Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC Less Quoted | |
| 2 | L2₹9.5 L+₹19,298.73 (2.07%)Rejected-AOC | L2 | Rejected-AOC Above Quoted |
| Sl No | Description | Qty | Unit | RMDCONSTRUCTIONS L2 | A.DASARATHAN L1 |
|---|---|---|---|---|---|
| 1.00Name of Work : Construction of Compound Wall to Burial Ground (L -141 m) at Thiruparuthikundram Village in Thiruparuthikundram Panchayat Under AGAMT II 2024-25 Estimate Amount : 9.50 Lakhs | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B | 50.01 | cum | 244 ₹12,202.44 | 224 ₹11,202.24 Lowest |
| 3.00 | Supplying and filling in foundation and basement with Filling Sand in layers not more 15 cm thick etc. complete. | 7.79 | cum | 1,528 ₹11,903.12 | 1,508 ₹11,747.32 Lowest |
| 4.00 | Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. incl all charges .complete. (75.31.2) | 9.69 | cum | 4,828 ₹46,783.32 | 4,808 ₹46,589.52 Lowest |
| 5.00 | Rein forced Cement concrete 11.5:3 mix using 20mm HBG metal for foundation and basement etc. complete.(75.40.10) | 31.69 | cum | 8,455 ₹2,67,938.95 | 8,435 ₹2,67,305.15 Lowest |
| 6.00 | Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete. | 217.7 | sqm | 496 ₹1,07,979.2 | 476 ₹1,03,625.2 Lowest |
| 7.00 | Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position | 2.69 | MT | 88,944 ₹2,39,526.19 | 88,924 ₹2,39,472.33 Lowest |
| 8.00 | B.W in cm 1:5 Mix using new Country bricks incl all cost and Conveyence incl All charges ( 75.31.10 ) | 0.1 | cum | 5,710 ₹571 | 5,690 ₹569 Lowest |
| 9.00 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.(75.31.22) | 4.59 | sqm | 268 ₹1,230.12 | 248 ₹1,138.32 Lowest |
| 10.00 | Supplying and fixing of RCC Jolly including cost and conveyance and all labour charges etc,. Complete. | 32.4 | sqm | 820 ₹26,568 | 800 ₹25,920 Lowest |
Tender Value
₹9.5 L
EMD Value
₹9,500
Closing Date
11 Mar 2024, 3:00 pmClosed
The Block Development Officer VP Kancheepuram
The Block Development Office Kancheepuram
Construction of Compound Wall to Burial Ground (L -141 m) at Thiruparuthikundram Village in Thiruparuthikundram Panchayat
2024_RDTN_437362_1
RC No.1009/2024 / KPM 7 A10 Dt.01.03.2024
Open Tender
Civil Works - Others
Turn-key
90 days
Kancheepuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,500
2 Dec 2025
4 Mar 2024
11 Mar 2024
4 Mar 2024
11 Mar 2024
4 Mar 2024
Amount
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Supplying and filling in foundation and basement with Filling Sand in layers not more 15 cm thick etc. complete.
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. incl all charges .complete. (75.31.2)
Rein forced Cement concrete 11.5:3 mix using 20mm HBG metal for foundation and basement etc. complete.(75.40.10)
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete.
Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position
B.W in cm 1:5 Mix using new Country bricks incl all cost and Conveyence incl All charges ( 75.31.10 )
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.(75.31.22)
Supplying and fixing of RCC Jolly including cost and conveyance and all labour charges etc,. Complete.
Plastering with CM 1:3, 10mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.(75.31.22)
Color washing Two coat with approved Emulsion Paint in all floors using best quality and approved varity of colour pigments including cost of all materials brushes and scaffolding charges etc. complete.as per std specifications
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RMDCONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .