| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-AOC | ₹18.1 L | L1 | Accepted-AOC Less Quoted Estimate Rate |
| 2 | L2₹18.2 LRejected-AOC THIRU K RISHIKESAVAN CONTRACTOR WALAJABAD KANCHEEPURAM DISTRICT | ₹18.2 L | L2 | Rejected-AOC Above Quoted Estimate Rate |
| Sl No | Description | Qty | Unit | K.RISHIJESAVAN L2 | S.SELVAM L1 |
|---|---|---|---|---|---|
| 1.00Name of Work: Construction of 3.0m Span RCC Culvert to Athivakkam Village in Athivakkam Panchayat under PMAGY 2025-2026 Est Amt 1000000/- | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B | 147.1 | Cum | 293 ₹43,100.30 | 263 ₹38,687.30 |
| 3.00 | Supply and filling foundation and basement with filling sand in layer not more than 15cm,thick well ramed,watered and compacted complete complying with standard specification | 6.4 | Cum | 1,945 ₹12,448 | 1,915 ₹12,256 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 19.18 | Cum | 5,648 ₹1.1 L | 5,618 ₹1.1 L |
| 5.00 | Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 71.16 | Cum | 5,929 ₹4.2 L | 5,899 ₹4.2 L |
| 6.00 | Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete | 99.2 | Sqm | 1,125 ₹1.1 L | 1,095 ₹1.1 L |
| 7.00 | Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete | 24.78 | Sqm | 1,125 ₹27,877.50 | 1,095 ₹27,134.10 |
| 8.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 3.45 | Cum | 6,972 ₹24,053.40 | 6,942 ₹23,949.90 |
| 9.00 | Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification | 0.7 | MT | 9,565 ₹6,695.50 | 9,535 ₹6,674.50 |
| 10.00 | Reinforced Cement Concrete 1:1.5:3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 8.55 | Cum | 92,090 ₹7.9 L | 92,060 ₹7.9 L |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
19 Dec 2025, 3:00 pmClosed
BDO VP Walajabad
BDO VP Walajabad
Construction of 3.0m Span RCC Culvert to Athivakkam Village in Athivakkam Panchayat.
2025_RDTN_631230_1
5861/2025/A6 Dt 10.12.2025
Open Tender
Civil Works - Others
BDO office Walajabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
30 Jan 2026
12 Dec 2025
19 Dec 2025
12 Dec 2025
19 Dec 2025
12 Dec 2025
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B
Supply and filling foundation and basement with filling sand in layer not more than 15cm,thick well ramed,watered and compacted complete complying with standard specification
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification
Reinforced Cement Concrete 1:1.5:3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_754909.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid