Loading…
Loading…
Tender Value
₹5.0 L
EMD Value
₹9,988
Closing Date
8 Oct 2026, 2:00 pm
ADM (Infrastructure)
Alipore, Kolkata - 700027
REPAIRING AND RENOVATION WORK OF 1ST FLOOR SBI OLD BUILDING (PART- 1).
2026_DMSP_5075044_1
SPG/N-10/26-27
Open Tender
CIVIL WORKS
Percentage
ZP Office, Alipore
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹9,988
Yes
24 Sept 2026
24 Sept 2026
10 Oct 2026
24 Sept 2026
8 Oct 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair & Renovation Work | |||||
| 1.01 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in First floor. | 4.5 | M2 | 740.65 | ₹3,332.92 |
| 1.02 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 2.35 | M2 | 361 | ₹848.35 |
| 1.03 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. | 0.35 | M3 | 5,400 | ₹1,890 |
| 1.04 | Stripping off worn out plaster and raking out joints of walls,celings etc.upto any height and in any floor including removing rubbish within a
lead of 75m as directed. | 129.65 | M2 | 19 | ₹2,463.35 |
| 1.05 | Cutting chase upto125x150 mm.and subsequent mending of damages. (a) in brick wall [Cement-3.6 Kg/Mtr] | 55 | M | 93 | ₹5,115 |
| 1.06 | Plaster(towall, floor, ceilingetc.)with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] A) 15 mm. th - 1: 4 | - | - | - | - |
| 1.07 | a) 15 mm. th. | 99.5 | M2 | 163.21 | ₹16,239.4 |
| 1.08 | b) 10 mm. th. | 30.15 | M2 | 130.59 | ₹3,937.29 |
| 1.09 | Dismantling artificial stone flooring upto 50mm. Thick by carefully chiselling without damaging the baseand removing rubbish as directed withina lead of 75 m. b) Extra for each addl. Floor over the rate of
First Floor | 54.06 | M2 | 56 | ₹3,027.36 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_5163892.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .