Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance 56 ARUNACHALAM MAIN ROAD AMBAL NAGAR PORUR CHENNAI TAMIL NADU 600116 | THIRUVALLUR | TAMIL NADU | 600116 | L1 | Accepted-Finance L1 |
Tender Value
₹9.1 L
EMD Value
₹9,100
Closing Date
12 Aug 2020, 2:00 pmClosed
SUPERINTENDING ENGINEER /ELECTRICAL SYSTEMS /MTPS1
Superintending Engineer Electrical System Mettur Thermal Power Station I Mettur Dam-636406
MTPS I ES Circle EM I Division Unit II Dismandling and assembling of bell cover in the 250MVA BHEL make 230KV 15.75KV Generator Transformer II Internal inspection fault identification rectification due to rising trend of H2 gas level complete over
2020_EB_172750_1
SE / ES / MTPS-I /EM-I/OT.No 34/2020-21
Open Tender
Electrical Works
Works
60 days
MTPS1 METTUR DAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹9,100
Yes
14 Aug 2020
23 Jul 2020
13 Aug 2020
23 Jul 2020
12 Aug 2020
23 Jul 2020
23 Jul 2020 - 12 Aug 2020
Amount
Charges for dismantling the LV turret, LV Bushings, superficial cleaning of LV bushings, and replacement of new gaskets and reassembling in GT. (Cork Gasket supplied by the TANGEDCO)
Charges for Dismantling the transformer bell cover, inspect core & winding, identifying and rectifying the fault due to rising trend of H2 gas level, disconnect the OLTC leads before inspection and reconnect after inspection, changing cover gaskets and closing the bell cover & allied works.(Cork Gasket supplied by the TANGEDCO)
Charges for Complete overhaul of GT OLTC and its all accessories, gaskets and ‘O’ rings and necessary Materials shall be procured from OEM by the tenderer for replacement.(Inspection of OLTC to be carried out under supervision of OEM, M/s Easun MR Tap changers ltd., / Chennai service personnel).
Material cost for OLTC overhaul
Charges for Drying at vacuum, ultra-pure N2 gas filling / heater and measuring/recording Dew point for minimum 4 cycles. The drying shall be increased if adequate dryings are not achieved.(Necessary materials shall be supplied by the tenderer)
Material cost for drying out process such as ultra pure N2 gas, heater, & suitable arrangements etc., including arrangement of vacuum pump.(LS)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .