Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L | L1 | Accepted-AOC lowest |
| 2 | L2₹1.9 L+₹420 (0.22%)Rejected-Finance MALANCHA PALLY ENGLISH BAZAR MALDA WEST BENGAL PIN 732103 | ENGLISH BAZAR | MALDA | WEST BENGAL | 732103 | ₹1.9 L+₹420 (0.22%) | L2 | Rejected-Finance above rate |
| 3 | L3₹1.9 L+₹516 (0.27%)Rejected-Finance | ₹1.9 L+₹516 (0.27%) | L3 | Rejected-Finance above rate |
Tender Value
₹1.9 L
EMD Value
₹3,820
Closing Date
14 Sept 2026, 11:00 amClosed
REGIONAL MANAGER WBTDCC
Regional office wbtdcc ltd jalpaiguri
Construction of Cycle stand in the ground Jitpur high school under Vivekananda 1 GP within Alipurduar district of BEUP fund
2026_WBTDL_1040346_2
91 /WBTDCC/IV-123(I)/26-27
Open Tender
CIVIL WORKS
Lump-sum
30 days
Vivekananda
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹3,820
23 Sept 2026
3 Sept 2026
16 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm....... | 12.85 | Cum | 120.47 | ₹1,548.04 |
| 2 | Single layer brick flat soling with 1st class picked jhama
bricks incl. ramming and dressing bed to proper level and filling joints with powdered earth. | 54 | sqm | 340 | ₹18,360 |
| 3 | OrdinaryCementconcrete(mix1:2:4)with graded stone chips (20mmnominalsize)excludingshutteringandreinforcement,if any, in ground floor as per relevant IS codes. | 3.29 | Cum | 4,644 | ₹15,297.34 |
| 4 | Ordinary Cement concrete (mix1:1.5:3) with graded stone chips (20mm nominal size)excluding shuttering and reinforcement ifany, in ground floor as per relevant IS codes. (i) Pakur Variety | 4.95 | Cum | 5,535 | ₹27,398.25 |
| 5 | (i)Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge | 35 | sqm | 351 | ₹12,285 |
| 6 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking
out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75kg/sq.m all complete including all materials and labour. (ii) 25 mm. thick | 54 | sqm | 303 | ₹16,362 |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m | 0.1 | MT | 63,049 | ₹6,304.9 |
| 8 | M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to
one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, | 0.5 | MT | 69,970 | ₹34,985 |
| 9 | Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L
hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)(GCI sheet to be supplied by contractor)(i) In Roof:-a) With 0.80 mm thick sheet | 30 | sqm | 755 | ₹22,650 |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:4 cement mortar (b) 15 mm thick plaster | 30 | sqm | 169 | ₹5,070 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.78 MB
BOQ_2554760.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .