Tender Value
Refer Docs
EMD Value
₹15,254
Closing Date
5 Mar 2026, 5:30 pmClosed
Executive Officer
Dhenkanal Municipality
AS PER DTCN
2026_ORULB_126398_12
DKL MPLTY/10 /2025-26
Open Tender
Civil Works - Others
Percentage
90 days
Dhenkanal
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹15,254
Yes
16 Oct 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
5 Mar 2026
23 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in all kind of soil up to the required depth including dressing and leveling the bed and depositing the excavated materials away from the site with all leads and lifts, T & P labour required for the work etc. complete as directed by the Engineer-in-charge. | 40.77 | Cum | 255.38 | ₹10,411.84 |
| 2 | watering and ramming, including cost, conveyance, royalties and taxes of all materials and cost of all labour with T & P required for the work etc. complete as per direction of Engineer-in-charge. | 14.85 | Cum | 1,126.86 | ₹16,733.87 |
| 3 | P.C.C (1:3:6) using 4cm. Size BHGCB metal including the cost of all merials, labour carriage, royalty etc. completehoisting lowering laying compacting concrete in layers not exceeding 0.15M. In depth watering and currying etc complete including cost, conveyance, royalties & taxes of all materials and labour etc. complete as per specification & direction of Engineer-in-charge. | 6.37 | Cum | 6,193.03 | ₹39,449.6 |
| 4 | C.C (1:2:4) using 12mm.size BHGCB chips including all cost complete | 3.38 | Cum | 7,810.18 | ₹26,398.41 |
| 5RCC (M20) using 12mm size BHGCB chips including rigid and smooth centering and shuttering for RCC work complete. | |||||
| 5.01 | Column Base | 8.63 | Cum | 6,440 | ₹55,577.2 |
| 5.02 | Column Base | 0.95 | Cum | 16,074.47 | ₹15,270.75 |
| 5.03 | Plinth Band | 0.55 | Cum | 7,310.34 | ₹4,020.69 |
| 5.04 | Lintel | 0.09 | Cum | 14,217.22 | ₹1,279.55 |
| 6 | M.S.reinforcement in cutting,straitening,bending,binding & tying the grills and placing in position etc.complete incl.cost | 2.43 | Qntl | 10,349.5 | ₹25,149.29 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 1.43 MB
BOQ_582338.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .