| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance WATHORA CHADOORA BUDGAM KASHMIR J K 191113 | CHADOORA | BUDGAM | JAMMU AND KASHMIR | 191113 | -36.50% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹3.9 L (2.58%)Admitted-Finance | -34.86% | ₹1.6 Cr+₹3.9 L (2.58%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹6.0 L (3.94%)Admitted-Finance | -34.00% | ₹1.6 Cr+₹6.0 L (3.94%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹8.1 L (5.32%)Admitted-Finance | -33.12% | ₹1.6 Cr+₹8.1 L (5.32%) | L4 | Admitted-Finance |
| 5 | L5₹1.7 Cr+₹16.4 L (10.8%)Admitted-Finance | -29.65% | ₹1.7 Cr+₹16.4 L (10.8%) | L5 | Admitted-Finance |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
18 Aug 2026, 4:00 pmClosed
Executive Engineer RnB DIVISION SUMBAL
Sumbal Sonawari
Hajin (Chandgere road) (Improvement and Upgradation of Alternative Chandergeer Road including Protective Works)
2026_PWDJK_319974_1
NIT NO 42 OF 2026-27/SUMBAL DIVISION
Open Tender
Civil Works
Percentage
90 days
Sumbal Sonawari
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,500
Executive Engineer RnB DIVISION SUMBAL
₹4.8 L
22 Aug 2026
7 Aug 2026
19 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of cearified scarified material within all lifts and lead upto 1 km (by mechanical means). | 1,095 | Sqm | 5.55 | ₹6,077.25 |
| 2 | Engagement of JCB/Hydraulic Excavator for removal of humps, surface dressing, making good the undulations and levelling of surface, as per directions of EIC | 30 | Hour | 1,200 | ₹36,000 |
| 3 | Dismantling of Existing dilapidated irrigation shed including stacking of serviceable material and disposal of un-serviceable material | 1 | No | 20,000 | ₹20,000 |
| 4 | Supplying stacking, and laying of Quarry muck/RBM to specified lines, grades and cross sections incl watering, levelling to camber and consolidation by PRR 8-10 Tonne Capacity of Road Roller incl carriages of materials from source to site of work, complete job | 289.5 | cum | 1,000 | ₹2,89,500 |
| 5 | Supplying, Stacking at site, Aggregates of size range 63mm to 45mm incl Stone screening of size 13.2 mm nominal size, and binding material that is Khak Bajree /Moorum/Stone Dust, including Laying, Spreading and Compacting the above to WBM (GII) specifications in uniform thickness, hand picking, rolling with 3-Wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up the interstices of coarse
aggregate, watering and compacting to required density, incl all cost and carriage of materialsto site of work, with all leads, lifts, loading, unloading, stacking, haulage and octroi taxes.(Finished work to be measured, complete) as per Clause 405 of MOST Specifications | 502.5 | cum | 2,250 | ₹11,30,625 |
| 6 | Supplying, Stacking at site, Aggregates of size range 53mm to 22.4 mm incl Stone screening of size 11.2 mm nominal size, and binding material that is Khak Bajree /Moorum/Stone Dust, including Laying, Spreading and Compacting the above to WBM (GIII) specifications in uniform thickness, hand picking, rolling with 3-Wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding mateaterial to fill up the interstices of coarse aggregate, watering and compacting to required density, incl all cost and carriage ofmaterialsto site of work, with all leads, lifts, loading, unloading, stacking, haulage and octroi taxes.(Finished work to be measured, complete) as per Clause 405 of MOST specifications. | 412.5 | cum | 2,450 | ₹10,10,625 |
| 7 | Providing and laying of RCC Spun Pipes (NP3) incld. Earth work in excavation, refilling excavated earth in trenches, proper cushioning (on sides and top) and dressing incid. All cost and carriages of Pipes, complete job. 12" dia for various spots | 19.52 | RM | 3,000 | ₹58,560 |
| 8 | 18" dia for various spots | 14.64 | RM | 4,500 | ₹65,880 |
| 9 | 36" dia for various spots | 14.64 | RM | 8,000 | ₹1,17,120 |
| 10 | Construction of R/Walls/Edge walls:- Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 834 | cum | 256.85 | ₹2,14,212.9 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1061772.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .