Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹41.0 LAccepted-AOC | ₹41.0 L | L-1 | Accepted-AOC L-1 Bidders |
| 2 | L-2₹43.9 LRejected-Finance | ₹43.9 L | L-2 | Rejected-Finance Not L-1 Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | Abhishek Thakur L1 | Iravati Infra Services L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kind of Soil. | 540.75 | Cum | 91,927.5 ₹1.1 L | 1,08,150 ₹1.3 L |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand): 4 graded stone aggregate 40 mm nominal size). | 580.98 | Cum | 31,77,379.62 ₹37.5 L | 34,85,880 ₹41.1 L |
| 3.00 | Centering and Shuttering including propping etc and removal of form work for, Retaining wall, returns Wall, walls (any thickness) including attached pilasters buttresses, plingth and string courses fillets, kebs and steps etc. | 302.09 | Sqm | 54,376.2 ₹64,163.92 | 36,250.8 ₹42,775.94 |
| 4.00 | Providing and filling of Stone boulder behind Wall. | 175.1 | Cum | 78,795 ₹92,978.10 | 43,775 ₹51,654.50 |
| 5.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 123.6 | Cum | 30,900 ₹36,462 | 18,540 ₹21,877.20 |
| 6.00 | Providing and fixing wheep hole using U-PVC pipes (working pressure 4 kg / cm²) Single socketed pipe 110. | 202.05 | m | 36,369 ₹42,915.42 | 24,246 ₹28,610.28 |
| 7.00 | Finishing walls with water proofing cement paint of required shade :New work (Two or more coats applied @ 3.84 kg/10 sqm). | 54.41 | Sqm | 5,441 ₹6,420.38 | 2,720.5 ₹3,210.19 |
Tender Value
₹41.1 L
EMD Value
₹82,000
Closing Date
1 Nov 2025, 5:00 pmClosed
Dy General Manager (PnC)
Procurement and Contract Wing, CPS-I Khairi Distt. Chamba (HP) 176325
Restoration of damaged R/Wall in between Rd- 0/980km to 1/200km at Dam - Goli Road at CPS-1
2025_NHPC_881107_1
NH/CPS-1/PnC/W-1551/2025-26/ 264 Dated 11/10/2025
Open Tender
Civil Works - Roads
60 days
Chamera Power Station-1
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NHPC LIMITED
₹82,000
Yes
23 Jan 2026
11 Oct 2025
4 Nov 2025
11 Oct 2025
1 Nov 2025
11 Oct 2025
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kind of Soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand): 4 graded stone aggregate 40 mm nominal size).
Centering and Shuttering including propping etc and removal of form work for, Retaining wall, returns Wall, walls (any thickness) including attached pilasters buttresses, plingth and string courses fillets, kebs and steps etc.
Providing and filling of Stone boulder behind Wall.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and fixing wheep hole using U-PVC pipes (working pressure 4 kg / cm²) Single socketed pipe 110.
Finishing walls with water proofing cement paint of required shade :New work (Two or more coats applied @ 3.84 kg/10 sqm).
Iravati Infra Services (BID ID -3309532)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.54 MB
Tender.pdf
Tender Documents • 4.14 MB
BOQ_926108.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid