Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC STATION ROAD UKHRA BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹2.6 L | L1 | Accepted-AOC TC recommendation |
| 2 | L2₹2.7 LRejected-Finance STATION ROAD P O UKHRA DIST BURDWAN PIN 713363 W B | UKHRA | BURDWAN | WEST BENGAL | 713363 | ₹2.7 L | L2 | Rejected-Finance TC recommendation |
| 3 | L3₹2.8 LRejected-Finance BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹2.8 L | L3 | Rejected-Finance TC recommendation |
| Sl No | Description | Qty | Unit | ANNAPURNA ENTERPRISE L2 | M S ELECTRICALS L3 | DUTTA ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | S.E. Copper wire ( for 30 HP) | 18 | kg | 890 ₹16,020 | 890 ₹16,020 | 890 ₹16,020 |
| 3.00 | F' class insulating materials | 1 | EA | 3,250 ₹3,250 | 3,500 ₹3,500 | 2,800 ₹2,800 |
| 4.00 | Cost of flexible glass lead for terminal connection. | 1 | EA | 3,950 ₹3,950 | 4,200 ₹4,200 | 3,700 ₹3,700 |
| 5.00 | Soldering like solder stick | 1 | EA | 2,800 ₹2,800 | 2,950 ₹2,950 | 2,500 ₹2,500 |
| 6.00 | Decarbonsing., cleaning, varnish nut, bolt etc. | 1 | EA | 2,900 ₹2,900 | 2,950 ₹2,950 | 2,600 ₹2,600 |
| 7.00 | Rewinding charges (15% of S.E.Copper wire) | 1 | EA | 3,000 ₹3,000 | 3,200 ₹3,200 | 2,800 ₹2,800 |
| 8.00 | Dismantling of broken shaft from rotor by using hydraulic puller | 1 | EA | 5,950 ₹5,950 | 6,250 ₹6,250 | 5,700 ₹5,700 |
| 9.00 | New materials supply (Rotor shaft) | 80 | kg | 135 ₹10,800 | 140 ₹11,200 | 132 ₹10,560 |
| 10.00 | Making new rotor shaft with machining as per dimension of original shaft | 1 | EA | 12,900 ₹12,900 | 13,500 ₹13,500 | 12,500 ₹12,500 |
Tender Value
₹2.6 L
EMD Value
₹3,300
Closing Date
20 Mar 2026, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
(A) (a) Complete repairing n rewinding of (A)22KW/30HP Marathon Make 1470 RPM 550 V (B) Complete repairing n rewinding of GEC make 150HP 1480RPM 550Volt main ventilation fan motor
2026_ECL_356206_1
ECL/GM/BA/E TENDER/25-26/ENM/372 Dt 10.03.2026
Open Tender
Electrical and Maintenance Works
15 days
Kumardihi A Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,300
8 May 2026
10 Mar 2026
21 Mar 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
10 Mar 2026 - 14 Mar 2026
Item Description/ Heading
S.E. Copper wire ( for 30 HP)
F' class insulating materials
Cost of flexible glass lead for terminal connection.
Soldering like solder stick
Decarbonsing., cleaning, varnish nut, bolt etc.
Rewinding charges (15% of S.E.Copper wire)
Dismantling of broken shaft from rotor by using hydraulic puller
New materials supply (Rotor shaft)
Making new rotor shaft with machining as per dimension of original shaft
Refitting of rotor shaft by using hydraulic puller
Dismantling & refitting charges
S.E. Copper wire ( for 30 HP)
F' class insulating materials (15% of S.E.Copper wire)
Cost of flexible glass lead for terminal connection.
Soldering like solder stick
Decarbonsing., cleaning, varnish nut, bolt etc.
Rewinding charges (15% of S.E.Copper wire)
Mechanical job: both side housing as per bearing size sleeve making and fixing as per proper bearing size.
Both side shaft bearing size welding, machining
Motor dismantling & refitting charges
Dismantling of motor (150 HP)
Cost of super enameled copper wire
Cost of insulating materials (15% of S.E.Copper wire)
Labour cost for rewinding of motor (15% of S.E. Copper wire)
Cost of copper flexible lead with socket'
Dismantling of broken rotor bar
Cost of new Electrolyte grade copper bar
Machining the new copper bars as per size.
Inserting new copper bars in slots.
Cost of rupton rod, DA, oxygen etc.,
Bearing portion worn out of copper shaft
Fixing sleeve in worn out in bearing journal
Making new grease cap
Making new check nut
Decarbonising/cleaning & refitting of motor
Transporting charges
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 1.20 MB
Tendernotice_3.pdf
PDF • 0.18 MB
BOQ_369054.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid