Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | -21.11% | ₹2.3 L | L1 | Admitted-Finance |
| 2 | L1₹2.3 LAdmitted-Finance | -21.11% | ₹2.3 L | L1 | Admitted-Finance |
| 3 | L2₹2.5 LAdmitted-Finance | -15.01% | ₹2.5 L | L2 | Admitted-Finance |
| 4 | L3₹2.5 LAdmitted-Finance | -14.30% | ₹2.5 L | L3 | Admitted-Finance |
| 5 | L4₹2.7 LAdmitted-Finance | -10.00% | ₹2.7 L | L4 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹5,940
Closing Date
30 Mar 2026, 1:00 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_306658_13
e-NIT 277 of REW Poonch 2025-26 Date 24-03-2026
Open Tender
Civil Works
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹5,940
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | |||||
| 2Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 3Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | |||||
| 4Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead With cement mortar 1:4 (1 cement : 4 fine sand) | |||||
| 5Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | |||||
| 6Carriage of sand by 12 KM by MT & 100 m by HL | |||||
| 7Add the Cost of CIB | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_995663.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid