| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC AT KURPANIA PO SANDAY BAZAR DISTT BOKARO JHARKHAND 829127 | BOKARO | BOKARO | JHARKHAND | 829127 | ₹1.6 L Quoted ₹1.4 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.9 L+₹54,509.84 (39.4%)Rejected-Finance AT PO SUNDAY BAZAR DIST BOKARO JHARKHAND | ₹1.9 L+₹54,509.84 (39.4%) | L2 | Rejected-Finance As per approved TCR |
| 3 | L3₹2.7 L+₹1.3 L (97.4%)Rejected-Finance SUBHASH NAGAR AMLO P O BERMO DIST BOKARO JHARKHAND | ₹2.7 L+₹1.3 L (97.4%) | L3 | Rejected-Finance As per approved TCR |
Tender Value
₹4.2 L
EMD Value
₹5,300
Closing Date
25 May 2026, 4:00 pmClosed
P E (Civil) AKKOCP, BnK Area
P E (Civil) AKKOCP, BnK Area PO. Sunday Bazar, Bokaro Jharkhand PIN -829127
Installation of pillars around Forest Boundary for demarcation purpose at Konar Exp. OCP of BnK Area
2026_CCL_359663_1
PE(C)/AKKOCP/E -Tender/26-27/01
Open Tender
Civil Works - Others
Percentage
45 days
AKKOCP
As per NIT
3 documents required · 3 mandatory
₹5,300
4 Jul 2026
15 May 2026
26 May 2026
16 May 2026
25 May 2026
16 May 2026
16 May 2026 - 19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | CUM | 205.8 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | CUM | 7,424.45 | - |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | 105.6 | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | - | CUM | 277.9 | - |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work | 1 | SQM | 112.3 | ₹112.19 |
| 6 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.16 MB
BOQ_372524.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .