| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.4 LAccepted-Finance BHANSHAN CHOLA PUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | ₹41.4 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹44.2 LRejected-Finance | ₹44.2 L | L2 | Rejected-Finance REJECTED |
| 3 | L3₹42.4 LRejected-Finance HARIBHANPUR KALIKABARA VARANASI | BASTI | UTTAR PRADESH | 271305 | ₹42.4 L | L3 | Rejected-Finance REJECTED |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
19 May 2026, 12:00 pmClosed
S E VO VARANASI CIRCLE PWD VARANASI
S E VO VARANASI CIRCLE PWD VARANASI
SATTANPUR BARNI MARG SE RAISHIPUR ME RAISHIPU PATTI SRI PARAM HANSH AASRAM STHAL TAK MARG NAV NIRMAN KA KARYA
2026_CEUVZ_1147463_3
2229/183COM VARANASI CIRCLE PWD DATE 17/04/2026
Open Tender
Civil Works - Roads
180 days
VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.7 L
S E VO VARANASI CIRCLE PWD VARANASI
25 May 2026
11 May 2026
19 May 2026
11 May 2026
19 May 2026
11 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil using hydraulic excavator
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m As per Technical Specification Clause -302.3 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 24.2 | Cum | 20.4 | ₹493.68 |
| 2 | Construction of Embankment with approved material obtain from Borrow pits with all lift UPTO 1.5M, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table-300.1 and 300.2 with a lead up to 1000m as per Technical Specification Clause 301.5(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 7,151.3 | Cum | 73.5 | ₹5,25,620.55 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 501.88 | Cum | 2,300 | ₹11,54,324 |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes (45-63mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-2 as per Technical Specification Clause 405..(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 303.75 | Cum | 2,800 | ₹8,50,500 |
| 5 | Providing, laying, spreading and compacting of sukrut stone aggregates of specific sizes (22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | - | Cum | 3,000 | - |
| 6 | Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per sqm using mechanical means as per Technical Specification Clause 502. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 4,050 | Sqm | 40 | ₹1,62,000 |
| 7 | Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Air compressor as per Technical Specification Clause 503. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | - | Sqm | 17 | - |
| 8 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with three wheel static roller 80-100 kN capacity, finished to required level and grades to be followed by seal coat of Type-C as per Technical Specification Clause 508. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | - | Sqm | 191 | - |
| 9 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | - | Sqm | 70 | - |
| 10 | Brick edging on both side of road with first class brick 8cm (3”) wide 12cm (4.50”) deep laid with mud mortar including all materials, lab our, T&P etc. complete. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | - | Km | 78,000 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
T-2.pdf
Tender Documents • 0.47 MB
BOQ_2146717.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid