and Traveling roadways and belt, haulage and traveling roads of 48D/ Main Dip district , main line and cross galleries of above at Rehar U/G Mine, Bishrampur Area.
2025_SECL_349137_1
GM/BSPR/GMO/Srvy/e-tender/ 2025-26/13 dt.09.12.25
Open Tender
Civil Works - Others
90 days
REHAR UG MINE BISHRAMPUR AREA
AS PER NIT.
4 documents required · 4 mandatory
₹14,700
25 Feb 2026
10 Dec 2025
23 Dec 2025
10 Dec 2025
22 Dec 2025
11 Dec 2025
10 Dec 2025 - 15 Dec 2025
Amount
White washing(excluding materials) of Belt roadway, Haulage roadway & Travelling roadway single coat in U/G galleries.
Loading the material in to tubs.
Unloading of material at distination in UG.
Total impact of GST for the purpose of CTC
RAM MANOHAR JAISWAL (BID ID -1206276)
Rakesh Bahadur Singh (BID ID -1206113)
abnish kumar rai (BID ID -1204734)
Gurucharan Singh (BID ID -1205074)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.12 MB
Tendernotice_2.pdf
PDF • 0.30 MB
BOQ_361863.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid