Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 7TH FLOOR FLAT NO 02 UNITY ENCLAVE BLOCK C MEDAVAKKAM ROAD MAMBAKKAM 600 127 | CHENGALPATTU | TAMIL NADU | 600127 | Admitted-Finance |
| 2 | Admitted-Finance NO 03 PERUMAL KOVIL STREET MINJUR 601203 | THIRUVALLUR | TAMIL NADU | 601203 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,300
Closing Date
20 May 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE M II NCTPS II
SE M II NCTPS II chennai120
Cleaning and Inspection of journal and thrust bearings
2022_EB_232063_1
SE MECH II O M NCTPS II 35 22 23
Open Tender
Miscellaneous Works
Works
30 days
SE M II NCTPS II
Refer Tender specification
2 documents required · 2 mandatory
₹0
₹6,300
Yes
30 May 2022
13 May 2022
21 May 2022
13 May 2022
20 May 2022
13 May 2022
90 days
Amount
Cleaning, Inspection, Rectification / Replacing of Boiler feed pump Drive end Journal Bearing.
Cleaning, Inspection, Rectification / Replacing of Boiler feed pump Non Drive end Journal Bearing.
Cleaning, Inspection, Rectification / Replacing of Boiler feed pump Thrust Bearing.
Cleaning, Inspection, Rectification / Replacing of Booster pump Drive end Journal Bearing.
Cleaning, Inspection, Rectification / Replacing of Booster pump Non Drive end Journal Bearing.
Cleaning, Inspection, Rectification / Replacing of Booster pump Thrust Bearing.
Inspection of coupling, checking the alignment between BP and Motor.
Inspection of coupling, checking the Alignment between BFP and Hydraulic coupling.
Inspection of coupling, checking the Alignment between Motor and Hydraulic coupling.
Dismantling of TDBFP ACV servomotor in governing system by using lifting rope after removing the drain line, fixing plate, connecting lever with threaded sleeve and pin from bell crank lever, intermediate piece.
Dismantling the TDBFP ACV hydraulic control cylinder in governing system by removing the circlips, shaft, I bolt, spacers, after securing the total assembly with lifting rope, removing the feed back cam, bottom mounting pin with circlip, main bar fastened over connecting rod after removing the internal threaded pin & tapper pin.
Replacing of seal kit in TDBFP ACV hydraulic servo cylinder by dismantling of hydraulic servo cylinder by removing the barrel mounting bolts-4nos, piston rod, seal kit, piston & it ring, cleaning the internals, replacement of seal kit & piston ring and reassembling.
Dismantling of TDBFP ACV by removal of spring holding bolts, spring top plate, spring, disconnecting and removal of coupling between actuator and valve spindle, removal of actuator spindle, removal of valve bonnet bolts, lifting and removal of valve bonnet, removal of valve spindle with plug.
Complete cleaning of TDBFP ACV internals includes spring, actuator spindle, valve spindle, valve internal and external body, valve seating area in both valve body and in spindle. Lapping of valve seating areas, blue matching the valve seating areas with each other continuing the lapping and blue matching process till the achiving of satisfactory blue matching level.
Assembling of TDBFP ACV internals such as fixing of valve spindle, bonnet, bonnet bolts, fixing coupling between valve and actuator spindle,fixing of spring, spring top plate, spring holding bolts in sequence.
In TDBFP ACV testing the free movement of piston inside the Hydraulic Control Cylinder, cleaning of external parts, assembling the Hydraulic Control Cylinder by fastening the main bar to connecting rod, fixing of protection roller bearing nart guide, inserting tapper pin, bell crank lever, joining lever, lifting the total assembly with lifting rope, positioning, inserting the shaft, I bolt, spacers and arresting it with circlips, inserting the bottom mounting pin and assembling the intermediate piece with new gasket.
Dismantling and cleaning of TDBFP ACV servo motor internals such as pilot, spring, bearing, re-assembling the internals, lifting the Servomotor with lifting rope, positioning and assembling with intermediate piece with new gasket, assembling the drain lines, fixing plate, connecting the lever with threaded sleeve.
Dismantling of TDBFP MCV Servomotor in governing system by using lifting rope after removing the drain line, fixing plate, connecting lever with threaded sleeve and pin from bell crank lever, intermediate piece.
Dismantling the TDBFP MCV Hydraulic control cylinder in governing system by removing the circlips, shaft, I bolt, spacers, after securing the total assembly with lifting rope, removing the feed back cam, bottom mounting pin with circlip, main bar fastened over connecting rod after removing the internal threaded pin & tapper pin.
Replacing of Seal kit in TDBFP MCV Hydraulic servo cylinder by dismantling of hydraulic servo cylinder by removing the barrrel mounting bolts-4Nos, piston rod, seal kit, piston & it ring, cleaning the internals, replacement of seal kit & piston ring and reassembling.
In TDBFP MCV testing the free movement of piston inside the Hydraulic Control Cylinder, cleaning of external parts, assembling the Hydraulic Control Cylinder by fastening the main bar to connecting rod, fixing of protection roller bearing nart guide, inserting tapper pin, bell crank lever, joining lever, lifting the total assembly with lifting rope, positioning, inserting the shaft, I bolt, spacers and arresting it with circlips, inserting the bottom mounting pin and assembling the intermediate piece with new gasket.
Dismantling and cleaning of TDBFP MCV servo motor internals such as pilot, spring, bearing, re-assembling the internals, lifting the Servomotor with lifting rope, positioning and assembling with intermediate piece with new gasket, assembling the drain lines, fixing plate, connecting the lever with threaded sleeve.
AGARTHI ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .