Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.0 LAccepted-Finance | L-1 | Accepted-Finance Qualified | |
| 2 | L-2₹11.3 L+₹30,339.03 (2.76%)Accepted-Finance 360 KRISHANA NAGAR HISAR HARYANA | HISAR | HARYANA | 125001 | L-2 | Accepted-Finance Qualified | |
| 3 | L-2₹12.5 L+₹1.5 L (14.0%)Accepted-Finance KATHA MANDI ROAD NEAR GOL DIGGI SIRSA HARYANA 125055 | SIRSA | SIRSA | HARYANA | 125055 | L-2 | Accepted-Finance Qualified | |
| 4 | L-3₹14.7 L+₹3.7 L (33.8%)Accepted-Finance N A | NA | NA | 121004 | L-3 | Accepted-Finance Qualified | |
| 5 | L-4₹12.8 L+₹1.8 L (16.4%)Accepted-Finance HARYANA HR | L-4 | Accepted-Finance Qualified |
| Sl No | Description | Qty | Unit | The Kanwarpura Sorav Coop L/C Society Ltd. L3 | THE SIRSA SARASWATI CO OP LC SOCIETY LTD L2 | THE MAA SHEETLA COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED L6 | THE MR BENIWAL COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY L4 | The Sirsa Ditya Coop L/C Society Ltd. L1 | THE JAI SHREE RAM COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | marbel statue of sh. atal bihari vajpayee 7.25 with base stand with packing of installtion charge | 1 | Each | 8,50,000 ₹8,50,000 | 8,33,530 ₹8,33,530 | 9,78,500 ₹9,78,500 | 8,86,000 ₹8,86,000 | 7,31,500 ₹7,31,500 Lowest | 9,43,540 ₹9,43,540 |
Tender Value
₹14.3 L
EMD Value
₹28,518
Closing Date
17 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
MC Sirsa
installation of statue of Sh.Atal bihari vajpayi at Atal park in f block ward no 28, mc sirsa (1st Time)
2026_HRY_559302_1
1
Open Tender
Civil Works
Tender
MC Sirsa
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹28,518
Yes
20 Nov 2026
7 Nov 2026
18 Nov 2026
7 Nov 2026
17 Nov 2026
7 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 4.14.1-Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), ncluding dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. | 19.11 | cum | 83 | ₹1,586.46 |
| 2 | HSR Item 6.1.6-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 3.19 | cum | 2,442 | ₹7,780.21 |
| 3 | HSR Item 7.21.2-Brick work with common burnt clay nonmodular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) | 5.54 | cum | 3,954 | ₹21,901.21 |
| 4 | HSR Item 10.49.1-Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge : 1. Flamed finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent. | 37.34 | Sqm | 1,759 | ₹65,675.78 |
| 5 | HSR Item 13.41-Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories and stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fi | 700 | Kg | 396 | ₹2,77,200 |
| 6 | HSR Item 6.14.1-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zoneIII): 3 graded stone aggregate 20 mm nominal size) | 5.21 | cum | 4,374 | ₹22,806.04 |
| 7 | HSR Item 6.34.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,000 | Kg | 68 | ₹68,000 |
| 8 | HSR Item 3.1.18-By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. | 25.49 | cum | 202 | ₹5,147.97 |
| 9 | HSR Item 6.30.3-Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform | 27.87 | Sqm | 208 | ₹5,797.17 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.87 MB
BOQ_639311.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .