Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC JAISALMER RAJASTHAN 345001 INDIA UDYAM RJ 18 0001538 | JAISALMER | RAJASTHAN | 345001 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹28.8 L+₹12.4 L (74.9%)Rejected-Finance 40 VISHNU VIHAR KHERAI SHAMSHABAD ROAD KHERAI AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | L2 | Rejected-Finance Not Lowest Bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Meeting Eligibility Criteria |
Tender Value
₹19.5 L
EMD Value
₹39,000
Closing Date
22 Jun 2020, 6:00 pmClosed
GE (AF) Jaisalmer
GE (AF) Jaisalmer
Outsourcing the Resources for Operation and Management of AC Plant, pump House and DG Set at Air Force Stn Jaisalmer
2020_MES_348047_1
8666/GE/E8
Open Tender
Miscellaneous Works
Item Rate
335 days
GE (AF) Jaisalmer
As per tender documents
7 documents required · 7 mandatory
₹500
Yes
GE (AF) Jaisalmer
₹39,000
Yes
9 Jul 2020
28 May 2020
24 Jun 2020
28 May 2020
22 Jun 2020
10 Jun 2020
Amount
Schedule 'A' Part-I General Note as applicable for serial item No 2.00 & 3.00 of BoQ/Sch 'A' Contractors attention is hereby invited that estimated cost of serial item No 2.00 & 3.00 is Rs. 12,06,000.00 based on prevailing rates of Schedule of Minimum fair wages. Quoted amount against serial item No. 2.00 & 3.00 is less than the amount the work (Estimated of serial item No. 2.00 & 3.00 of BoQ/Sch 'A') then lowest bidder will have to deposit FDR in favour of Accepting Officer within 07 days from financial bid opened difference in Estimated cost & quoted amount of serial item No. 2.00 & 3.00 before evaluation of financial bid for acceptance of tender, failing which lowest tender will not be accepted. FDR submitted at the time of Acceptance of bidder will be realesed only after satisfactory proof of payment of deployed person under the respective serial item No. 2.00 & 3.00 of BoQ.
Manning and Operation of Package type AC Plant (Air Cooled) (Bldg No. 5, 8 & 18) of 3x11 TR capacity (02 working and 01 standy), (Bldg No. 17) of 2x11 TR capacity (01 working and 01 standby) and (Bldg No. 1, 3 & 14) located at WSA installation of 3x8.5 TR capacity (02 working and 01 standby) including Electric Supply installations (DG Set) and Water Supply installations (Pump House) in three shift each shift for 8 hours continuous operation every day to maintain inside design temperature condition as specified, including Sunday/Holidays with carring out daily maintenance, Daily and weekly check up, Monthly, quarterly and half yearly maintenance as per maintenance schedule, replacement/repairs of consumable parts i.e greasing of motor bearings, gasket, shellacs, rubber insertion sheets, neoprene rings, fuse, water seal, cotton waste, kerosene oiI, arrangement of labour and tools for smooth functioning of all Plants, complete all as specified and directed by Engineer-in-Charge.
Note for serial item No. 2.00 (Contd....) :- (i) All the seven AC Plant considered in serial item No. 2.00 shall be operated by one operator in one shift, hence three operater for three shifts. (ii) The timing of operation in shifts shall be decided by the department and same shall be followed by the contractor. (iii) During maintenance & operation of AC Plants, if loss of refrigerant and compressor oil take place due to negligence / misshandling of plant by the contractor’s operators and the same shall be made good by the contractor and cost for the same shall deemed to included in unit rate quoted by the contractor against respective items of Sch ‘A’. (iv) In the event of failure to achieve specified inside condition for any shift or part thereof due to non operation or by other reasons (Except failure of incoming electric/water supply at AC installations) contractor shall be penalized at double the rates, what quoted for against above respective items of Sch ‘A’ Part-I. (v) Unit rates quoted by the contractor shall deem to include for three shifts and incase of decrease in shifts, the adjustment of rates shall be done proportionately. Contractor shall provide proper manning to give rest to the deployed person for sunday/holiday. For this purpose contractor shall provide one extra manpower.
Note for serial item No. 2.00 (Contd....) :- (v) Unit rates quoted by the contractor shall deem to include for three shifts and incase of decrease in shifts, the adjustment of rates shall be done proportionately. Contractor shall provide proper manning to give rest to the deployed person for sunday/holiday. For this purpose contractor shall provide one extra manpower (vi) Daily attendance shall be marked in attendance register by the JE Concerned attandance shall be checked weekly at least by the EIC and monthly by the GE. (vii) Dos" and Don'ts" standing orders of operating machines maintinance programme shall be displayed in each instalation (viii) Log book, log sheet shall be filled shift wise. (ix) Operator shall be in proper uniform As approved by the GE and cost of uniform included in the rate quoted. (x) Surrounding area shall be kept clean and tidy.Tool required for cleaning is deemed to be included in the quoted rates. (xi) Unit rates quoted by the tenderrs shall deem to include for Nuts,bolts,Washers,Lugs,Thimbles,wires,terminal clamps, disttiled water required for efficient and smooth functioning of the equipment with out any extra cost to the Govt.
Note for serial item No. 2.00 (Contd....) :- (xii) Absent from duty of technician is not permissible as E&M services essential in nature. However, found penalty will be levied Rs 800.00 per men per shift and recovery from bill shall be done through recovery statement. (xiii) Tenderer shall arrange insurance to his work-men and relevant proofs of the same shall be submitted to the department as and when demanded, the cost for the same is deemed to be included in the rate quoted. Responsibility of compliance of labour regulations in force lies with the tenderer.The provision of statutory laws relating to minimum wages, EPF, ESI payments shall be strictly adhered to by the contractor. The Contractor shall produce proof of payment of wages, EPF and ESI against the respective workmen while claiming payments, The contractor shall employee deployee ITI holder or 05 years experience and recognized govt institute and produce the documents.
Manning and Operation of DG Set 160 KVA, Pump House including Chiller type AC plant (Water cooled) 2x50 TR (01 working and 01 Standby) installation in two shift each shift for 8 hours per day of month continuous operation including sundays/holidays in a day to day maint inside design temperature condition as specified, including the maintenance, daily and weekly check up, Monthly, quarterly and half yearly maint as per maint schedule, replacement/repairs consumable parts i.e (i) Greasing of motor bearings (ii) Gasket, shellacs, rubber insertion sheets, neoprene rings, fues, water seal, cotton waste, kerosene oiI (iii) Arrangement of labour and tools for smooth functioning of plants complete all as specified and directed by Engineer-in-Charge
Note for serial item No. 3.00 (Contd....) (i) All the E/M Installation considered in serial item No. 3.00 shall be operated by one operater in one shift, hence two operater for two shifts. (ii) The timing of operation in shifts shall be decided by the department and same shall be followed by the contractor. (iii) During maintenance & operation of DG Sets, if loss of POL (Petroleum oil and lubricant) refrigerant and compressor oil take place due to negligence/ misshandling of plant by the contractor’s operators and the same shall be made good by the contractor and cost for the same shall deemed to included in unit rate quoted by the contractor against respective items of Sch ‘A’. (iv) Daily attendance shall be marked in attendance register by the JE Concerned attandance shall be checked weekly at least by the EIC and monthly by the GE.
Note for serial item No. 3.00 (Contd....) (v) In the event of failure of operation of DG Set for any shift or part thereof due to non operation or by other reasons contractor shall be penalized at double the rates, what quoted for against above respective items of Sch ‘A’ Part-I. (vi) Unit rates quoted by the contractor shall deem to include for two shifts and incase of decrease in shifts, the adjustment of rates shall be done proportionately. Contractor shall provide proper manning to give rest to the deployed person for sunday/holiday. For this purpose contractor shall provide one extra manpower. (vii) Dos" and Don'ts" standing orders of operating machines maintinance programme shall be displayed in each instalation. (viii) Log book, log sheet shall be filled shift wise. (ix) Operator shall be in proper uniform As approved by the GE and cost of uniform included in the rate quoted. (x) Surrounding area shall be kept clean and tidy.Tool required for cleaning is deemed to be included in the quoted rates. (xi) Unit rates quoted by the tenderrs shall deem to include for Nuts,bolts,Washers,Lugs,Thimbles,wires,terminal clamps, disttiled water required for efficient and smooth functioning of the equipment with out any extra cost to the Govt.
Note for serial item No. 3.00 (Contd....) (xii) Absent from duty of technician is not permissible as E&M services essential in nature. However, found penalty will be levied Rs 800.00 per men per shift and recovery from bill shall be done through recovery statement. (xiii) Tenderer shall arrange insurance to his work-men and relevant proofs of the same shall be submitted to the department as and when demanded, the cost for the same is deemed to be included in the rate quoted. Responsibility of compliance of labour regulations in force lies with the tenderer.The provision of statutory laws relating to minimum wages, EPF, ESI payments shall be strictly adhered to by the contractor. The Contractor shall produce proof of payment of wages, EPF and ESI against the respective workmen while claiming payments. The contractor shall employee deployee ITI holder or 05 years experience and recognized govt institute and produce the documents.
Schedule 'A' Part-II S&F in replacement of V Belt A 28/29/30 Make : FENNER complete all as specified and directed.
S&F in replacement of Gas Charging Valve 1/4 inch as per sample complete all as specified and directed.
S&F in replacement Expansion valve to control the refrigerant flow in a refrigeration system including gas welding as per site requirement complete all as specified and directed.
S&F in replacement relay card for condencer motor as per sample complete all as specified and directed.
S&F in replacement High pressure/ low pressure (HP/LP) cut out MP-5 Make : Indfoss/Danfoss as per sample complete all as specified and directed.
S&F in replacement P No 205 (set of two) for AC blowers including turning the shaft as per reqirement at site complete all as specified and directed.
S&F in replacement Temperature sensor for AC plant of 10 TR capacity complete all as specified and directed.
S&F in replacement Liquid line valve for AC package unit 10 TR capacity complete all as specified and directed.
S&F in replacement Blower Shaft suitable for 10 TR capacity AC Plant complete all as specified and directed.
S&F in replacement Blower suitable for 10 TR capacity AC Plant complete all as specified and directed.
S&F in replacement MPD range 2-22 Amp as per sample complete all as specified and directed.
Supply and filling refrigerant gas R-22 for charging complete all as specified and directed.
Supply and filling refrigerant gas R-407c for charging complete all as specified and directed.
M&L for rewinding of electric motor of capacity 1.5 HP with supper enameled copper winding wire of existing gauge, size and weight with insulating mataerial and reassembling and re-fixing in the same position including dismantling and removing the burnt out copper winding wire and cleaning the slot of stator properly complete all as specified and directed by Engr-in-Charge.
M&L for rewinding of electric motor of capacity 2.0 HP with supper enameled copper winding wire of existing gauge, size and weight with insulating mataerial and reassembling and re-fixing in the same position including dismantling and removing the burnt out copper winding wire and cleaning the slot of stator properly complete all as specified and directed by Engr-in-Charge.
M&L for rewinding of electric motor of capacity 3.0 HP with supper enameled copper winding wire of existing gauge, size and weight with insulating mataerial and reassembling and re-fixing in the same position including dismantling and removing the burnt out copper winding wire and cleaning the slot of stator properly complete all as specified and directed by Engr-in-Charge.
M&L for rewinding of electric motor of capacity 5.0 HP with supper enameled copper winding wire of existing gauge, size and weight with insulating mataerial and reassembling and re-fixing in the same position including dismantling and removing the burnt out copper winding wire and cleaning the slot of stator properly complete all as specified and directed by Engr-in-Charge.
M&L for finding out the leakage and pressure test with filling N2 gas inside of the condensor and cooling coil of Package type AC Plant of 10/11 TR capacity and dismantling the same for repair the leakage point by brazing/soldering including taking down and refixing the unit and testing the AC unit complete all as specified.
M&L in replacement of Drier filter suitable for ductable/package type AC Plant size 5/8" Make: Danfoss/indofoss complete all as specified.
M&L in replacement of 2.0 HP Induction Blower Motor, 3 Phase, 415 Volt, 50 Hz, 1400 RPM, (As per Sample) complete all as specified. Make : CG/Kiroskar/Hindusthan
M&L in replacement of 1.5 HP capacity condensor Motor, 3 Phase, 415 Volt, 50 Hz complete all as specified. Make : CG/Kiroskar/Hindusthan
Supply, installation, commissioning and testing Compressor scroll type Copper wound working on R-407c, capacity 5.0 TR and compressor shall be equipped with sunction and discharge stop valves, sunctions, strainer, oil pump with oil strainer, high pressures switch and safety valves and gauges oil measuring the sunction and discharge pressure and the coil pressure shall be provied. Compressor shall be provided with unloading starting device and crank case heater system shall be provided including taking down old unserviceable compressor complete all as specified and directed. Make : Copeland Scroll Model Number ZR72KC-TFD-522, Serial No. 03B0903AT or equivalnet of Kirloskar/ELG.
Supply, installation, commissioning and testing of Compressor scroll type Copper wound working on R-407c, Capacity 8.75 TR and compressor shall be equipped with sunction and discharge stop valves, sunctions, strainer, oil pump with oil strainer, high pressures switch and safety valves and gauges oil measuring the sunction and discharge pressure and the coil pressure shall be provied.Compressor shall be provided with unloading starting device and crank case heater system shall be provided including taking down old unserviceable compressor complete all as specified and directed. Make : Danfoss Model Number HCP109T4LC6 or equivalent.
Supply, installation, commissioning and testing of Compressor scroll type Copper wound working on R-407c, Capacity 11 TR and compressor shall be equipped with sunction and discharge stop valves, sunctions, strainer, oil pump with oil strainer, high pressures switch and safety valves and gauges oil measuring the sunction and discharge pressure and the coil pressure shall be provied.Compressor shall be provided with unloading starting device and crank case heater system shall be provided including taking down old unserviceable compressor complete all as specified and directed. Make : Danfoss Model Number SZ185S4RC or equivalent.
S&F in replacement of alluminium fan assembly with fan and blade for AC plant complete all as specified.
S&F in replacement of condenser fan Blade 20" complete all as specified.
Repair/maint and servicing of condensor fan motor for outdoor unit i/c ball bearing, studs, nuts, bolts, washers, gland packing, greasing etc as required complete all as specified.
S&F in replacement Canvas from pakage unit to inlet duct including accessaries and in repair in return grill with accessaries complete as directed Engineer-in-charge
S&F Contactor, 45 Amps with AC coil voltage, 415 volts, 50 Hz, 7.5 KW, 5.00 HP, fixed in existing panel including disconnecting & taking down old existing unserviceable contactor complete all as specified and directed. Make : Siemens Cat Part No. 3TF46 or Legrand/ ABB/S&C.
S&F Contactor, 32 Amps with AC coil voltage, 415 volts, 50 Hz, 7.5 KW, 5.00 HP, fixed in existing panel including disconnecting & taking down old existing unserviceable contactor complete all as specified and directed. Make : Seimens Cat Part No. 3TF44 or Legrand/ ABB/S&C.
M&L for Descaling of Condenser unit complete with Descaling Chemical (SCALE2/38249022) including cooling tower complete all as specified and directed by Engr-in-Charge. Note : Three number chillar unit will be considered as one Job)
S&F MCCB, 4 Pole, 125 Amps rating, rupturing capacity 36 kA, 415 Volt grade, AC, 50 Hz, Magnetic fixed type and making connections using suitable size copper lugs/thimbles and crimping tool, including disconnecting & taking down old unserviceable MCCB, complete all as specified and directed. Make : Legrand Cat Part No. 4200 96 or Havells/Siemens/ABB.
S&F MCCB, 4 Pole, 160 Amps rating, rupturing capacity 36 kA, 415 Volt grade, AC, 50 Hz, Magnetic fixed type and making connections using suitable size copper lugs/thimbles and crimping tool, including disconnecting & taking down old unserviceable MCCB, complete all as specified and directed. Make : Legrand Cat Part No. 4200 97 or Havells/Siemens/ABB.
S&F MCCB, 4 Pole, 200 Amps rating, rupturing capacity 36 kA, 415 Volt grade, AC, 50 Hz, Magnetic fixed type and making connections using suitable size copper lugs/thimbles and crimping tool, including disconnecting & taking down old unserviceable MCCB, complete all as specified and directed. Make : Legrand Cat Part No. 4202 48 or Havells/Siemens/ABB.
S&F MCCB, 4 Pole, 400 Amps rating, rupturing capacity 50 kA, 415 Volt grade, AC, 50 Hz, Magnetic fixed type and making connections using suitable size copper lugs/thimbles and crimping tool, including disconnecting & taking down old unserviceable MCCB, complete all as specified and directed. Make : Legrand Cat Part No. 4220 21 or Havells/Siemens/ABB.
S&F MCB, TPN, 32 Amps rating, with over load and short circuit protection 'C' curve and rupturing capacity 10 kA, 415 Volt grade, AC, 50 Hz and making connections using suitable size copper lugs/thimbles, including disconnecting & taking down old unserviceable MCB, complete, all as specified & directed. Make : Legrand Cat Part No. 4086 80 or Seimens/Havells/ABB
S&F MCB, TPN, 40 Amps rating, with over load and short circuit protection 'C' curve and rupturing capacity 10 kA, 415 Volt grade, AC, 50 Hz and making connections using suitable size copper lugs/thimbles, including disconnecting & taking down old unserviceable MCB, complete, all as specified & directed. Make : Legrand Cat Part No. 4086 81 or Seimens/Havells/ABB
S&F MCB, TPN, 63 Amps rating, with over load and short circuit protection 'C' curve and rupturing capacity 10 kA, 415 Volt grade, AC, 50 Hz and making connections using suitable size copper lugs/thimbles, including disconnecting & taking down old unserviceable MCB, complete, all as specified & directed. Make : Legrand Cat Part No. 4086 83 or Seimens/Havells/ABB
S&F electronic type Single Phase Preventor suitable for 3 Phase, 415 Volt, Modal No. VSPM2 of any make and any size, over loading, under voltage, over voltage, complete as per sample including disconnecting & taking down old unserviceable Single Phase Preventor, complete all as specified and directed. Make : C&S/Havells/ABB/L&T
S&F in replacement of Pressure Gauge 4" dial 0-21 Kgs rating complete all as specified.
S&F in replacement of cooling tower Strainer filter as per sample complete all as specified.
S&F in replacement of cooling tower Sprinkler as per sample complete all as specified.
S&F in replacement of cooling tower fins of suitable size as per sample complete all as specified and directed by Engineer-in-Charge.
S.D. And Company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .