| 1 | L1₹24.0 LAccepted-AOC SHRI MUKTSAR SAHIB | ₹24.0 L | L1 | Accepted-AOC L1 |
Tender Value
₹25.0 L
EMD Value
₹50,092
Closing Date
22 May 2026, 9:00 amClosed
DSCO Gurdaspur
DSCO Gurdaspur Room no 402 Third Floor Block B District Administration Complex gurdaspur
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 450 mm Dia RCC Pipes
2026_DOA_167417_2
DSWC/GUR/2025-2026/07
Open Tender
Civil Works
180 days
Village Bhikhri harni Dalluana Kahnuwan
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Yes
₹50,092
Yes
5 Jun 2026
14 May 2026
22 May 2026
14 May 2026
22 May 2026
14 May 2026
CSR 29.70 CSR29.71
Pipe Dia Excavation Lowering TC Jointing Cutting Cutting AVP Fixing AAV Fixing AVP
435 0.4 1.2 mat lab
with 850 bajri & 850 sand
Cement sand bajri lab Total
198.13 Cement sand bajri lab Total
calculation for 800 mm cement 245,sand 1200,bajri 1400
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village DASKA (C/o 11180/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1344 /m3 53 71232
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 700 /Mtrs 54.46 38122
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 280 /Joints 221.52702886247877 62027.56808149406
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 6 /Cut hole 47.25 283.5
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 13.049999999999999 26.099999999999998
Fixing of Risers & Alfa valves with C.C 1:2:4 6 /Riser & Valve 733.9434069043576 4403.660441426146
Fixing of Air vent Pipes with C.C 1:2:4 2 /Air pipe 226.3786078098472 452.7572156196944
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 2 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 59800
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 283 Per joint 24 Rupees Twenty Four Only 6792
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 26424 Rupees Twenty Six Thousand Four Hundred Twenty Four Only 26424
Grand Total 269563.5857385399
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village KALBANJARA (C/o 69500/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1840 /m3 53 97520
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 920 /Mtrs 54.46 50103.200000000004
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 368 /Joints 221.52702886247877 81521.94662139218
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 8 /Cut hole 47.25 378
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 13.049999999999999 52.199999999999996
Fixing of Risers & Alfa valves with C.C 1:2:4 8 /Riser & Valve 733.9434069043576 5871.547255234861
Fixing of Air vent Pipes with C.C 1:2:4 4 /Air pipe 226.3786078098472 905.5144312393888
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 5 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 149500
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 368 Per joint 24 Rupees Twenty Four Only 8832
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 34733 Rupees Thirty Four Thousand Seven Hundred Thirty Three Only 34733
Grand Total 429417.4083078664
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
FINANCIAL BID E-Tender No. – DSWC/GUR/2025-2026/07
All Construction Material as Per PWD Specifications & All Material as Per ISI Standred With The Pre Approval of Departmental Officials
• Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 450 mm Dia RCC Pipes, providing and fixing of AVP, construction of haudie, Mogha no. 38120/R Village BhiKhariharni-Dalluana, Tehsil Kahnuwan, Distt. Gurdaspur.
Name and Address of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs 2504560
Quoted by Contractor (As % less of Estimated Amount) Less (-/+%) 0
WORK-1 :-Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 450 mm Dia RCC Pipes, providing and fixing of AVP, construction of haudie, Mogha no. 38120/R Village BhiKhariharni-Dalluana, Tehsil Kahnuwan, Distt. Gurdaspur.
Estimate Sanction No. 16140/D.B. Dated 01.10.2025, Amount 96,21,300/-
Abstract of Cost
Sr. No. Particulars Amount
1 Cost of Labour 2046522
2 Cost of Material 328566
3 Cost of Labour and Material (04 Houdi) 125476
4 Sign Board 4000
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 11004.35 /m3 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 6835 /Mtrs 71 Rupees Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 ½ Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 2730 /Joints 132 Rupees One Hundred Thiry Two Only
Pipe line Hole 450 mm 46 /number 116 One Hundred Sixteen Only
Pipe line Hole 150 mm 30 /number 41 Forty One Only
450 mm Providing Risers 46 Riser & Valve 125 One Hundred Twenty Five Only
450 mm Fixing of Alfa Alfa Valve 46 /number 94 Ninety Four Only
450 mm Applying End Closer 8 /number 132 Rupees One Hundred Thiry Two Only
150 mm Fixing of Air vent Pipes 30 /Air pipe 73 Seventy Three Only
450 mm slating Pipe 0 /number 132 Rupees One Hundred Thiry Two Only
1000 mm Fixing of Pump Stand 1 /number 1040 One Thousand and Forty Only
Pipe line 450 mm LT Joints 18 /Joints 116 One Hundred Sixteen Only
Transportation of Pipes 821.58 /Tone 160.3006 Rupees One Hundred Sixty and Thity Paisa Only
Applying Gate Valve 450 mm 10 /number 1626.39 One Thousand Six Hundred Twenty Six and Thiry Nine Paisa Only
Cost of Other Material
Cement 745 /bag 299.99 Rupees Two Hundred Ninety Nine Paisa Ninety Nine Only
Sand 2210 /Cum Foot 32 Rupees Thirty Two only
Bajri 261 /Cum Foot 24 Rupees Twenty Four Only
Nimar 209 / Kg 134.4 Rupees One Hundred Thirty Four Paisa Four Only
Amount of soil excavation and filling
Sr. no. Description Length (In Meters) Breath (In Meters) Depth (In Meters) Quantity (Cube Meter)
1 450 mm. Trench digging and filling for pipe 6835 1.15 1.4
Sr.no. Description Quantity Rate Units Amount
1 Excavation of soil, filling in voids and laying surplus soil 11004.35 93.78 Per Cube Meters
Cost of Material for One Houdi
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Cement 12 /bag 299.99 Rupees Two Hundred Ninety Nine Paisa Ninety Nine Only
Sand 66 /Cum Foot 32 Rupees Thirty Two only
Bajri 11 /Cum Foot 24 Rupees Twenty Four Only
Bricks 1977 / Thousand 7000 Rupees Seven Thousand Only
Bar (Steel) 14.7 /Kg 62.84 Rupees Sixty Twoe and Eighty Four Paisa Only
Brick Bread 0 /Joint 39.6 Rupees Thiry Nine Paisa Six Only
Cost of Labour for One Houdi
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earthwork in excavation 8 cum 93.78 Rupee Ninety Three and Seventy Eight Paisa
Laying of stone aggregate in foundation 0.6 /Cum 1269.4675 One Thosand Two hundred Sixy nine and Forty Seven paisa 761.68
Cement Concrete 0.14 /Cum 1269.4675 One Thosand Two hundred Sixy nine and Forty Seven paisa 177.73
Bricks Work 4.75 /Cum 1397.99 One Thosand Three hundred Ninety nine and Forty Seven paisa 6640.47
Cement Plaster 15.32 /Cum 132.741 - 2033.59
Total Cost of Houdi
Sr. No. Cost of One Houdi No. of Houdi Amount
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
DNIT.pdf
Tender Documents • 1.20 MB
222.xls
Tender Documents • 0.09 MB
Download all tender documents and submit your bid