| Sl No | Description | Qty | Unit | RINTU MONI DEKA L2 | BLUETECH GLOBAL ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 5 | Cum | 250 ₹1,250 | 188 ₹940 Lowest |
| 2.00 | Credit for taking away unserviceable steel Gates / Grills / Fencing Angles / other steel items etc., as is where is basis. | 400 | Kg | 25 ₹-10,000 | 15 ₹-6,000 Lowest |
| 3.00 | Shifting of Big tree root and base of girth upto 5.00 m from the TE Building compound to outside within a lead of 100 m using Hydraulic Excavator or any other suitable machinery etc. Complete all as directed by the Engineer-in-charge. | 1 | job | 5,000 ₹5,000 | 2,800 ₹2,800 Lowest |
| 4.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 4.01 | All kinds of soil. | 20 | Cum | 300 ₹6,000 | 250 ₹5,000 Lowest |
| 5.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 10 | Cum | 300 ₹3,000 | 188 ₹1,880 Lowest |
| 6.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 6.01 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.5 | Cum | 10,000 ₹15,000 | 8,000 ₹12,000 Lowest |
| 6.02 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 4 | Cum | 8,000 ₹32,000 | 5,500 ₹22,000 Lowest |
| 7.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
Tender Value
₹4.9 L
EMD Value
₹9,870
Closing Date
10 Nov 2025, 5:00 pmClosed
Executive Engineer (C)
BSNL Civil Division 2 nd Floor BSNL Bhawan Panbazar Guwahti 781 001
Construction of Front Compound wall with Gate at Boko TE Building under Kamrup BA
2025_BSNL_254181_1
NIT No 044/BSNL/CDGH/25-26
Open Tender
Civil Works
Item Rate
60 days
BOKO
As mentioned in the Tender Documents
2 documents required · 2 mandatory
₹590
Yes
AO (Cash) O/O. GMTD Kamrup BA
₹9,870
Yes
19 Nov 2025
1 Nov 2025
14 Nov 2025
1 Nov 2025
10 Nov 2025
2 Nov 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
TenderDocBokoCompWallNIT44.pdf
Tender Documents • 1.68 MB
BOQ_292488.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .