Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance GERUA PO BARKHOPA PS TAMULPUR DIST BAKSA ASSAM PIN 781367 | BAKSA | ASSAM | 781367 | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MD. FAIZUDDIN AHMED L1 | NAHEED HUSSAIN SAIKIA L2 | BRAHMAPUTRA ENGINEERS L3 |
|---|---|---|---|---|---|---|
| 1.00Part-A: Construction of RCC Check Dam | ||||||
| 1.01 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc. | 0.08 | Ha | 55,808.98 ₹4,520.53 | 55,808.98 ₹4,520.53 | 55,808.98 ₹4,520.53 |
| 1.02 | Earth work in excavation of foundation for structures as per drawing & technical
specification, including seting out, construction of shoring & bracing, removal of stumps & other deleterious matterr dressing of sides & bottom and backfilling in trenches with approved material
Above GBL | 985.1 | Cum | 145.18 ₹1.4 L | 145.18 ₹1.4 L | 145.18 ₹1.4 L |
| 1.03 | Earth work in excavation of foundation for structures as per drawing & technical
specification, including seting out, construction of shoring & bracing, removal of stumps & other deleterious matterr dressing of sides & bottom and backfilling in trenches with approved material
Bellow GBL | 195.85 | Cum | 159.46 ₹31,229.60 | 159.46 ₹31,229.60 | 159.46 ₹31,229.60 |
| 1.04 | Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40 mm normal size mechanically mixed, placed in foundation and compacted by vibration | 23.59 | Cum | 6,565.23 ₹1.5 L | 6,565.23 ₹1.5 L | 6,565.23 ₹1.5 L |
| 1.05 | RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work | 241.72 | Cum | 8,105.6 ₹19.6 L | 8,593.74 ₹20.8 L | 8,485 ₹20.5 L |
| 1.06 | Supplying, fitting & placing TMT bar reinforcement in substructure | 145.03 | Qntl. | 6,868.09 ₹10.0 L | 6,868.09 ₹10.0 L | 6,868.09 ₹10.0 L |
| 1.07 | Plastering with cement mortar ( 1 : 3 ) on R.C.C. works | 660.89 | Sqm. | 154.19 ₹1.0 L | 154.19 ₹1.0 L | 154.19 ₹1.0 L |
| 1.08 | Providing and laying of filter media with granular material/stone crushed aggregates satisfying the requirment laid down in clause 2504.2.2 of MoRTH
specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toward the Head Wall to the full height | 136.8 | Cum | 2,158.18 ₹3.0 L | 2,158.18 ₹3.0 L | 2,158.18 ₹3.0 L |
| 1.09 | Earth Work in filling in front of the guid bund by head load up to lead of 60 m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10 kg and falling from height of not less than 90 cm and sprinkling with water if necessary
(i) In front & Both Side of the Structure | 263.98 | Cum | 107.22 ₹28,303.40 | 107.22 ₹28,303.40 | 107.22 ₹28,303.40 |
Tender Value
₹2.3 Cr
EMD Value
₹4.5 L
Closing Date
24 Mar 2026, 1:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Mitigation of Flash Flood by Reducing Sediment Load through Mechanical and Ecological Management Practices (EMPs) in Laupara village under SDMF
2026_SCD_51899_3
Tender/NIT/Pt-II/2025-26/8711
Open Tender
Civil Works
180 days
Baksa Soil Conservation Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,540
₹4.5 L
Yes
25 May 2026
12 Mar 2026
25 Mar 2026
13 Mar 2026
24 Mar 2026
16 Mar 2026
Part-A: Construction of RCC Check Dam
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc.
Earth work in excavation of foundation for structures as per drawing & technical specification, including seting out, construction of shoring & bracing, removal of stumps & other deleterious matterr dressing of sides & bottom and backfilling in trenches with approved material Above GBL
Earth work in excavation of foundation for structures as per drawing & technical specification, including seting out, construction of shoring & bracing, removal of stumps & other deleterious matterr dressing of sides & bottom and backfilling in trenches with approved material Bellow GBL
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40 mm normal size mechanically mixed, placed in foundation and compacted by vibration
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work
Supplying, fitting & placing TMT bar reinforcement in substructure
Plastering with cement mortar ( 1 : 3 ) on R.C.C. works
Providing and laying of filter media with granular material/stone crushed aggregates satisfying the requirment laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toward the Head Wall to the full height
Earth Work in filling in front of the guid bund by head load up to lead of 60 m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10 kg and falling from height of not less than 90 cm and sprinkling with water if necessary (i) In front & Both Side of the Structure
Earth Work in filling in front of the guid bund by head load up to lead of 60 m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10 kg and falling from height of not less than 90 cm and sprinkling with water if necessary (ii) In Periphery Bundh
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, including preparation of ground, fetching of sods and watering
Providing & laying boulder apron on gully bed in up stream and down stream of RCC structure for protection against scour with stone boulders weighting not less than 40 kg each
Providing Weep Holes in RCC Head Wall etc. with 100 mm dia AC pipe extending through full width of the structure with slope of IV:20 H towards drawing face
Construction of diversion channel to flow the water of the propose site
Earthwork in filling the diversion channel after completion of work
Part - A Construction of Boulder Rivetment
Earth work in excavation of foundation of structures
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each
Haulage and loding and unloading of Man size Boulder in project site. (Enclosed rate analysis)
RCC sign board including painting , writing & fitting fixing at project site
Part-B: Construction of RCC Check Dam
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc.
Earth work in excavation of foundation for structures as per drawing & technical specification, including seting out, construction of shoring & bracing, removal of stumps & other deleterious matterr dressing of sides & bottom and backfilling in trenches with approved material Above GBL
Earth work in excavation of foundation for structures as per drawing & technical specification, including seting out, construction of shoring & bracing, removal of stumps & other deleterious matterr dressing of sides & bottom and backfilling in trenches with approved material Bellow GBL
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40 mm normal size mechanically mixed, placed in foundation and compacted by vibration
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work
Supplying, fitting & placing TMT bar reinforcement in substructure
Plastering with cement mortar ( 1 : 3 ) on R.C.C. works
Providing and laying of filter media with granular material/stone crushed aggregates satisfying the requirment laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toward the Head Wall to the full height
Earth Work in filling in front of the guid bund by head load up to lead of 60 m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10 kg and falling from height of not less than 90 cm and sprinkling with water if necessary (i) In front & Both Side of the Structure
Earth Work in filling in front of the guid bund by head load up to lead of 60 m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10 kg and falling from height of not less than 90 cm and sprinkling with water if necessary (ii) In Periphery Bundh
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, including preparation of ground, fetching of sods and watering
Providing & laying boulder apron on gully bed in up stream and down stream of RCC structure for protection against scour with stone boulders weighting not less than 40 kg each
Providing Weep Holes in RCC Head Wall etc. with 100 mm dia AC pipe extending through full width of the structure with slope of IV:20 H towards drawing face
Construction of diversion channel to flow the water of the propose site
Earthwork in filling the diversion channel after completion of work
Part-B: Construction of Boulder Revetment
Earth work in excavation of foundation of structures
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each
Haulage and loding and unloading of Man size Boulder in project site. (Enclosed rate analysis)
RCC sign board including painting , writing & fitting fixing at project site
Part-C: Construction of RCC Check Dam
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc.
Earth work in excavation of foundation for structures as per drawing & technical specification, including seting out, construction of shoring & bracing, removal of stumps & other deleterious matterr dressing of sides & bottom and backfilling in trenches with approved material Above GBL
Earth work in excavation of foundation for structures as per drawing & technical specification, including seting out, construction of shoring & bracing, removal of stumps & other deleterious matterr dressing of sides & bottom and backfilling in trenches with approved material Bellow GBL
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40 mm normal size mechanically mixed, placed in foundation and compacted by vibration
RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work
Supplying, fitting & placing TMT bar reinforcement in substructure
Plastering with cement mortar ( 1 : 3 ) on R.C.C. works
Providing and laying of filter media with granular material/stone crushed aggregates satisfying the requirment laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toward the Head Wall to the full height
Earth Work in filling in front of the guid bund by head load up to lead of 60 m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10 kg and falling from height of not less than 90 cm and sprinkling with water if necessary (i) In front & Both Side of the Structure
Earth Work in filling in front of the guid bund by head load up to lead of 60 m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10 kg and falling from height of not less than 90 cm and sprinkling with water if necessary (ii) In Periphery Bundh
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, including preparation of ground, fetching of sods and watering
Providing & laying boulder apron on gully bed in up stream and down stream of RCC structure for protection against scour with stone boulders weighting not less than 40 kg each
Providing Weep Holes in RCC Head Wall etc. with 100 mm dia AC pipe extending through full width of the structure with slope of IV:20 H towards drawing face
Construction of diversion channel to flow the water of the propose site
Earthwork in filling the diversion channel after completion of work
Part-C: Construction of Boulder Revetment
Earth work in excavation of foundation of structures
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each
Haulage and loding and unloading of Man size Boulder in project site. (Enclosed rate analysis)
RCC sign board including painting , writing & fitting fixing at project site
Part-D: Construction of Boulder Revetment
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, samplings and trees grith upto 300mm, removal of stumps of trees cut earlier and disposal of the unserviceable materials etc.
Earth work in excavation of foundation for structures as per drawing & technical specification
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each
Haulage and loding and unloading of Man size Boulder in project site. (Enclosed rate analysis)
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 (Including cost of testing of materials at site and laboratory as directed by the dept.)
RCC sign board including painting , writing & fitting fixing at project site
Part-E: Construction of Household Plantationm with Iron Khasa
Tree Guard with MS iron (Providing and fixing MS iron tree guard 60 cm dia and 2 metre high above ground level formed of 4 nos (25 x 6 mm) and 8 nos (25 x 3 mm) vertical MS riveted to 3 nos 25 x 3 mm and steel wire 3 mm dia welded and fabricated as per design in two halves bolted together
Part-F: Construction of Geo Net Along Plantation
Clearing and Grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings, removal of stumps and disposal of unserviceable materials etc.
Excavation for roadway in soil using manual means using cut earth to embankment in the immediate vicinity.
Supplying, providing, planting and carrying of seedling @0.25m c/c complete as directed. (As per local market rate)
Providing and laying one layer of non-woven geotetile of minimum mass per unit area of 130-500 gms/sq.m having minimum roll width of 5.00 m ith physical properties as given in clause no. 702.2.3 over 25 mm thick compacted sand layer on a preapred subgrade as a filter media with necessary overlaps as per drawing and technical specification and as directed by the deparment etc.
Providing, fitting and fixing RCC Signboard
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
LauparaBaksaSMDFBid.pdf
Tender Documents • 1.02 MB
BOQ_82248.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid