| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-AOC NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | ₹5.2 Cr Quoted ₹6.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.9 CrRejected-Finance | ₹6.9 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹7.1 CrRejected-Finance | ₹7.1 Cr | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | V.JOTHIKUMARAVEL L2 | M.JAYAVEL L3 | PERUMAL.S.K L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing juliflora jungle with uprooting including all cost of labour ,lead, lift etc., complete. | 3,375 | M2 | 10 ₹33,750 | 12 ₹40,500 | 12 ₹40,500 |
| 2.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B | 2,924 | M3 | 200 ₹5.8 L | 150 ₹4.4 L | 100 ₹2.9 L |
| 3.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Soft disintegrated rock not requirng blasting | 172 | M3 | 10 ₹1,720 | 200 ₹34,400 | 150 ₹25,800 |
| 4.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Medium rock and dense medium rock not requiring blasting | 172 | M3 | 10 ₹1,720 | 350 ₹60,200 | 100 ₹17,200 |
| 5.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Removal of hard rock by wedging and chiselling and trimming to proper shape | 172 | M3 | 10 ₹1,720 | 1,200 ₹2.1 L | 100 ₹17,200 |
| 6.00 | Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 160.5 | M3 | 1,500 ₹2.4 L | 1,850 ₹3.0 L | 920 ₹1.5 L |
| 7.00 | Transporting the surplus excavated earth, debris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance , loading, unloading etc. complete | 1,373 | M3 | 10 ₹13,730 | 125 ₹1.7 L | 100 ₹1.4 L |
| 8.00 | Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 2,607 | M3 | 10 ₹26,070 | 100 ₹2.6 L | 50 ₹1.3 L |
| 9.00 | Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete. | 240.5 | M3 | 7,600 ₹18.3 L | 7,500 ₹18.0 L | 4,500 ₹10.8 L |
| 10.00 | R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 361 | M3 | 9,000 ₹32.5 L | 8,900 ₹32.1 L | 7,000 ₹25.3 L |
Tender Value
₹6.0 Cr
EMD Value
₹4.8 L
Closing Date
8 Jul 2025, 2:00 pmClosed
CE/TP-I/CNI
Guindy 230kV GIS SS campus , Chennai - 32
Plinth works at Nemmeli for CMWSSB under DCW Bay II
2025_EB_574507_1
TP1-26/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works - Others
120 days
Nemmeli
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.8 L
5 Jan 2026
26 Jun 2025
9 Jul 2025
26 Jun 2025
8 Jul 2025
26 Jun 2025
Amount
Clearing juliflora jungle with uprooting including all cost of labour ,lead, lift etc., complete.
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Soft disintegrated rock not requirng blasting
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Medium rock and dense medium rock not requiring blasting
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Removal of hard rock by wedging and chiselling and trimming to proper shape
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Transporting the surplus excavated earth, debris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance , loading, unloading etc. complete
Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete.
R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
P:C:C 1:2:4 using 12 to 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete including form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification.
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with a minimum cement content of 360 kg per M3 for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (up to basement level)- RCC wall
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete.
Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos.washer in High Tensile Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Providing Grout holes for equipment structures including cost of all materials, form work , labour, lead, lift etc. complete.
Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Plastering with cm 1:5 mix using 20mm thick for inside & outside walls including cost of all materials, labour, lead, lift etc complete
Supplying and fixing GM wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete 32mm
Supplying and fixing GM wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete 25mm
Supplying and fixing GM wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete 20mm
Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 32MM DIA PVC PIPE
Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 25MM DIA PVC PIPE
Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 20MM DIA PVC PIPE
Levelling the ups and downs of the location by engaging JCB for marking of foundations, etc., with all hire charges etc complete.
Colour washing and Painting 2 coats with approved Plastic Emulsion paint over one priming coat of plastic emulsion paint over cement plastered wall surface, ceiling and other new surface and including cleaning ,preparing the surface and curing etc.complete.
Painting new iron works with two coats synthetic enamel paint over one coat of primer including cost of all materials, lead, lift, etc., complete.
Supplying and fixing MS Channel, angle, channel,, MS rail, MS chequered plate, etc wherever required as directed by the Engineer as per standard specifcation - MS Channel & angle
Filling with good quality gravel including cost of material, labour all lead and lift etc . Complete.
Filling with stone dust including cost of metal ,labour all lead and lift etc. Complete.
Filling with 20 mm B.G metal including cost of metal ,labour all lead and lift etc . Complete.
Assembling of stub and cleat using template for AH type towers including cost of template, transport of Template, stub & cleat to site, all materials, labour, lead, lift, etc., complete and as directed by the Department Engineer at site.
Supplying and fabrication, transporting of various equipment lattice structures inclduing cost of all materials, labour, lead, lift, hot dipped galvanising, etc., complete and as directed by the Department Enigneer at site.
Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size)
Labour charges for erection of towers and tower extensions including sorting out of tower parts, tightening, punching of bolts and nuts and rectification of defects if any during erection of one coat of zinc rich primer, 2 coats of zinc rich enamel paint, cost of all materials, labour lead, lift, etc., complete and as directed by the Department Engineer at site.
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
V.JOTHIKUMARAVEL (BID ID -1394071)
M.JAYAVEL (BID ID -1395066)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_686417.xls
BOQ • 0.40 MB
174150200.pdf
Tender Documents • 0.94 MB
174150202.html
Tender Documents • 0.05 MB
Download all tender documents and submit your bid