| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹92.4 CrAccepted-AOC 4B TOWN SQUARE CHINAR PARK RAJARHAT KOLKATA 700 136 | ₹92.4 Cr | 1 | Accepted-AOC Emerged as successful bidder |
| 2 | 2₹98.2 CrRejected-Finance 14 BILASIPARA P O P S BILASIPARA DIST DHUBRI ASSAM PIN 783348 | DHUBRI | ASSAM | 783348 | ₹98.2 Cr | 2 | Rejected-Finance Not emerging most advantageous bidder |
| 3 | Rejected-Technical R K PATH ITACHALI HOUSE NO 22 CITY TOWN NAGAON P O NAGAON P S SADAR DISTRICT NAGAON PIN 782003 | NAGAON | ASSAM | 782003 | - | - | Rejected-Technical Technicallly not qualified |
Tender Value
Refer Docs
EMD Value
₹1.8 Cr
Closing Date
26 Oct 2023, 1:00 pmClosed
Project Director AHIDMS
Project Director AHIDMS
Construction of 100 Bedded New District Hospital in Narayanpur, Lakhimpur, Assam , under World Bank Financed Assam State Secondary Healthcare Initiative for Service Delivery Transformation (ASSIST) Project.
2023_MDRDE_32574_1
IN-AHIDMS-368377-CW-RFB
Open Tender
Civil Works - Building
1825 days
Narayanpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹25,000
Yes
₹1.8 Cr
Yes
Sixmile, Guwahati
11 Mar 2024
19 Sept 2023
26 Oct 2023
19 Sept 2023
26 Oct 2023
19 Oct 2023
19 Sept 2023 - 16 Oct 2023
3 Oct 2023
Amount
Salvage
Credit for Demolition of building structures etc. complete and taking away all fetched material out of campus within 30 days after completing demolition part except the C&D waste kept for recycling and used the recycle product for non structural work such as in foot path, manhole, lean concrete, filling under plinth, re-filling of foundation etc. or as approved by Engineer-in-charge complete in all respect. The serviceable material received from dismantling/demolishing to be kept with executing agency and take away from the site as per direction of engineer-in-charge. Note : This amount to be paid by agency to the department. Quote the lump sum amount (in minus)
Civil Works
Planning, Designing, and Construction on EPC Basis RCC framed structure building MAIN DISTRICT HOSPITAL (G+4) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , IPHS norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building BMW & LAUNDRY BLOCK (G) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , IPHS norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building MORTUARY & GAS MANIFOLD (G) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , IPHS norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and construction of Civil External development works Levelling, Cement concrete pavement with vaccum dewatered concrete, Foothpath and pathway, External Sewerage, Filtered Water Supply, Distribution line, Peripheral grid 150 mm to 300 mm dia pipes, Unfiltered water supply distribution lines, Storm water drain, Rain Water Harvesting, Trenches for Services, Under ground Sump, Horticulture & Landscape, Earth Cutting/Filling Work, Boundary Wall, Campus Signage, Main Gate & Guard Room, Solar water heating system, Hyderopneumatic water supply system, Sewerage+effluent treatment plant , Water cooler, Tubewell, Sewage & drainage pump , Heat Pump for Water supply system , Electromechanical of WTP & RO System and ESS & Plant Room approval of the same by the Engineer- in-Charge
Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub station ,DG set , UPS System, solar photo voltaic power generation system, IP based CCTV system, LAN System, IP based EPABX System, Audio Visual/Conference System, Street lighting with LED and Emergency Light and Illuminated digital signages with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of HVAC with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of Medical Gas Pipeline System & Liquid Medical Oxygen Tank with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of Modular Operation Theater With stainless steel technology and Integration with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of Nursing call system with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of Hospital curtain track system & I.V. tree system with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of Solid waste management with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Designing, planning, Supplying, Installation and commissioning of Non Medical& Modular Lab Furniture as per List of makes, specifications etc. as per scope of work and directions of Engineer In charge
Operation and Maintenance of Services Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years comprehensive warranty for followings services which will run concurrently with DLP of 12 Months. (i). MGPS & LMO Tank (The Lump Sum as Quoted will split as per weightage as given below) a) For 1st year (Concurrently with DLP of 12 Months) 5% of quoted amount under O&M (MGPS & LMO Tank) b) For 2nd year (After One Year Of DLP) 10% of quoted amount under O&M (MGPS & LMO Tank) c) For 3rd year (After Two Year Of DLP) 15%of quoted amount under O&M (MGPS & LMO Tank) d) For 4th year (After Three Year Of DLP) 30% of quoted amount under O&M (MGPS & LMO Tank) e) For 5th year (After Four Year Of DLP) 40% of quoted amount under O&M (MGPS & LMO Tank)
Operation and Maintenance of Services Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years comprehensive warranty for followings services which will run concurrently with DLP of 12 Months. (i). MOT (The Lump Sum as Quoted will split as per weightage as given below) a) For 1st year (Concurrently with DLP of 12 Months) 5% of quoted amount under O&M (MOT) b) For 2nd year (After One Year Of DLP) 10% of quoted amount under O&M (MOT) c) For 3rd year (After Two Year Of DLP) 15% of quoted amount under O&M (MOT) d) For 4th year (After Three Year Of DLP) 30% of quoted amount under O&M (MOT) e) For 5th year (After Four Year Of DLP) 40% of quoted amount under O&M (MOT)
Operation and Maintenance of Services Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years comprehensive warranty for followings services which will run concurrently with DLP of 12 Months. (i). Nurse Call System (The Lump Sum as Quoted will split as per weightage as given below) a) For 1st year (Concurrently with DLP of 12 Months) 5% of quoted amount under O&M (Nurse Call System) b) For 2nd year (After One Year Of DLP) 10% of quoted amount under O&M (Nurse Call System) c) For 3rd year (After Two Year Of DLP) 15% of quoted amount under O&M (Nurse Call System) d) For 4th year (After Three Year Of DLP) 30% of quoted amount under O&M (Nurse Call System) e) For 5th year (After Four Year Of DLP) 40% of quoted amount under O&M (Nurse Call System)
Operation and Maintenance of Services STP, WTP, ETP, FIRE PUMP: Operation & comprehensive maintenance STP, WTP, ETP , FIRE PUMP units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles, replacement of parts, (except fuel, powerand water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. (The Lump Sum as Quoted will split as per weightage as given below) a) For 1st year (Concurrently with DLP of 12 Months) 5% of quoted amount under O&M (STP, WTP, ETP, FIRE PUMP`) b) For 2nd year (After One Year Of DLP) 10% of quoted amount under O&M (STP, WTP, ETP, FIRE PUMP`) c) For 3rd year (After Two Year Of DLP) 15% of quoted amount under O&M (STP, WTP, ETP, FIRE PUMP`) d) For 4th year (After Three Year Of DLP) 30% of quoted amount under O&M (STP, WTP, ETP, FIRE PUMP`) e) For 5th year (After Four Year Of DLP) 40% of quoted amount under O&M (STP, WTP, ETP, FIRE PUMP`)
Operation and Maintenance of Services Lifts:Operation & comprehensive maintenance LIFT units after three-year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumables, manpower, tools and tackles, replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. (The Lump Sum as Quoted will split as per weightage as given below) a) For 1st year (Concurrently with DLP of 12 Months) 5% of quoted amount under O&M (Lifts) b) For 2nd year (After One Year Of DLP) 10% of quoted amount under O&M (Lifts) c) For 3rd year (After Two Year Of DLP) 15% of quoted amount under O&M (Lifts) d) For 4th year (After Three Year Of DLP) 30% of quoted amount under O&M (Lifts) e) For 5th year (After Four Year Of DLP) 40% of quoted amount under O&M (Lifts)
Operation and Maintenance of Services ESS, DG SETS, TRANSFORMER: Operation & comprehensive maintenance ESS, DG SETS units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles, replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. (The Lump Sum as Quoted will split as per weightage as given below) a) For 1st year (Concurrently with DLP of 12 Months) 5% of quoted amount under O&M (ESS, DG SETS, TRANSFORMER) b) For 2nd year (After One Year Of DLP) 10% of quoted amount under O&M (ESS, DG SETS, TRANSFORMER) c) For 3rd year (After Two Year Of DLP) 15% of quoted amount under O&M (ESS, DG SETS, TRANSFORMER) d) For 4th year (After Three Year Of DLP) 30% of quoted amount under O&M (ESS, DG SETS, TRANSFORMER) e) For 5th year (After Four Year Of DLP) 40% of quoted amount under O&M (ESS, DG SETS, TRANSFORMER)
Operation and Maintenance of Services HVAC: Operation & maintenance (routine &preventive ) and breakdown maintenance of high side & low side of the HVAC System comprising of all the machinery, equipment installed etc complete in all respect as per direction of Engineer in charge. (The Lump Sum as Quoted will split as per weightage as given below) a) For 1st year (Concurrently with DLP of 12 Months) 5% of quoted amount under O&M (HVAC) b) For 2nd year (After One Year Of DLP) 10% of quoted amount under O&M (HVAC) c) For 3rd year (After Two Year Of DLP) 15% of quoted amount under O&M (HVAC) d) For 4th year (After Three Year Of DLP) 30% of quoted amount under O&M (HVAC) e) For 5th year (After Four Year Of DLP) 40% of quoted amount under O&M (HVAC)
SHREE GAUTAM CONSTRUCTION CO. LTD.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.